BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Australian Tunnelling Society - ECPv6.15.20//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Australian Tunnelling Society
X-ORIGINAL-URL:https://australiantunnellingsociety.com.au
X-WR-CALDESC:Events for Australian Tunnelling Society
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:Australia/Sydney
BEGIN:STANDARD
TZOFFSETFROM:+1100
TZOFFSETTO:+1000
TZNAME:AEST
DTSTART:20210403T160000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1000
TZOFFSETTO:+1100
TZNAME:AEDT
DTSTART:20211002T160000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1100
TZOFFSETTO:+1000
TZNAME:AEST
DTSTART:20220402T160000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1000
TZOFFSETTO:+1100
TZNAME:AEDT
DTSTART:20221001T160000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1100
TZOFFSETTO:+1000
TZNAME:AEST
DTSTART:20230401T160000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1000
TZOFFSETTO:+1100
TZNAME:AEDT
DTSTART:20230930T160000
END:DAYLIGHT
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=Australia/Sydney:20220303T183000
DTEND;TZID=Australia/Sydney:20220303T183000
DTSTAMP:20260427T223732
CREATED:20220201T034624Z
LAST-MODIFIED:20220201T034624Z
UID:16727-1646332200-1646332200@australiantunnellingsociety.com.au
SUMMARY:ATS Tunnel Design Guideline Presentation Series – Part 5
DESCRIPTION:Event Title: ATS Tunnel Design Guideline Presentation Series – Part 5: Constructability and Detailing\, Drawings and Documentation (Chapters 9 & 10)\nThis session will begin at 5.30 pm AEST (6.30 pm AEDT). \nThe ATS Tunnel Design Guideline Presentation Series will bring together the authors of the guideline to discuss in detail the chapter contents. The ATS Tunnel Design Guideline was released in September 2020 and this webinar series has been established to provide readers with further context to the material included. \nThis is the final webinar in a series of five presentations from authors of the ATS Tunnel Design Guideline will focus on chapters 9 and 10 which cover Constructability and Detailing\, Drawings and Documentation The presentation will be delivered by the chapter authors Carmen Hu\, Rachel Wang and Aaron Lippett. This event is suitable for students\, graduates and anyone working or interested in the design of tunnels. \nThis event is suitable for students\, graduates and anyone working or interested in the design of tunnels. \nThe presentation will be recorded and uploaded to the ATS website to provide additional context and content for the ATS Tunnel Design Guideline. \nSessions will run for approximately 45 minutes with 10 minutes of Q&A. You will have direct access to the authors of the relevant chapters and the opportunity to ask questions at the end of the presentation. \nREMINDER: After completing this registration form you will receive an email with a ics file attached. You must open this file to add the event to your calendar.
URL:https://australiantunnellingsociety.com.au/ats-event/ats-tunnel-design-guideline-presentation-series-part-5/
CATEGORIES:Webinar
ATTACH;FMTTYPE=image/jpeg:https://australiantunnellingsociety.com.au/wp-content/uploads/2021/10/TDG-events.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Australia/Sydney:20220308T180000
DTEND;TZID=Australia/Sydney:20220308T193000
DTSTAMP:20260427T223732
CREATED:20220210T041501Z
LAST-MODIFIED:20220307T033401Z
UID:16731-1646762400-1646767800@australiantunnellingsociety.com.au
SUMMARY:ATS NSW - Snowy 2.0 underground project overview and update
DESCRIPTION:This event can be joined in-person (Brisbane and Sydney) or online. \nThis presentation will cover project details of the underground works\, as well as an introduction into the adopted risk sharing mechanism for the project. \nIncluding a general snapshot of the underground activities as well as specific information related to: \n\nThe TBMs\, their Design and measurements taken during construction\nThe ground characterisation from measurements and observations onsite as well as\nDigital tools used to track the TBMs and monitor their performance\n\nThis event aims to provide a Snowy 2.0 project update and some insights into the current construction activities. Key learning outcomes and takeaways relate to project knowledge\, risk sharing mechanism\, TBM measurements\, progress and performance tracking tools as well as ground characterisation. Snowy 2.0 is a pumped hydro scheme linking two existing reservoirs\, characterised