BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Australian Tunnelling Society - ECPv6.16.5//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Australian Tunnelling Society
X-ORIGINAL-URL:https://australiantunnellingsociety.com.au
X-WR-CALDESC:Events for Australian Tunnelling Society
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:Australia/Sydney
BEGIN:STANDARD
TZOFFSETFROM:+1100
TZOFFSETTO:+1000
TZNAME:AEST
DTSTART:20180331T160000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1000
TZOFFSETTO:+1100
TZNAME:AEDT
DTSTART:20181006T160000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1100
TZOFFSETTO:+1000
TZNAME:AEST
DTSTART:20190406T160000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1000
TZOFFSETTO:+1100
TZNAME:AEDT
DTSTART:20191005T160000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1100
TZOFFSETTO:+1000
TZNAME:AEST
DTSTART:20200404T160000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1000
TZOFFSETTO:+1100
TZNAME:AEDT
DTSTART:20201003T160000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1100
TZOFFSETTO:+1000
TZNAME:AEST
DTSTART:20210403T160000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1000
TZOFFSETTO:+1100
TZNAME:AEDT
DTSTART:20211002T160000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1100
TZOFFSETTO:+1000
TZNAME:AEST
DTSTART:20220402T160000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1000
TZOFFSETTO:+1100
TZNAME:AEDT
DTSTART:20221001T160000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1100
TZOFFSETTO:+1000
TZNAME:AEST
DTSTART:20230401T160000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1000
TZOFFSETTO:+1100
TZNAME:AEDT
DTSTART:20230930T160000
END:DAYLIGHT
END:VTIMEZONE
BEGIN:VTIMEZONE
TZID:Australia/Melbourne
BEGIN:STANDARD
TZOFFSETFROM:+1100
TZOFFSETTO:+1000
TZNAME:AEST
DTSTART:20190406T160000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1000
TZOFFSETTO:+1100
TZNAME:AEDT
DTSTART:20191005T160000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1100
TZOFFSETTO:+1000
TZNAME:AEST
DTSTART:20200404T160000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1000
TZOFFSETTO:+1100
TZNAME:AEDT
DTSTART:20201003T160000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1100
TZOFFSETTO:+1000
TZNAME:AEST
DTSTART:20210403T160000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1000
TZOFFSETTO:+1100
TZNAME:AEDT
DTSTART:20211002T160000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1100
TZOFFSETTO:+1000
TZNAME:AEST
DTSTART:20220402T160000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1000
TZOFFSETTO:+1100
TZNAME:AEDT
DTSTART:20221001T160000
END:DAYLIGHT
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=Australia/Sydney:20220915T170000
DTEND;TZID=Australia/Sydney:20220915T193000
DTSTAMP:20220829T065202Z
CREATED:20220829T063702Z
LAST-MODIFIED:20220829T065202Z
UID:17101-1663261200-1663270200@australiantunnellingsociety.com.au
SUMMARY:The Past\, Present and Future of Mechanised Tunnelling
DESCRIPTION:ATS Victoria – In-person Technical Presentation by Martin Herrenknecht \n\nDate: 15th September 2022\nTime: 5:00 pm to 7:30 pm\nNetworking from 5:00 pm followed by refreshments served between 5:30 pm and 6:30 pm\nTechnical presentation from 6:30 pm to 7:30 pm\nLocation: Engineers Australia\, Level 31\, 600 Bourke Street\, Melbourne\, Vic 3000\nFormat: Face-to-face only (there will be no online option)\n\nPresentation details \nTunnelling is\, without a doubt\, one of the most innovative disciplines. Focused on innovative and cooperative development\, the collaboration amongst researchers\, owners\, designers\, construction contractors\, machine manufacturers and suppliers is surely one reason for this. The second factor is the market dynamics in tunnelling\, driven by a globalised world and increasing urbanisation: Around the globe\, emerging economies are expanding infrastructure in their urban and regional centres\, promoting the interlinking of individual economic hubs by means of new traffic\, supply and disposal systems. The general worldwide trend in the industry towards mechanisation and automation clearly demands a similar development in tunnelling. There are challenges ahead\, and we need to improve our excavation methods to overcome them – always learning from our past tunnel experiences. \nThis lecture considers the past\, present and future of mechanised tunnelling with a focus on the innovations developed since the 1970s and what lies ahead in mechanised tunnelling. \nAbout the speaker \nMartin Herrenknecht\, Dr.-Ing. E.h.\, founder and CEO of Herrenknecht AG \nMartin Herrenknecht is the company founder and name giver\, driving force and Chairman of the Board of Management of Herrenknecht AG. After completing his degree\, the graduate engineer (FH) began his career as a design engineer in Switzerland. This was followed by several positions\, some lasting several years\, as project and design engineering managers in Canada and Germany. From 1971 to 1975\, Martin Herrenknecht worked again in Switzerland as director of the mechanical engineering service at the Seelisberg Tunnel with “Big John”\, the world’s largest tunnel boring machine at the time. \n  \nIn 1975 Martin founded the Martin Herrenknecht Engineering Service Company\, then in 1977 the limited company Herrenknecht GmbH\, whose Managing Director he remained until it became a joint stock company. Martin Herrenknecht is responsible for Group Strategy\, Business Development\, Group Marketing & Communications\, Internal Audit and Mergers and Acquisitions. Martin Herrenknecht has received numerous prestigious awards and honours\, including an honorary doctorate (Dr.-Ing. E.h.) from the Carolo-Wilhelmina Technical University of Braunschweig (Brunswick)\, the Order of Merit of the Federal Republic of Germany\, entry into the Handelsblatt Hall of Fame of German Entrepreneurship\, the Lifetime Achievement Award of the International Tunnelling and Underground Space Association (ITA) as well as the Werner von Siemens Ring for his outstanding lifetime achievement as an inventor and entrepreneur. \nNetworking refreshments prior to the technical presentation will kindly be provided by Herrenknecht -Country representative: Charles Howarth <Howarth.Charles@herrenknecht.com> \n \nFor more information\, please contact Richard Buckingham via Richard.buckingham@wsp.com. \nCOST \nFree
URL:https://australiantunnellingsociety.com.au/ats-event/the-past-present-and-future-of-mechanised-tunnelling/
LOCATION:Melbourne Engineers Australia office\, Level 6\, 181 William Street\, Melbourne\, VIC\, Australia
CATEGORIES:Victoria
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Australia/Sydney:20220914T173000
DTEND;TZID=Australia/Sydney:20220914T193000
DTSTAMP:20220907T001142Z
CREATED:20220901T032138Z
LAST-MODIFIED:20220907T001142Z
UID:17108-1663176600-1663183800@australiantunnellingsociety.com.au
SUMMARY:Suburban Rail Loop – Ground Conditions and Tunnelling Challenges
DESCRIPTION:Date: 14th September 2022\, Wednesday\nTime: 5:30 pm to 7:30 pm\nNetworking from 5:30 pm to 6:00 pm\, for which refreshments are served\nTechnical presentation from 6:00 pm to 7:30 pm\nLocation: Lecture Hall\, Univ of Melbourne\, Level 2\, Kwong Lee Dow Building\, 234 Queensberry St\, Carlton VIC 3053\nFormat: Face-to-face only (there will be no online option)\n\nPresentation details \nSuburban Rail Loop (SRL) is a once-in-a-generation opportunity to shape the future liveability\, productivity and connectivity of Melbourne. \nThe 90km rail line will link every major rail line from the Frankston Line to the Werribee Line via Melbourne Airport\, better connecting Victorians to jobs\, retail\, education\, health services\, and each other. \nSRL will be delivered in three stages\, the first of which (SRL East) runs from Cheltenham to Box Hill\, consisting of 26km of twin tunnels and six underground stations. \nA range of geological and hydrogeological conditions are encountered along SRL East. This results in a range of geotechnical challenges for cut and cover excavations\, tunnelling\, and managing of environmental impacts. To manage these risks\, Suburban Rail Loop Authority (SRLA) has undertaken an extensive program of geotechnical investigations\, stakeholder engagement\, and design development. \nThis presentation provides: \n\nAn update on the project;\nAn overview of anticipated geological conditions;\nA summary of the ongoing geotechnical investigation program;\nOutlines some of the tunnelling and cut and cover challenges identified;\nPresents some of the geotechnical monitoring approaches adopted;\n\nAbout the speaker \n Speaker 1 \nStefan Hanke\, BSc\, MSc\, Package Director – Tunnels & Civils\, Suburban Rail Loop Authority\, Melbourne \nStefan has over 30 years of global experience on large-scale road\, rail and water projects across Australia\, New Zealand\, Asia\, Africa\, and Europe. With extensive procurement and delivery experience in a range of contract types\, he has played key roles in successful project acquisition\, civil/tunnel works delivery\, M&E works coordination\, and project completion. Stefan has worked on notable infrastructure projects from across the world\, including London’s Crossrail\, Metro Tunnel\, North East Link\, and the Waterview Connection project in Auckland. Now Package Director of Tunnels and Civils at Suburban Rail Loop Authority\, Stefan is responsible for the procurement and delivery of the SRL East tunnelling packages. \nSpeaker 2 \nChris Lyons\, BEng\, MEng\, CPEng\, Principal Geotechnical Engineer\, Tunnels & Civils\, Suburban Rail Loop Authority\, Melbourne \nChris has 25 years of experience as a geotechnical designer working on the successful delivery of a range of infrastructure and commercial projects from concept through to delivery. Chris has gained global experience working in New Zealand\, the UK\, UAE and Australia\, on major metro tunnel projects\, including Crossrail\, Metro Tunnel and Suburban Rail Loop. Chris leads the technical inputs to manage ground condition risks for Suburban Rail Loop\, including geotechnical investigations\, hydrogeological conditions\, tunnelling\, geotechnical retention design\, ground movement impacts\, instrumentation and monitoring\, spoil disposal and ground improvements. \n  \nFor more information\, please contact Jay Lee via jeawoo.lee@gsenc.com.
