

Preparing Citylink for Integration with Westgate Tunnel Project
April 28 @ 5:30 pm - 7:30 pm AEST
Please join us for a hybrid event: Preparing Citylink for Integration with Westgate Tunnel Project
Overview
On completion of the West Gate Tunnel (WGT) Project, together with CityLink, Transurban’s integrated road network in Victoria will be operable from a single primary location.
Discover how one of our largest infrastructure projects is being seamlessly integrated, while maintaining the Customer Experience, Functional Resilience, and Business Continuity that we provide on Victoria’s most heavily trafficked road corridors.
This presentation will provide insight into our associated strategy, risk landscape, integration sequencing and operational readiness.
Registrations are essential
Timings
In person: 5.30-7.30 AEST
Online: 6:00pm-7:00pm AEST
Program
5.30 pm – 6.00 pm AEST Networking (catering provided)
6.00 pm – 7.00 pm AEST Presentation
7.30 pm – AEST Event concludes
Speaker
Simon Irving
Engineering Manager, MIEAust NER MIMechE CEng
www.linkedin.com/in/simontirving
Simon Irving is an Engineering Manager at Transurban. A recognised Strategic Leader, Chartered Professional Engineer and certified Project Manager, Simon has 20 years’ international experience in Engineering Leadership, Project Delivery, and Asset Management of large-scale, complex, and critical infrastructure.
Simon has spent the majority of his career in Australia, as well as stints in Europe, China and the Middle East, with a focus on delivery, integration, and operations of multi-disciplinary engineering solutions in metallurgy, materials handling, and transport industries.
Event Sponsor
Tunnel and Civil Constructability Consulting