Rozelle Interchange Project – Presentation and Q&A

EA Sydney Office Mezzanine Level, 44 Market Street, Sydney, New South Wales, Australia

Overcoming the complex geometry and geology during design and construction of the Rozelle Interchange tunnel network THURSDAY 1 AUGUST - REGISTRATION LINK NOW AVAILABLE! Rozelle Interchange was the final stage (Stage 3b) of the WestConnex project. As stated in the project title, ‘Interchange’, this project linked the M4 East and M4-M8 Link projects with the ...

DAARWIN-GEMINI A novel tool to predict advance rate of a TBM in real-time

Online and in person at: Level 9, 340 Adelaide Street, Brisbane

Overview SAALG Geomechanics, in collaboration with ACCIONA, has developed DAARWIN-GEMINI, a software system designed to optimize the performance of tunnel boring machines (TBMs) using machine learning-based techniques. The system key features include an advanced architecture for querying and processing data from the TBM database, big data analysis and visualization in a web browser, a ground-machine ...

ITA Lecture – EPB tunnelling: environmental aspects and re-use opportunities of the conditioned muck

Online

The rapid development of mechanised tunnelling in the last decades has increased the tunnelling community’s focus on the environmental aspects of tunnel construction. The excavation carried out by using EPB (Earth Pressure Balance) machines often requires the use of foaming agents, specific products that are added to the medium intended to be excavated, in order to ...

Hobsons Bay main Yarra crossing duplication project

Melbourne Engineers Australia office

The Hobsons Bay Main Sewer (HBMS), constructed in the 1960s, transfers approximately 30 per cent of Melbourne’s wastewater to the Western Treatment Plan at Werribee. The sewer alignment has a single sewer crossing under the Yarra River, which has deteriorated to a point where it requires rehabilitation and/or replacement. The Hobson Bay main Yarra crossing ...

ITA Lecture – Practical Aspects of Segmental Tunnel Lining Design

Webinar - Online only

Topic: Practical Aspects of Segmental Tunnel Lining Design After several decades of continuous progress, mechanized tunnelling has now become the main method applied in almost all types of geology, all sizes, and in increasingly shorter lengths. The predominant excavation support system for TBM tunnels consists of a one-pass precast concrete segmental liner which in addition ...

North East Link SEM Ventilation Tunnel and Adit Construction

Delve Underground Level 15 / 385 Bourke Street, Melbourne, Victoria, Australia

Overview The construction of the North East Link (NEL) tunnels is well underway! The largest transport infrastructure project in Victorian history consists of 6.5 km tunnels from Watsonia to Bulleen, and it will complete Melbourne’s orbital freeway network. The presentation will provide an overview of the recently constructed ventilation tunnel and adits using Sequential Excavation ...

ATS technical session: Design of large underground caverns for pumped hydro projects

Online and in person at: Level 9, 340 Adelaide Street, Brisbane

Overview This webinar will be focused on the design of large underground caverns, a crucial topic with the current development of multiple Pumped Hydro schemes. The main speaker will be Mousa Hazrati Aghchai, who has a PhD in rock mechanics and a solid background in geotechnics/rock mechanics in Tunnelling, Hydropower, and Dam engineering with 20 ...

ITA Lecture Series – Face Stability Issues

Webinar - Online only

This instalment of the Lunchtime lecture series will focus on practical Face Stability Issues. This episode will feature three lectures: • Examples of tunnel face instability on site - Elena Chiriotti • Overview of mechanisms and methods to evaluate tunnel face stability - Nicolas Berthoz • Case of deep tunnels in a clay medium - ...