URL:https://australiantunnellingsociety.com.au/ats-event/suburban-rail-loop-ground-conditions-and-tunnelling-challenges/
LOCATION:230 Kwong Lee Dow Building\, 234 Queensberry Street\, Carlton\, VIC\, 3053\, Australia
CATEGORIES:Victoria
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Australia/Sydney:20220818T180000
DTEND;TZID=Australia/Sydney:20220818T190000
DTSTAMP:20220811T062351Z
CREATED:20220728T054800Z
LAST-MODIFIED:20220811T062351Z
UID:17074-1660845600-1660849200@australiantunnellingsociety.com.au
SUMMARY:Tunnel lighting functionality
DESCRIPTION:This presentation will discuss the various types of tunnel lighting and the development of tunnel lighting in Australia using case studies from various tunnel projects in Australia will describe the types and functionality of tunnel lighting systems. Tunnel lighting functionalities include: – Normal lighting that provides appropriate visibility for users\, both day and night – Safety lighting that provides minimum visibility for users\, to enable them to leave the tunnel in their vehicles in case of power outage. – Egress lighting to guide tunnel users on foot in the event of an emergency. During this sessions you will receive an overview of: – Different types of tunnel lighting – Tunnel lighting functionality – Tunnel lighting zones – Egress lighting – Different lighting systems used on Tunnels in Australia. \nPlease see speakers for the event below: \n\n \nShilpa Charegaonkar\nFIEAust CPEng\nTechnical Director\, Energy Mott MacDonald \nTechnical Director\, Electrical engineer with 20 years of experience in technical design and delivery of complex multi-discipline industrial engineering and infrastructure projects. Experience includes delivering a range of engineering solutions\, including concept planning\, design development\, safety identification and mitigation\, process improvement solutions\, potentially explosive atmosphere engineering\, project management and energy management systems. Power and lighting design\, documentation\, and construction phase services for various projects. With excellent communication and relationship building skills\, Shilpa is results focused and takes pride in ensuring the needs of stakeholders are met throughout the project and a high level of quality is maintained. \n\n \nAdrian Sterritt\nAssociate Director\, Lighting WSP \nWith over 30 years of designing lighting Adrian brings his lighting design experience to WSP. His understanding of the lighting techniques\, coupled with his management skills\, makes him an asset to any project. Adrian is the Melbourne Specialist Lighting Team Leader and as one of the senior project leaders on many diverse projects\, Adrian is able to apply his skill and design experience to any project. Working with all aspects of lighting he can find the best lighting outcome for any project. With experience in road\, rail\, retail\, urban realm theatre and heritage projects. \n\n \nJohn Rogers\nPrincipal Lighting Engineer WSP \nJohn Rogers has over 50 years’ experience in the lighting industry in various roles. He has special experience in roadway\, tunnels and public space lighting from a background in lighting design\, luminaire manufacturing and lighting project management. Joining WSP in 2010 he has been involved on numerous projects as lighting designer or in an advisory or verification capacity as well as conducting in house training on public lighting and tunnel/underpass lighting design with particular regard to the application of and compliance with relevant Australian Standards in the design procedure.
URL:https://australiantunnellingsociety.com.au/ats-event/tunnel-lighting-functionality/
LOCATION:Mott MacDonald L17\, Tower One\, Collins Square 727 Collins Street Melbourne VIC 3008\, Mott MacDonald L17\, Tower One\, Collins Square 727 Collins Street\, Melbourne\, VIC\, 3000\, Australia
CATEGORIES:Online,Victoria,Webinar
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Australia/Sydney:20220609T173000
DTEND;TZID=Australia/Sydney:20220609T193000
DTSTAMP:20220601T223459Z
CREATED:20220601T223459Z
LAST-MODIFIED:20220601T223459Z
UID:16998-1654795800-1654803000@australiantunnellingsociety.com.au
SUMMARY:ATS VIC - Challenges in creating caverns in urban areas - Melbourne Metro Tunnel
DESCRIPTION:Andrew Banks is the Caverns Director\, CBD Stations working on Melbourne’s Metro Tunnel Project. He will detail construction of the project’s CBD-based station caverns\, discussing strategies for the design and construction of the caverns and underground spaces below significant existing infrastructure. Andrew will outline cavern support practices\, including staging for excavation and cavern support\, as well as concrete elements for the cavern structures. \nAndreas Mindt is Construction Manager for the Metro Tunnel Project’s East Precinct. Responsible for managing all aspects of TBM tunnelling from South Yarra through to the new Town Hall Station in the CBD\, Andreas will discuss all aspects of cross passage construction\, from initial ground improvement considerations and related preparatory works\, through to excavation and construction. \nThe joint presentation will cover challenges faced during the construction of the Metro Tunnel Project and will shed light on how complex underground works were tackled in densely urbanised and geotechnically challenging areas. \nProgram:\n5.30 pm – 6.00 pm Networking (catering provided)\n6.00 pm – 7.00 pm Presentation\n7.30 pm – Event concludes \nSpeaker\nAndrew Banks MIEAust CPEng NER APEC Engineer IntPE(Aus)\nCaverns Director\, CBD Stations CYP Design & Construction Joint Venture \n \nAndrew Banks is currently working as Caverns Director\, CBD Stations on Melbourne’s Metro Tunnel Project. He is an accomplished civil engineer with a deep knowledge of the Australian and international tunnelling and micro tunnelling sectors and is proficient in all aspects of business development\, tendering and project delivery. \nAndrew has delivered projects across civil sectors including road and bridge construction\, sewer\, water and stormwater installation\, tunnelling\, earthworks\, concrete and steel structures. \nAndreas Mindt\nConstruction Manager\, CBD Stations CYP Design & Construction Joint Venture \n \nAndreas Mindt has 18 years’ experience in working on projects with pressurised tunnel boring machines (TBMs). He started his working career as a graduate engineer on the SMART tunnel project in Malaysia which\, at the time\, employed the fourth largest TBM ever used. After moving to Australia in 2006\, further work sent him to Singapore where he worked on metro tunnel projects in very challenging ground conditions. \nAndreas returned to Australia in late 2017 to help build the first TBM tunnels under Sydney Harbour and has recently completed TBM tunnelling of the eastern section of the Metro Tunnel Project\, including successfully tunnelling under the Yarra River \n \n 
URL:https://australiantunnellingsociety.com.au/ats-event/ats-vic-challenges-in-creating-caverns-in-urban-areas-melbourne-metro-tunnel/
LOCATION:Engineers Australia\, Vic Division\, Lvl 31\, 600 Bourke Street\, Melbourne\, Victoria\, 3000\, Australia
CATEGORIES:Victoria
ATTACH;FMTTYPE=image/jpeg:https://australiantunnellingsociety.com.au/wp-content/uploads/2022/06/State-Library-Station_1.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Australia/Sydney:20220428T180000
DTEND;TZID=Australia/Sydney:20220428T190000
DTSTAMP:20220421T090238Z
CREATED:20220404T225758Z
LAST-MODIFIED:20220421T090238Z
