BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Australian Tunnelling Society - ECPv6.16.5//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-ORIGINAL-URL:https://australiantunnellingsociety.com.au
X-WR-CALDESC:Events for Australian Tunnelling Society
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:Australia/Sydney
BEGIN:STANDARD
TZOFFSETFROM:+1100
TZOFFSETTO:+1000
TZNAME:AEST
DTSTART:20180331T160000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1000
TZOFFSETTO:+1100
TZNAME:AEDT
DTSTART:20181006T160000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1100
TZOFFSETTO:+1000
TZNAME:AEST
DTSTART:20190406T160000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1000
TZOFFSETTO:+1100
TZNAME:AEDT
DTSTART:20191005T160000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1100
TZOFFSETTO:+1000
TZNAME:AEST
DTSTART:20200404T160000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1000
TZOFFSETTO:+1100
TZNAME:AEDT
DTSTART:20201003T160000
END:DAYLIGHT
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=Australia/Sydney:20190305T173000
DTEND;TZID=Australia/Sydney:20190305T173000
DTSTAMP:20190214T041421Z
CREATED:20190214T041403Z
LAST-MODIFIED:20190214T041421Z
UID:14031-1551807000-1551807000@australiantunnellingsociety.com.au
SUMMARY:ATS VIC - Ground Model Development West Gate Tunnel Project\, Melbourne
DESCRIPTION:Key Speaker: Trevor O’Shannessy\, Principal Geotechnical Engineer\, Golder Associates \nDate: Tuesday 5 March 2019 \nTime: Commencing at 6: pm (with refreshments at 5.30pm) \nWhere: Engineers Australia\, Level 31\, 600 Bourke St\, Melbourne \nCost: Free\, refreshments provided (Please register at EA Victorian Division’s events page) \n\n\n\n\nThe West Gate Tunnel Project will provide an alternative river crossing to the West Gate Bridge. The key components of the Project include the widening of the West Gate Freeway\, a tunnel under Yarraville and an elevated motorway that connects the West Gate Freeway with the Port of Melbourne\, CityLink\, and the Melbourne central city. \nTrevor has over 15 years of experience in geotechnical engineering in a wide range of projects. He has been involved in a number major tunnelling projects situated in Melbourne’s complex geology\, including West Gate Tunnel\, Melbourne Metro\, East West Link and Melbourne Main Sewer. \nFor the West Gate Tunnel Project\, Trevor acted as an advisor to Transurban supporting concept through to reference design stages of the project. He continues to remain involved during the current construction phase of this important project. \nThe tunnelling component of the project will pass through variable sedimentary and igneous deposits of the Cainozoic (Quaternary & Tertiary) era. These deposits reflect the complex geological and geomorphological processes that have shaped the region\, including tectonic movements and development of “palaeo-valley” structures. \nThis presentation will discuss the early development of a ground model for the area based on pre-construction geotechnical studies.
URL:https://australiantunnellingsociety.com.au/ats-event/ats-vic-ground-model-development-west-gate-tunnel-project-melbourne/
CATEGORIES:Victoria
ATTACH;FMTTYPE=image/png:https://australiantunnellingsociety.com.au/wp-content/uploads/2019/02/geo-block-model-fro-abstract.png
END:VEVENT
END:VCALENDAR