Loading Events

Overview

This ATS technical tour offers a rare behind-the-scenes look at the Western Harbour Tunnel segment yard. Attendees will gain insights into precast segment design, production logistics, and site operations. The visit includes a short technical presentation, a guided site tour, and networking opportunities. Ideal for engineers, designers, and tunnelling professionals seeking practical knowledge and industry connection.

The Western Harbour Tunnel is a major infrastructure project aimed at reducing traffic congestion on key Sydney routes, including the Anzac Bridge, Sydney Harbour Bridge and Sydney Harbour Tunnel. It features 6.5 kilometres of dual three-lane tunnels extending from the Warringah Freeway in Cammeray to the WestConnex interchange at Rozelle. Stage 2 includes the construction of approximately 4.5 kilometres of tunnel from Birchgrove under Sydney Harbour to North Sydney.

Parking available: Numbers are limited. Please only register for the event if you plan on attending, no-shows will take the opportunity away from others

Learning outcomes

In this presentation, you will:

  • know engineers who are familiar with the basics of tunnelling or precast concrete segments, and the role they play in tunnel construction
  • want to see in real life how segment design principles are applied, understand the logistics of large-scale precast production, and learn how design integrates with site operations
  • gain practical insights into TBM segment design, observe real-world yard operations and quality control processes, and connect these technical aspects with project delivery and industry best practice.

Program

In-person:

  • 2.00 pm AEDT: Arrival
  • 2.10 pm AEDT: Presentation on TBM Segment Design
  • 2.30 pm AEDT: Presentation on the facility
  • 2.50pm AEDT: Facility tour
  • 4.00pm AEDT: Leave site

About the speaker

Headshot of Carlos Sanabria Este
Carlos Sanabria Este
Project Manager
Carlos is a highly accomplished and dynamic Civil Engineering professional with a successful career spanning 18+ years. He is leading the Western Harbour Tunnel Pre-cast facility construction and operation.

PPE required

  • steel cap boots
  • hard hat
  • high-visibility vest

Otherwise, please contract Thomas.Roper@acciona.com and some can be provided, limited numbers.

Share This Story, Choose Your Platform!