UID:16878-1651168800-1651172400@australiantunnellingsociety.com.au
SUMMARY:ATS 50th celebrations - legends panel discussion
DESCRIPTION:There’s never been a better time to be a tunneller in Australia. \nWith billions worth of upcoming tunnelling projects in the next decade\, we’ve assembled a panel of three legends of the industry to help us navigate the challenges and opportunities we face during this exciting time in the industry. \nThe event will be held as a face to face and webinar hybrid event across several Engineers Australia offices around the country and online. \nThe Legends Panel will comprise 3 individuals who are all regarded as well-respected ATS ‘legends’ in the tunnelling industry. The panel will take the form of a facilitated conversation chaired by Rachael McCarrison. \n  \n\nProf. Arnold Dix \n \n\nProfessor Arnold Dix is a barrister\, mediator\, dispute adjudicator\, consultant and expert on all matters relating to tunnelling\, underground infrastructure\, fire and disasters\, as well as broader civil planning and environmental disputes. His career over the past 30 years has celebrated a unique hybrid of engineering\, geology\, law and risk management matters. Arnold’s key strength is in his ability to bridge the gap between the legal and technical dimensions of a problem\, risk assessment or dispute.\nArnold’s approach in legal matters is practical and commercially minded\, appreciating the many factors that are intrinsic to complex disputes to do with tunnelling\, mining\, engineering and underground works. He has niche high level experience and a considered appreciation of the issues at hand\, as well as the many stakeholder interests to be taken into account\nArnold is the current Vice President of the International Tunnelling Association (Consultative Status to United Nations).\n\n\nDr Bill Bamford \n \n\nDr Bill Bamford is recognised as a world leader in the field of specialised rock testing with a lifetime of experience and research devoted to the area. He has established a fine team at BRTS – highly qualified young testing engineers\, an experienced Laboratory Manager and a competent administrator.\nIn 1967\, Dr Bill Bamford commenced lecturing\, performing research and managing a rock testing laboratory at the University of Melbourne.\nDr Bamford is currently an honorary Principal Fellow and Associate Professor in the Melbourne School of Engineering in the University of Melbourne. His specialisations include rock mechanics\, mine design\, geotechnical engineering. He held the position of Vice-President for the International Society for Rock Mechanics for 8 years. Other appointments include being the National Chairman of the Australian Geomechanics Society and of the Australasian Tunnelling Society.\n\n\nDiane Mather \n \n\nDiane Mather is a Design Manager for the Australian Rail Track Corporation’s (ARTC) $15.5 billion Inland Rail Program. She is responsible for the design management of the Gowrie to Heldion (G2H) section of the a Public Private Partnership Project and the technical lead for the three tunnels within the Gowrie to Kagaru (G2K project) scope the most technically complex sections of the Inland Rail alignment. The tunnels technical lead scope covers tunnel design and construction\, tunnel systems and fire life safety\, key features for the safe service offering of the project.\nDiane has more than 20 years’ experience in design and construction of civil infrastructure and mining projects\, and has successfully developed\, managed and delivered a wide range of design and construction programs across many disciplines. Prior to joining ARTC\, Diane delivered a range of design and construction work packages on several major projects including Clem7 (NSBT)\, Airport Link\, City Rail Link\, Westconnex M5East\, Westgate\, Sydney Metro\, Melbourne Metro and Brisbane Cross River Rail. Diane is a UK and Australia-registered chartered professional engineer and the winner of the inaugural Australian Tunnelling Society 2021 Women in Tunnelling Award.\n\n\nEvent program \nWebinar \n6.00 – 7.00 PM: Webinar \nIn-person event \n5.30 – 6.00 PM: Arrival and registration\n6.00 – 7.00 PM: Presentation\n7.00 – 7.30 PM: Networking \nEvent locations \nBrisbane \nEngineers Australia Hawken Auditorium\nLevel 9\, 340 Adelaide Street\, Brisbane QLD \nMelbourne (speakers presenting live from this location) \nWhite & Case \nLevel 32\, Rialto Towers \n525 Collins Street\, Melbourne VIC \nSydney \nEngineers Australia Harricks Auditorium\nMezzanine Level\, 44 Market Street\, Sydney NSW
URL:https://australiantunnellingsociety.com.au/ats-event/ats-50th-celebrations-legends-panel-discussion/
LOCATION:VIC
CATEGORIES:New South Wales,Online,Queensland,South Australia,Victoria
ATTACH;FMTTYPE=image/png:https://australiantunnellingsociety.com.au/wp-content/uploads/2022/04/Untitled.png
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Australia/Sydney:20220331T173000
DTEND;TZID=Australia/Sydney:20220331T190000
DTSTAMP:20220321T035035Z
CREATED:20220317T052749Z
LAST-MODIFIED:20220321T035035Z
UID:16855-1648747800-1648753200@australiantunnellingsociety.com.au
SUMMARY:Tunnel systems: three decades of Australian tunnel systems operation stall and axial fan parallel operation
DESCRIPTION:This event will be held online and in-person (Sydney\, Melbourne\, Brisbane). \nPresentation outline\nThis is the first technical session of the ATS Tunnel Systems Group. This technical session will be in three parts. \nPART 1\nThree Decades of Australian Tunnel Systems Operation Bob Allen\, General Manager Sydney Harbour Tunnel. Bob’s 30 years operating then managing SHT means that he has had a hand in almost the complete lifecycle of a tunnel\, missing only tunnel decommissioning. His insights on maintenance\, systems upgrading\, and process improvement are built over three major systems upgrade cycles\, understanding the approaches\, what is important and what works well. Through those 30 years\, societal approaches to safety have also moved on\, and SHT has been a leader in the change in tunnel operations\, driven in no small part by Bob. \nBob will lead us through some of the changes that have been made to SHT in tunnel systems\, operations\, and operational safety\, drawing lessons where applicable for road tunnels more generally. \nPART 2 \nLee Brown will discuss Stall & Axial Fan Parallel Operation. Lee has been to be involved with the majority of major Australian and New Zealand Road and Metro Tunnel infrastructure projects. Directly involved with the design and supply of Jet & Axial Fans\, Fire Dampers and Sound Attenuation. \nPART 3 \nThe technical session will Finish with an Update from Conrad Stacey on the AS4825 work of ATS the update of the Tunnel Fire Design Standard \nLocation\nThis event will be held in multiple locations: \n\nSydney: Aurecon Office\, Level 5\, 116 Military Road\, Neutral Bay\, NSW\nArrival and registration 5.00pm AEDT\nBrisbane: Stacey Agnew Office\, Unit 4\, 35 Limestone Street\, Darra\, QLD\nArrival and registration 4.00pm AEST\nMelbourne: Engineers Australia\, Level 31\, 600 Bourke Street\, Melbourne VIC\nArrival and registration 5.00pm AEDT\n\nImportant note: CPD records cannot be automatically recorded for this event and will need to be recorded by participants. \nSpeakers\nBob Allen\nGeneral Manager Sydney Harbour Tunnel\nBob started as a tunnel controller three months prior to the opening of Sydney Harbour Tunnel in August 1992\, becoming Operations Manager in August 1993. At the end of the concession period