through 27km of waterway tunnels\, with a total of 40km of tunnelling works and an power station located 800m underground. \nSpeakers\nSabrina Kost\nManager\, Tunnels\, SMEC \nSabrina is the Group Manager for SMEC’s tunnels team in Sydney and a Chartered Principal Engineer with over 15 years of experience. Since joining SMEC in 2008\, Sabrina has been involved in the design\, planning & management of major complex underground infrastructure projects. She has extensive experience in the design of tunnels\, shafts and cavern support systems in challenging ground conditions\, ranging from hard rock to soft ground including subaqueous environments. Projects include TBM\, road header\, drill & blast and pipe jacking construction techniques. Sabrina also has a strong background in design review and compliance verification\, certification roles and due diligence. \nKara Stariha\nSenior Engineer\, Geotechnics\, SMEC \nKara is a Senior Geotechnical Engineer with 8 years’ experience\, working in SMEC’s Sydney Geotechnical team. Kara has worked on the geotechnical components of a range of multidisciplinary projects\, from road and rail to dams and tunnels. She has worked as a designer\, construction phase supervision\, and now more recently on the client’s side on Snowy 2.0. Kara’s primary interest is in ground characterisation\, rock mechanics\, tunnelling\, and the use of remote sensing in assessing the stability of rock slopes. \nVenues\n\nBrisbane: Stacey Agnew\, Unit 4\, 35 Limestone St\, Darra\, 4076\nRegister to attend in Brisbane.\nSydney: Engineers Australia Sydney Office\, 44 Market St\, Sydney\, 2000
URL:https://australiantunnellingsociety.com.au/ats-event/ats-nsw-snowy-2-0-underground-project-overview-and-update/
LOCATION:Harricks Auditorium\, Engineers Australia Sydney Office\, 44 Market Street\, Sydney\, New South Wales\, 2000\, Australia
CATEGORIES:New South Wales,Webinar
ATTACH;FMTTYPE=image/jpeg:https://australiantunnellingsociety.com.au/wp-content/uploads/2022/02/Snowy-2.0_0.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Australia/Sydney:20220324T180000
DTEND;TZID=Australia/Sydney:20220324T180000
DTSTAMP:20260427T223732
CREATED:20211207T041624Z
LAST-MODIFIED:20220130T215722Z
UID:16618-1648144800-1648144800@australiantunnellingsociety.com.au
SUMMARY:Management and maintenance of challenging tunnel sewer cleans
DESCRIPTION:In-person (Brisbane) and online \nWhilst the glamourous rail and road tunnels are visible and exciting to the public in the modern era with ample space to perform maintenance activities\, the forgotten world of utility tunnels are just as important in keeping our societies operating since the first millennium BCE. \nUtility tunnels are smaller than their larger transport cousins\, and with the added issue of noxious gas environments makes maintaining these tunnels inherently more difficult. Veolia undertakes routine maintenance activities on drainage networks including sewer tunnels. It is important to share the challenges faced with the management\, and maintenance of these tunnels after construction is completed. \nSpeaker\nLee Gnezdiloff  \nLee is currently a Project Manager for Veolia Network Services delivering challenging and complex maintenance projects within SEQ. With more than 20 years’ experience in the water and construction industry and as an RPEQ since 2007 he has been the engineer responsible for conveyance network designs from concept through to IFC drawing packages. \nAs a project manager\, Lee has managed teams to deliver network pipelines and pumping infrastructure\, and supporting infrastructure including civil buildings and structures\, dams (raw and tailings)\, creek diversions\, roads both flexible and rigid\, and bridges and culverts across various locations in Queensland. Lee has worked for various private and public clients\, specialising as a superintendent’s representative under the contract for conveyance networks and civil infrastructure construction projects for the past 10 years. \nEvent overview\nArrival and registration: 5.30pm – 6.00 pm AEST\nWebinar / presentation: 6.00pm – 7.00 pm AEST\nNetworking: 7.00pm – 7.30pm AEST
URL:https://australiantunnellingsociety.com.au/ats-event/management-and-maintenance-of-challenging-tunnel-sewer-cleans/
LOCATION:Brisbane
CATEGORIES:Queensland,Webinar
ATTACH;FMTTYPE=image/jpeg:https://australiantunnellingsociety.com.au/wp-content/uploads/2021/12/Feb-event-EA.jpg
END:VEVENT
END:VCALENDAR