Skip to content
Australian Tunnelling Society Logo Australian Tunnelling Society Logo Australian Tunnelling Society Logo
  • About Us
    • ATS 50 year anniversary
    • Awards
      • Allen Neyland Award
      • David Sugden Award
      • Women in Tunnelling Award
    • Becoming a Member
    • Climate Change Position Statement
    • Committee Members
    • Diversity And Inclusion Protocol
    • Diversity in Tunnelling Sub-Group
    • Engaging with the ATS
    • Sponsors
    • Tunnel Systems, Operation and Maintenance group
    • Young Members Committee
  • News
  • Events
  • Opinions
  • Resources
    • A&NZ Journal
    • ATSym
    • ATS Shirts
    • ATS Tunnel Design Guideline
    • ITA-AITES
      • ITA News
      • ITA Events
      • ITAcet Lunchtime Series
    • Mentor Alliance
    • Podcasts
    • Training Courses
    • Tunnel Projects
    • Webinars
    • Working Group Papers
  • Members Section
  • Contact Us
  1. Home
  2. Uncategorized
  3. Building around existing tunnels seminar – presentations
Previous Next

Building around existing tunnels seminar – presentations

Penny Jones2023-05-25T14:47:07+10:00

Please click on the bullet point links below to download the presentations at the Building around existing tunnels seminar on the 27 April 2023

  • Full seminar proceedings
  • Barangaroo South protecting a future rail corridor
  • Preliminary Impact Assessment for New Building Applications over existing Tunnels
  • Design of the Cross River Rail station caverns for future over tunnel development
  • Risk Assessment for Development Adjacent to Underground Rail Corridors
  • Technical Assessment of New Developments’ Impact on Historical and Recent Tunnels in Melbourne
  • A case study Tunnelling adjacent to major water transfer tunnels
  • Ground response due to deep excavations adjacent to underground infrastructure in Sydney
  • Modelling considerations for the impact of loading on brittle brick lined oviforms 
  • City Shaping Infrastructure Projects: The Sydney Metro Corridor Protection Development Review Process
  • Basement excavation analysis potential impact on the North Georges River Sewer tunnel

 

Related Posts

Draft ATS Position Paper on achieving, demonstrating and accepting appropriate fire safety in Australian tunnels – Comment by 19 Sept 2025
Draft ATS Position Paper on achieving, demonstrating and accepting appropriate fire safety in Australian tunnels – Comment by 19 Sept 2025
Gallery

Draft ATS Position Paper on achieving, demonstrating and accepting appropriate fire safety in Australian tunnels – Comment by 19 Sept 2025

September 11th, 2025
The Mole – A new approach to tunnelling in Australia

The Mole – A new approach to tunnelling in Australia

September 8th, 2025
The “Shape Factor” in Estimation of Tunnel Inflows

The “Shape Factor” in Estimation of Tunnel Inflows

September 8th, 2025
Advanced jaw crusher unblock technology available in Australia
Advanced jaw crusher unblock technology available in Australia
Gallery

Advanced jaw crusher unblock technology available in Australia

March 11th, 2025
ABSTRACT SUBMISSION DEADLINE EXTENDED – Australasian Tunnelling Conference 2025
ABSTRACT SUBMISSION DEADLINE EXTENDED – Australasian Tunnelling Conference 2025
Gallery

ABSTRACT SUBMISSION DEADLINE EXTENDED – Australasian Tunnelling Conference 2025

January 29th, 2025
Copyright 2025 Australian Tunnelling Society | Privacy Policy
Page load link