in August 2022\, Bob will finish up with the Sydney Harbour Tunnel Company\, having spent the last 23 years as its General Manager. Bob’s leadership within the tunnel community was instrumental in starting the Australian Tunnel Operators Group and in formalising training and qualification of tunnel operators. Bob’s initiatives on tunnel operations and safety come up in many conversations in the tunnel community\, with his philosophies and knowledge on tunnel operation and safety recognised internationally. \nLee Brown\nTunnel & Metro – Business Manager\nInvolved with ventilation for nearly 25 years\, with companies Fan Systems UK\, Witt & Sohn Germany\, Fantech Australia and more recently as Director of TROX Australia. Since moving to Australia\, Lee has been to be involved with the majority of major Australian and New Zealand Road and Metro Tunnel infrastructure projects. He is directly involved with the design and supply of Jet & Axial Fans\, Fire Dampers and Sound Attenuation\, with his first project being the Auckland Waterview Tunnel supplying the complete ventilation solution of Jet Fans\, Axial Fans\, Fire Dampers\, Sound Attenuation and transition ducts. \nConrad Stacey\nDirector Stacey Agnew\nConrad is the director of Stacey Agnew experienced in Tunnel Fire life safety and ventilation. Conrad is leading the ATS AS4825 working group
URL:https://australiantunnellingsociety.com.au/ats-event/tunnel-systems-three-decades-of-australian-tunnel-systems-operation-stall-and-axial-fan-parallel-operation/
LOCATION:VIC
CATEGORIES:New South Wales,Online,Queensland,Victoria
ATTACH;FMTTYPE=image/jpeg:https://australiantunnellingsociety.com.au/wp-content/uploads/2022/03/Tunnel-systems.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Australia/Melbourne:20210428T173000
DTEND;TZID=Australia/Melbourne:20210428T183000
DTSTAMP:20210414T105627Z
CREATED:20210407T054700Z
LAST-MODIFIED:20210414T105627Z
UID:15781-1619631000-1619634600@australiantunnellingsociety.com.au
SUMMARY:ATS WEBINAR - The Kitanomine Tunnel: A SEM Case Study
DESCRIPTION:Join the Australian Tunnelling Society Victoria Division for a presentation by Kensuke Date on the challenges faced in using the Water-tight Sequential Excavation Method (SEM) for Tunnel Construction with Difficult Ground Conditions in the construction of the Kitanomine Tunnel. \nThe Kitanomine Tunnel is a 2928 m long tunnel in Furano City\, as part of the Asahikawa-Tokachi Road running N-S in central Hokkaido\, Japan. The sequential excavation method (SEM) was used for the watertight tunnel construction.  However\, the geology of the Kitanomine Tunnel mainly comprised of mudstone\, welded tuff and alluvial fan deposits\, causing additional challenges for construction. The area was also rich in water resources and the alluvial fan deposits were found to be predominantly throughout the tunnel alignment with an identified active fault crossing the alignment. Effective grouting around the tunnel to mitigate the environmental impact was also a remarkable feature of the project. \nThe presentation by Kensuke will address the following: \n\nGeological challenges that were faced in implementing the tunnelling plan\nTunnel excavation and support strategies implemented\, including the use of tanked sections\nGrouting techniques which were developed for water tightness in rock\nImplementation of Field Testing to prove the effectiveness of the ground improvement\nGroundwater recovery after the tunnel excavation\n\nKeynote Speaker\nKensuke Date\nDeputy General Manager\,Kajima Technical Research \n \nKensuke Date has 25+ years of experience in Tunnelling and geotechnical engineering. He graduated from the University of Tokyo and then has worked for Kajima Corporation\, one of the largest construction companies in Japan. He has published a lot of peer-reviewed papers on tunnelling in journals and international conferences. He has served as a tunnelling specialist and design manager in challenging projects\, including the Kitanomine tunnel passing through an artesian aquifer with watertight tunnel support. \nKensuke is currently working at Kajima Technical Research Institute in Singapore as Deputy General Manager.
URL:https://australiantunnellingsociety.com.au/ats-event/ats-webinar-the-kitanomine-tunnel-a-sem-case-study/
LOCATION:VIC
CATEGORIES:Online,Victoria,Webinar
ATTACH;FMTTYPE=image/jpeg:https://australiantunnellingsociety.com.au/wp-content/uploads/2021/04/iStock-182060009.jpeg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Australia/Melbourne:20201119T170000
DTEND;TZID=Australia/Melbourne:20201119T170000
DTSTAMP:20201110T034606Z
CREATED:20201110T034249Z
LAST-MODIFIED:20201110T034606Z
UID:15547-1605805200-1605805200@australiantunnellingsociety.com.au
SUMMARY:ATS WEBINAR - Tunnelling Webinar
DESCRIPTION:Please click here for a flyer invitation to the “Tunnelling Webinar” which will be held on the following dates: \n\nThursday\, 19 November at 5:00pm AEDT\nThursday\, 26 November at 5:00pm AEDT\n\nThe speakers include: \n\nRichard Buckingham – Victorian Chair\, Australian Tunnelling Society\nPeter Chamley – CEO\, Arup Australiasia\nRichard Graham – Project Director\, SI-NRW JV\, Forrestfield Airport Link\nPaul Thomas – Deputy Director\, Road Projects Victoria\, Tunnels and Stations\nDavid Gibson – CEO\, DGA Group
URL:https://australiantunnellingsociety.com.au/ats-event/ats-webinar-tunnelling-webinar/
LOCATION:Webinar
CATEGORIES:Victoria,Webinar
ATTACH;FMTTYPE=image/jpeg:https://australiantunnellingsociety.com.au/wp-content/uploads/2020/11/Capture.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Australia/Sydney:20200610T180000
DTEND;TZID=Australia/Sydney:20200610T193000
DTSTAMP:20200517T225545Z
CREATED:20200517T225545Z
LAST-MODIFIED:20200517T225545Z
UID:15362-1591812000-1591817400@australiantunnellingsociety.com.au
SUMMARY:Modelling for ground conditions and BIM tunnel design in the Melbourne Formation
DESCRIPTION:Join the Australian Tunnelling Society and the Australian Geomechanics Society to hear about the Melbourne Formation and applications of BIM in tunnel design. \nModelling incorporates computer-based systems such as BIM and working simplifications of geological conditions. At this session\, speakers will outline the geological conditions typical of the Melbourne Formation and the way these conditions can be simplified into a working model. The use of Building Information Modelling (BIM) in tunnelling will also be presented through the work of an RMIT Masters student who is currently completing a one-year research project on the application of BIM in tunnelling. \nSpeakers\n \nJohn Smith | Associate Professor\, Discipline Leader\, Geotechnical & Infrastructure Engineering\, RMIT University \nJohn V. Smith has 28 years’ experience in teaching and research in science and engineering at universities in Australia and Japan. His research has been funded by a range of sources including the Australian Research Council. From 2008 to 2013 John worked as principal consultant at Coffey International. John is currently Discipline Leader\, Geotechnical & Infrastructure Engineering in the School of Engineering. John continues his involvement in engineering industry as a Fellow of the College of Civil Engineers and as a Chartered Professional Engineer with Engineers Australia. \n  \n  \n \nYijian Fan | Student\, MEng Civil\, RMIT University \nYijian is a graduate student in RMIT\, holding BSc and ME degrees. He focuses on the development of ground models using BIM techniques under the guidance of Dr Smith.
