BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Australian Tunnelling Society - ECPv6.15.20//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-ORIGINAL-URL:https://australiantunnellingsociety.com.au
X-WR-CALDESC:Events for Australian Tunnelling Society
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:Australia/Brisbane
BEGIN:STANDARD
TZOFFSETFROM:+1000
TZOFFSETTO:+1000
TZNAME:AEST
DTSTART:20220101T000000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=Australia/Brisbane:20231207T190000
DTEND;TZID=Australia/Brisbane:20231207T200000
DTSTAMP:20260428T173543
CREATED:20231128T014750Z
LAST-MODIFIED:20231128T014750Z
UID:18578-1701975600-1701979200@australiantunnellingsociety.com.au
SUMMARY:Considerations for designers and constructors to deliver practical operation and maintenance outcomes
DESCRIPTION:Overview \nGain insight into tunnel maintenance as the presentation contrasts key considerations for designers/constructors with maintenance regimes over tunnel operational service life. \nFocusing on the interface between tunnel systems is key to meeting design life requirements and ensuring a maintainable fit-for-service underground space. \nThe presentation will look at case studies both locally and internationally\, as well as provide insight into what systems are in place for tunnel maintenance after a project is handed over to the operator. \nLearning outcomes \nYou will gain insights on the general complexities with writing O&M manuals for civil aspects. This includes consideration for durability\, access\, frequency\, interpretation of design intent\, defining what is reasonable for maintenance and determining whether it can be reasonably completed. \n\nTunnel linings\, seepage and anchors.\nCable trays and infrastructure.\nVent stations.\nCut and cover areas.\nDrainage systems (groundwater and stormwater).\n\nAbout the speaker \nKaylah MacIntosh\, Technical Services Manager\, John Holland \n \nBased in Brisbane\, Kayla Macintosh is a Mechanical Engineer with a Masters in Geophysics working for John Holland as a Technical Services Manager. Kaylah is an experienced underground space engineer with design\, construction and maintenance experience in tunnelling & infrastructure spanning over 10 years. Kaylah has previously held roles in operational road tunnel capital works delivery\, which she leverages to drive improved Operation and Maintenance outcomes through smart tunnel system design solutions on in-flight projects. 
URL:https://australiantunnellingsociety.com.au/ats-event/considerations-for-designers-and-constructors-to-deliver-practical-operation-and-maintenance-outcomes/
LOCATION:Online and in person at: Level 9\, 340 Adelaide Street\, Brisbane
CATEGORIES:Queensland,Webinar
ATTACH;FMTTYPE=image/jpeg:https://australiantunnellingsociety.com.au/wp-content/uploads/2023/11/Capture.jpg
END:VEVENT
END:VCALENDAR