URL:https://australiantunnellingsociety.com.au/ats-event/modelling-for-ground-conditions-and-bim-tunnel-design-in-the-melbourne-formation/
LOCATION:VIC
CATEGORIES:Victoria,Webinar
ATTACH;FMTTYPE=image/jpeg:https://australiantunnellingsociety.com.au/wp-content/uploads/2020/05/Slide1-1.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Australia/Sydney:20200325T180000
DTEND;TZID=Australia/Sydney:20200325T200000
DTSTAMP:20200305T065212Z
CREATED:20200304T202421Z
LAST-MODIFIED:20200305T065212Z
UID:15159-1585159200-1585166400@australiantunnellingsociety.com.au
SUMMARY:ATS VIC - North East Link-The biggest road transport project in Victoria’s History
DESCRIPTION:North East Link will finally fix the missing link in Melbourne’s freeway network. The project will deliver a massive upgrade to the Eastern Freeway\, Melbourne’s first dedicated busway and more than 25 km of new and upgraded walking and cycling paths. \nVictoria’s biggest road infrastructure project includes that state’s longest road tunnels\, travelling for six kilometres\, protecting sensitive environmental and residential areas. \nFive new interchanges will connect the tunnels with the Eastern Freeway and other major arterial roads\, with the project slashing travel times by up to 35 minutes and taking 15\,000 trucks off local roads. \nMalcolm Short and Evan Stamatopoulos will talk through the state’s Reference Design\, focussing on the tunnels\, as well as discussing the key drivers and benefits for the project and the key project milestones. \n  \nSpeaker Information  \nMalcolm Short \nMalcolm Short is Director – Engineering for the North East Link Project (NELP) and is a Chartered Engineer\, Eng Exec and a Fellow of Engineers Australia. Prior to joining NELP in late 2017 he has had almost 40 years’ experience in roles with contractors and consultants working in Australia\, New Zealand\, the UK\, South East Asia and the Far East. \nMalcolm has had extensive involvement in major transport infrastructure projects including road\, rail\, tunnels and bridges and is currently working in the transaction team for procuring the main Public Private Partnership contract for the project. \n  \nEvan Stamatopoulos \nEvan Stamatopoulos is Principal Project Specialist – Tunnelling\, for the North East Link Project. Evan is a Chartered Professional Engineer and a Member of Engineers Australia\, with 37 years of professional experience as a civil engineer. The majority of Evan’s experience is in the tunnelling field. He has worked on tunnelling projects in Australia\, New Zealand\, South East Asia and Europe and is currently working in the transaction team for procuring the main Public Private Partnership contract for the project. \n \n  \nSponsor
URL:https://australiantunnellingsociety.com.au/ats-event/ats-vic-north-east-link-the-biggest-road-transport-project-in-victorias-history/
LOCATION:Engineers Australia\, Vic Division\, Lvl 31\, 600 Bourke Street\, Melbourne\, Victoria\, 3000\, Australia
CATEGORIES:Victoria
ATTACH;FMTTYPE=image/jpeg:https://australiantunnellingsociety.com.au/wp-content/uploads/2020/03/NEL-Birdeye-view-3.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Australia/Sydney:20191209T180000
DTEND;TZID=Australia/Sydney:20191209T200000
DTSTAMP:20191107T050853Z
CREATED:20190214T050418Z
LAST-MODIFIED:20191107T050853Z
UID:14068-1575914400-1575921600@australiantunnellingsociety.com.au
SUMMARY:ATS VIC - Latest developments in mechanized tunneling focusing on worldwide case studies
DESCRIPTION:Note this event is on Monday. Networking starts at 6pm\, talk at 6.30pm. \nOverview: \nThe presentation highlights the challenges and global trends in mechanized tunneling with some case studies. There are many challenges and each project faces its own obstacles like higher face pressure\, bigger diameter\, long tunnel routes\, ground conditions\, lower overburdens and in addition the local restrictions and standards around the world. \nSpeaker:      Mr. Thorsten Gaertner\, General Manager-Field Service Melbourne Projects \nThorsten Gärtner graduated from the FH Mainz University with a degree in Civil Engineering and then joined the Herrenknecht Company in 2000. \nHe started his career as a project engineer in the Field Service department\, working on various project sites\, in the Netherland\, Hong Kong\, Austria\, Switzerland\, Australia and California USA\, with some time in between spent back in Germany at the Headquarter. In 2005\, he was appointed as the Field Service Manager in Singapore to take care of the circle line project. After 3 years working in Singapore he returned to the Headquarter in Germany for 2 years before coming to Hong Kong to take on the role of Country Manager of Herrenknecht Hong Kong in 2009 until 2018. In 2019 he moved to Melbourne as General Manager- Field Service Melbourne Projects.
URL:https://australiantunnellingsociety.com.au/ats-event/ats-vic-latest-developments-in-mechanized-tunneling/
LOCATION:Engineers Australia\, Vic Division\, Lvl 31\, 600 Bourke Street\, Melbourne\, Victoria\, 3000\, Australia
CATEGORIES:Victoria
ATTACH;FMTTYPE=image/jpeg:https://australiantunnellingsociety.com.au/wp-content/uploads/2019/02/WGTP.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20191030
DTEND;VALUE=DATE:20191031
DTSTAMP:20191023T230652Z
CREATED:20190214T050346Z
LAST-MODIFIED:20191023T230652Z
UID:14066-1572393600-1572479999@australiantunnellingsociety.com.au
SUMMARY:ATS VIC - Groundwater and Tunnelling in Melbourne – considerations\, complexities and a recent project example and 2019 Australian Tunnelling Society Victorian Group Annual Special Meeting
DESCRIPTION:Groundwater and Tunnelling in Melbourne: considerations\, complexities and a recent project example \nRegistrations: https://www.engineersaustralia.org.au/event/2019/10/groundwater-and-tunnelling-melbourne-considerations-complexities-and-recent-project \n  \nThe hydrogeology of Melbourne is highly variable. The intersected and surrounding ground conditions of tunnelling projects will strongly influence the groundwater response and consideration for required groundwater control. This presentation will provide an overview of Melbourne’s hydrogeology as well as relating this to challenges in tunnelling projects. The example of groundwater assessment and control measures adopted for the EastLink project will be presented\, along with discussion on the implications for environmental and performance requirements for current tunnelling projects. \n  \nThe EastLink tunnels were constructed in an ecologically sensitive environment in eastern Melbourne. The project adopted strict tolerances on groundwater drawdown and tunnel ingress. In permanent design a fully tanked tunnel design option with compartmentalisation of the tunnel using cut-off and grout curtain was adopted which was a first in Australia. \n  \nBios: \n  \nPeter Campi \nPeter Campi has over 20 years of experience as a geologist\, engineering geologist\, and geotechnical engineer and is a graduate from RMIT. His experience spans both the mining and civil industries including underground and open pit mines\, civil road/rail/water tunnels\, and caverns and surface excavations. His underground experience in Melbourne include EastLink and most recently Melbourne Metro Tunnel Project. Peter is a Principal with Coffey. \n  \nBrigid Moriarty \nBrigid Moriarty has 15 years experience as a hydrogeologist and has a Bachelor of Engineering and Bachelor of Science from The University of Melbourne. Brigid has worked across the groundwater resources\, mining\, oil and gas and transportation and civil infrastructure sectors including road\, rail and water tunnels. She currently leads the specialist groundwater studies and input to the Melbourne Metro Tunnel Project for the Tunnel and Stations PPP package. Brigid is a Principal with Coffey. \n  \n2019 Australian Tunnelling Society Victorian Group Annual Special Meeting \nThe event will start with 2019 Australian Tunnelling Society Victorian Group Annual Special Meeting. The approximate duration of the ASM is 15min with the following agenda: \n\nApologies\nMinutes of 2018 ASM\nMatters Arising\nChairman’s Report\nFinancial Report\nElection of Committee\nOther Business\n\n  \nPlease forward nominations for membership of the committee\, and any business to be raised in the ASM meeting\, to anthony.bennett@aurecongroup.com by Tuesday 29th October 2019. \n  \nIf you would like to discuss Committee membership\, please feel free to contact: \nRichard Buckingham 0439 369 317 richard.buckingham@jhg.com.au \nTony Bennett 0412 529 028 anthony.bennett@aurecongroup.com \nRequirements for Committee membership are\, an interest in tunnelling and financial (or student) membership of the Australian Tunnelling Society. Your commitment will be to attend about six Committee meetings a year. Recently\, these have been held at 5 pm at Engineers Australia\, timed to precede an ATS Technical Session. However\, these arrangements can be changed to suit the new Committee membership. \n  \nThe rules for election are: \n\nATS is required to re-elect the local Committee every two years. On that basis\, we are now calling for nominations for eight vacancies in the general positions to form a new local Committee in Victoria. (four members are continuing their current terms).\nIf you would like to nominate yourself (or someone else with their agreement and details as follows)\, please provide your name as well as a brief statement about what you do and why you would be a good Committee member (refer to the guide below). Nominees must be financial members of the ATS.\nNominations must be received by the returning officer anthony.bennett@aurecongroup.com no later than Tuesday 29th October 2019. Late applications will not be eligible for election.\nIf eight or fewer general nominations are received; a Committee will be formed without a ballot. However\, if more than eight nominations are received\, we shall proceed to a ballot of the members present on the evening to elect the Committee.\n\n  \nSo that the Group functions effectively\, the expected contribution of the elected Committee members includes: \n1)            Organising at least one Technical Session per year\, individually or jointly. (Note that the venue booking and publicising is carried out by the Committee with Engineers Australia). \n2)            Attending the Committee meetings or sending apologies (and a report when needed) if unable to do so. \n3)            Assisting in the forming of sub-committees with at least four to six committee members\, plus others (industry representatives etc.) who could add value to the event when we are due to hold a conference or short course. \n4)            Actively participating in other activities. \n5)            Promoting and supporting the ATS within the tunnelling industry.
URL:https://australiantunnellingsociety.com.au/ats-event/ats-vic-groundwater-and-tunnelling/
LOCATION:VIC
CATEGORIES:Victoria
ATTACH;FMTTYPE=image/jpeg:https://australiantunnellingsociety.com.au/wp-content/uploads/2019/02/iStock-149073913_0.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20190925
DTEND;VALUE=DATE:20190926
DTSTAMP:20190621T025206Z
CREATED:20190214T050235Z
LAST-MODIFIED:20190621T025206Z
UID:14064-1569369600-1569455999@australiantunnellingsociety.com.au
SUMMARY:ATS VIC - Vibration in urban environments
DESCRIPTION:
URL:https://australiantunnellingsociety.com.au/ats-event/ats-vic-vibration-in-urban-environments/
LOCATION:VIC
CATEGORIES:Victoria
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Australia/Sydney:20190828T173000
DTEND;TZID=Australia/Sydney:20190828T193000
DTSTAMP:20190714T083440Z
CREATED:20190214T050157Z
LAST-MODIFIED:20190714T083440Z
UID:14062-1567013400-1567020600@australiantunnellingsociety.com.au
SUMMARY:ATS VIC - Water Ingress in Long TBM Tunnels: Its Mitigation and Control
DESCRIPTION:Overview\nThe 15km headrace tunnel for the Uma Oya Multipurpose Development project in Sri Lanka was excavated by double shield TBM and intersected large quantities of water. The study of this project with regards to better understanding the effects of the tunnel on the hydro-geology of the area\, identifying relevant in-tunnel investigation techniques\, and developing better pre-excavation and post excavation grouting systems is relevant to other long hard rock TBM projects. \nThe presentation will address why we need to limit the water ingress into tunnels under construction with regards to the potential effect on the environment with dewatering of surface and near surface aquifers\, the effect on the construction and its schedule\, and the methods available for prediction and control of ground water during tunnel excavation. The paper will also present examples from other projects around the world\, including past completed projects\, projects under construction and future planned projects\, detailing how such hazards have been or will be treated. \nSpeaker\nDavid Lees \nDavid Lees has over 35 years’ experience in the design and construction of underground works\, both in mining and civil tunnelling\, with particular expertise in grouting and ground treatment. He has worked in over 14 countries around the world as both consultant and contractor. From August 2015 to August 2018 David was Chief Site Supervisor on a 15km TBM tunnel in Sri Lanka. The project had enormous problems with water ingress – up to 1000l/s from the face – causing heavy delays to the project and widespread social and environmental problems. David joined the project halfway through and took the opportunity whilst on the project to prepare a thesis for a PhD through the local university of Peradeniya. The presentation is based on his PhD thesis. \nNOTE: This event starts with networking at 5:30PM followed by the presentation at 6:00PM-7:30PM.
URL:https://australiantunnellingsociety.com.au/ats-event/https-www-engineersaustralia-org-au-event-2019-06-water-ingress-long-tbm-tunnels-its-mitigation-and-control/
LOCATION:Engineers Australia\, Vic Division\, Lvl 31\, 600 Bourke Street\, Melbourne\, Victoria\, 3000\, Australia
CATEGORIES:Victoria
ATTACH;FMTTYPE=image/jpeg:https://australiantunnellingsociety.com.au/wp-content/uploads/2019/07/water-ingress.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Australia/Sydney:20190731T173000
DTEND;TZID=Australia/Sydney:20190731T190000
DTSTAMP:20190714T082809Z
CREATED:20190214T045749Z
LAST-MODIFIED:20190714T082809Z
UID:14060-1564594200-1564599600@australiantunnellingsociety.com.au
SUMMARY:ATS VIC - Microtunneling
DESCRIPTION:Overview\nJoin the Australian Tunnelling Society for a presentation on microtunnelling\, featuring some challenging trenchless projects across Australia such as Gold Coast Seaway project with a 1400m pipe jack bore in difficult ground conditions under the Broadwater and an 878m long HDD under the Nerang River. \nDavid Medcalf\, Trenchless Construction Manager for John Holland\, will be presenting about the projects\, as well as Victorian projects such as construction of the Epping Main Sewer and the Kalkallo Creek Main sewer\, including the challenging ground conditions that were overcome on these projects. O’Shannassy’s Reservoir Outlet Renewal project\, to be constructed as part of the Melbourne Water Capital Works Programme\, is another project in challenging ground conditions with igneous rock up to 260MPa combined with highly weathered material in a 450m bore through the mountainside. \nSpeaker\nDavid Medcalf\, Trenchless Construction Manager – John Holland \nDavid has 30 years’ experience in the tunnelling and underground construction Industry and now manages all small diameter and micro tunnelling within the John Holland Group. Having worked in some very prestigious projects in the UK like the Channel Tunnel and Jubilee Line Extension David moved to Australia in 2008 and has since had the opportunity to work in several countries around the world. \nNOTE: This event starts with networking at 5:30PM followed by the presentation at 6:00PM-7:30PM.
URL:https://australiantunnellingsociety.com.au/ats-event/ats-vic-micro-tunneling/
LOCATION:Engineers Australia\, Vic Division\, Lvl 31\, 600 Bourke Street\, Melbourne\, Victoria\, 3000\, Australia
CATEGORIES:Victoria
ATTACH;FMTTYPE=image/jpeg:https://australiantunnellingsociety.com.au/wp-content/uploads/2019/07/MG_9561.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20190626
DTEND;VALUE=DATE:20190627
DTSTAMP:20190621T025034Z
CREATED:20190214T045553Z
LAST-MODIFIED:20190621T025034Z
UID:14056-1561507200-1561593599@australiantunnellingsociety.com.au
SUMMARY:ATS VIC - Satellite Based Ground Deformation Monitoring
DESCRIPTION:Join Australian Tunnelling Society for this presentation where Eric Audigé will speak about radar satellite interferometry (InSAR) . \nIn urban tunnelling projects\, ground TICKETS deformation control and monitoring are important to guarantee that the different infrastructure assets crossing or adjacent to the tunnel alignment\nand other new build elements are not affected by the construction activity in the short or long term. \nRadar satellite interferometry (InSAR) is a non-invasive surveying technique which is able to measure millimetric motion of terrain structures over wide areas and brings to the user a comprehensive\, consistent and periodic vision of ground deformation without any need to access site. \nATLAS is Sixense InSAR solution applied to Crossrail I\, The Elisabeth Line in London and after a brief presentation of the technique\, this presentation will detail the application case of the monitoring of the different phases of the project with highlight to the added value for the parties involved. \nMeet the Speaker:\nEric Audigé: Managing Director\, Oceania – Sixense \nEric Audigé is an engineer with 30 years of experience in monitoring. He has driven the development and international applications in more than 20 countries of new monitoring solutions in a wide range of domains\, including the environment\, defence & security\, nuclear energy\, mining and civil construction. Eric relocated to Australia in 2009 and joined Sixense in 2013 as Managing Director of the Oceania branch to foster real-time monitoring in civil construction and mining. \nPlease note: Networking and refreshments will take place from 5.30pm\, with the presentation at 6.00pm \n\n\n\n\nDate: Wednesday 26 June 2019 \nTime: 5.30pm to 7.00pm \nVenue: Engineers Australia Victoria\, Level 31\, 600 Bourke Street\, Melbourne \nCost:Free for Members & Students/$30 for Non-Members \nSpeakers: Eric Audigé \nSession Contact: memberservices@engineersaustralia.org.au \nClick here to see flyer \nClick here to register
URL:https://australiantunnellingsociety.com.au/ats-event/ats-vic-satellite-based-ground-deformation-monitoring/
LOCATION:VIC
CATEGORIES:Victoria
ATTACH;FMTTYPE=image/jpeg:https://australiantunnellingsociety.com.au/wp-content/uploads/2019/06/img7.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20190529
DTEND;VALUE=DATE:20190530
DTSTAMP:20190531T040908Z
CREATED:20190214T045034Z
LAST-MODIFIED:20190531T040908Z
UID:14053-1559088000-1559174399@australiantunnellingsociety.com.au
SUMMARY:ATS VIC - Snowy Hydro
DESCRIPTION:Overview\nSnowy 2.0 is a proposed pumped-hydro expansion of the Snowy Mountains Scheme\, operated by dynamic energy company Snowy Hydro. The expansion will significantly add to the Scheme’s existing energy generation and large-scale storage capabilities\, securing system stability at times of peak demand. \nThe Snowy 2.0 Geotechnical Investigation has to date delivered over 21 km of borehole drilling from 40 boreholes of up to 1.1km in depth. GHD have worked closely with SHL and the owners team during the reference design development\, working iteratively and feeding the design team geological and geotechnical data to inform decisions on the placement and location of key structures. Working in pristine and remote Kosciusko National Park meant the project had logistical challenges to resolve to gather high quality information from remote locations\, using helicopters\, barges and all terrain vehicles to maximise accessibly and minimise disturbance to the highly sensitive environment. \nCo-hosted by the Victorian Civil College and the Australian Tunneling Society\, this seminar will provide an overview of the project\, including the specific constructions associated with a large-scale pumped-hydro station in order to ensure extensive generation and storage of energy. \nDiscussion will include the investigation scope\, direction drilling targeting key features from fixed surface locations\, execution of insitu stress and permeability testing\, a comparison of structural data acquisition from core orientation and downhole geophysics and the surface geophysical seismic refraction and reflection programme. \nSpeakers\nDave Evans: Director of Engineering\, Snowy 2.0 \n\nDave Evans is the Director of Engineering on Snowy 2.0 and has been working on the project since its inception in April 2017. Prior to joining Snowy 2.0\, Dave was the Australia New Zealand Hydropower and Dams Manager at SMEC and has been involved as a designer and expert review in international hydropower projects in Australia\, Nepal\, Papua New Guinea and Kenya. \nDamon Miller: Associate Engineer\, Dams & Hydro\, SMEC \n\nDamon Miller has worked on Snowy 2.0 since the project commenced with SMEC and Snowy Hydro in April 2017. Damon was the Design Manager for the Snowy 2.0 Feasibility Study and has been the Civil Design Lead for the Reference Design and Tendering for the 2000 MW pumped storage hydropower project. \nHelen Barbour-Bourne: Associate Engineering Geologist\, GHD Sydney \n \nHelen Barbour-Bourne is an Associate Engineering Geologist with GHD Sydney with a strong background in Project Managing and delivery of large scale complex and specialised site investigations from overseas projects at London Olympics 2012 and Crossrail\, to Oxley Highway to Kempsey and Woolgoolga to Ballina Pacific Highway Investigations. She has been Project Manager for the Snowy 2.0 Geotechnical Investigation Project since October 2017\, drawing together a specialist and skilled team of up to 80 people on site from across Australia\, New Zealand and Canada to deliver this amazing and challenging project. \nDaniel Kamphorst: Site Investigation Manager\, Snowy 2.0 \n \nDaniel Kamphorst is a Geotechnical Engineer\, responsible for managing the Snowy 2.0 Geotechnical Investigation program on site since October 2017\, more recently become the Site Investigation Manager. With a strong focus on highly specialised geological and geotechnical field work\, from PNG\, and across Australia. He has been critical to the execution of the complex scope required by the investigation which  includes three methods of insitu stress testing\, down hole geophysical logging and deep directional drilling\, essential to the delivery of the project. \n\n\n  \n\n\n\n\nDate: 29 May 2019 \nTime: 6.00m – 8.00pm \nVenue: Level 31\, 600 Bourke Street\nMelbourne \, Victoria \, 3000 \nCost: $30 for Members/$30 for Students/$60 for Non-Members \nSession Contact: memberservices@engineersaustralia.org.au \nClick here to see flyer \nClick here to register
URL:https://australiantunnellingsociety.com.au/ats-event/ats-vic-snowy-hydro/
LOCATION:VIC
CATEGORIES:Victoria
ATTACH;FMTTYPE=image/jpeg:https://australiantunnellingsociety.com.au/wp-content/uploads/2019/02/Talbingo-Dam_Snowy-Hydro-Image-1-1.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Australia/Sydney:20190501T180000
DTEND;TZID=Australia/Sydney:20190501T193000
DTSTAMP:20190430T223525Z
CREATED:20190214T044850Z
LAST-MODIFIED:20190430T223525Z
UID:14051-1556733600-1556739000@australiantunnellingsociety.com.au
SUMMARY:ATS VIC - A Sydney Heads Rail Tunnel & Airport Light Rail
DESCRIPTION:Join the Australasian Tunneling Society (ATS) for a presentation on opportunities for rail tunnels to improve Sydney’s rail connectivity. \nA rail tunnel under Sydney Heads would connect the Sydney CBD through to Gosford via a 60 km long tunnel extension from Bondi Junction Station on the Eastern Suburbs/Illawarra Line\, positioning Brookvale as a new satellite CBD\, only 15 minutes travel time from the Sydney CBD. The project could extend to a faster rail link between Newcastle\, the Sydney CBD and Canberra\, with another option being to connect Parramatta to the Sydney CBD and the Eastern Suburbs railway line through the existing Martin Place Station.  The latter option includes new station platforms and tunnels excavated directly under St James Station\, with another new line\, in tunnels\, perhaps extending to Malabar. \nThis presentation will discuss these options\, as well as the backgrounds and key aspects of the project concepts. \nThe feasibility and opportunities offered by an underground light rail link to Sydney’s airport will also be discussed: light rail can accommodate steeper gradients and tighter curves than heavy rail systems\, and there are possible connections into unused tunnel sections at Wynyard Station. A light rail route that connects North Sydney\, through the CBD and the University of Sydney has been proposed. \nTime: 6:00 to 7:30PM\nVenue: Engineers Australia Victoria\, Level 31 Bourke St\, Melbourne\nSpeaker: Ted Nye\nSession Contact: gcacchione@engineersaustralia.org.au \nClick here to see the flyer \nClick here to register \nSpeaker\nTed Nye: Director\, E J Nye & Associates Pty Ltd \nTed is a consultant specialising in underground engineering for transport related projects\, although he is also currently involved with a pumped storage hydro project. Commencing his career on the Melbourne Underground Rail\, Ted then gained extensive experience overseas before moving to Sydney as the Design Team Leader of the land tunnels of the Sydney Harbour Tunnel. More recent experience includes the Sydney Airport Line soft ground tunnel\, road and bus tunnels in Brisbane\, road tunnels Melbourne and Sydney (including recently as a specialist advisor)\,  and water supply and hydro tunnels in both NSW\, Victoria and overseas. Other recent rail projects include the Melbourne Metro (client side) and Sydney Metro Stage 1 (design). Ted conceived the initial concept of a rail tunnel under Sydney Heads as far back as 1996\, and canvased the idea to the then State-wide Roads. The concept was further developed during 2017 and 2018 with support from industry colleagues Peter Prince and Dr Sam Lackey.
URL:https://australiantunnellingsociety.com.au/ats-event/ats-vic-a-sydney-heads-rail-tunnel/
LOCATION:Engineers Australia\, Vic Division\, Lvl 31\, 600 Bourke Street\, Melbourne\, Victoria\, 3000\, Australia
CATEGORIES:Victoria
ATTACH;FMTTYPE=image/jpeg:https://australiantunnellingsociety.com.au/wp-content/uploads/2018/11/20-Feb-2019-feature-image-heads.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20190327
DTEND;VALUE=DATE:20190328
DTSTAMP:20190214T045856Z
CREATED:20190214T044358Z
LAST-MODIFIED:20190214T045856Z
UID:14049-1553644800-1553731199@australiantunnellingsociety.com.au
SUMMARY:ATS VIC - Metro tunnel construction in a complex urban environment subject to broad spectrum of geological and geographical conditions
DESCRIPTION:
URL:https://australiantunnellingsociety.com.au/ats-event/ats-vic-metro-tunnel-construction-in-a-complex-urban-environment/
LOCATION:VIC
CATEGORIES:Victoria
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Australia/Sydney:20190313T180000
DTEND;TZID=Australia/Sydney:20190313T193000
DTSTAMP:20190312T220910Z
CREATED:20190214T044258Z
LAST-MODIFIED:20190312T220910Z
UID:14047-1552500000-1552505400@australiantunnellingsociety.com.au
SUMMARY:ATS VIC - The David Sugden Award 2018
DESCRIPTION:Join Young Members of the Australian Tunnelling Society for an evening of informative presentations from the top three papers of the 2018 David Sugden Award. \nProudly provided by the Australian Tunnelling Society Young Members\, the authors of the top three David Sugden Writing Award winning entries will present a summary of their paper and provide insights into the award itself\, including the value of technical development and mentoring in tunnelling. \nDate\nDate: 13th March 2019\, 6pm start \nVenue\nAurecon Centre\, 850 Collins Street\, Docklands\, Melbourne 3008 \nSpeakers\nMatt Bennett | Transport Planner\, Aurecon (Winner\, David Sugden Award 2018) – Matt is a transport planner based in Melbourne. As part of a working group focusing on safety impacts on cyclists and pedestrians around Melbourne’s Metro Tunnel Project\, Matt’s technical paper outlines the need for the inclusion of vulnerable road users when selecting truck routes for spoil removal. \nAaron Lippet | Tunnel Engineer\, Aurecon (Runner-up\, David Sugden Award 2018) – Aaron’s paper is a case study on the construction of the Arncliffe Ventilation Connection from the New M5 tunnel in Sydney\, discussing the ground conditions\, technical solutions and construction methods used to construct the shafts and tunnels. Aaron is a Sydney-based tunnel engineer. \nBrodie Aitchison | Tunnel Engineer\, Aurecon (Runner-up\, David Sugden Award 2018) – A Brisbane-based tunnel engineer\, Brodie’s paper was on the Design and Construction of a Shallow Cover Tunnel Junction\, which was part of his design work undertaken on the WestConnex New M5 Tunnel. The paper outlines the design concept\, constraints\, methods used to design and build the tunnels. \n  \nSo\, who is David Sugden? \nDavid Sugden was the driving force behind the successful design of mechanical full-face rock excavation machinery over a number of years\, resulting in the forging of countless tunnels across the world. David continually showed a commitment to innovation and design throughout his career\, often custom making machinery to solve problems that arose and for which no existing devices were available or appropriate. As a result of this attitude\, David is listed as the inventor on over 40 patents. \nDavid was been recognised for his contribution to tunnelling and the mentoring of young engineers involved in the field in the form of the Allen Neyland Tunnelling Achievement Award in 1996\, an Order of Australia in 2002\, and the 2003 A.G.M. Michell Award for his outstanding contribution to Australian Mechanical Engineering. \nIn 2004\, the Australian Tunnelling Society started the David Sugden Award to encourage young engineers to develop the art of technical writing. \nATSym will host a roadshow of the top papers from the 2018 edition of the David Sudgen Award.
URL:https://australiantunnellingsociety.com.au/ats-event/ats-vic-the-david-sugden-award-2018/
LOCATION:VIC
CATEGORIES:Victoria
ATTACH;FMTTYPE=image/jpeg:https://australiantunnellingsociety.com.au/wp-content/uploads/2016/10/ATSym-Poster.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Australia/Sydney:20190305T173000
DTEND;TZID=Australia/Sydney:20190305T173000
DTSTAMP:20190214T041421Z
CREATED:20190214T041403Z
LAST-MODIFIED:20190214T041421Z
UID:14031-1551807000-1551807000@australiantunnellingsociety.com.au
SUMMARY:ATS VIC - Ground Model Development West Gate Tunnel Project\, Melbourne
DESCRIPTION:Key Speaker: Trevor O’Shannessy\, Principal Geotechnical Engineer\, Golder Associates \nDate: Tuesday 5 March 2019 \nTime: Commencing at 6: pm (with refreshments at 5.30pm) \nWhere: Engineers Australia\, Level 31\, 600 Bourke St\, Melbourne \nCost: Free\, refreshments provided (Please register at EA Victorian Division’s events page) \n\n\n\n\nThe West Gate Tunnel Project will provide an alternative river crossing to the West Gate Bridge. The key components of the Project include the widening of the West Gate Freeway\, a tunnel under Yarraville and an elevated motorway that connects the West Gate Freeway with the Port of Melbourne\, CityLink\, and the Melbourne central city. \nTrevor has over 15 years of experience in geotechnical engineering in a wide range of projects. He has been involved in a number major tunnelling projects situated in Melbourne’s complex geology\, including West Gate Tunnel\, Melbourne Metro\, East West Link and Melbourne Main Sewer. \nFor the West Gate Tunnel Project\, Trevor acted as an advisor to Transurban supporting concept through to reference design stages of the project. He continues to remain involved during the current construction phase of this important project. \nThe tunnelling component of the project will pass through variable sedimentary and igneous deposits of the Cainozoic (Quaternary & Tertiary) era. These deposits reflect the complex geological and geomorphological processes that have shaped the region\, including tectonic movements and development of “palaeo-valley” structures. \nThis presentation will discuss the early development of a ground model for the area based on pre-construction geotechnical studies.
URL:https://australiantunnellingsociety.com.au/ats-event/ats-vic-ground-model-development-west-gate-tunnel-project-melbourne/
LOCATION:VIC
CATEGORIES:Victoria
ATTACH;FMTTYPE=image/png:https://australiantunnellingsociety.com.au/wp-content/uploads/2019/02/geo-block-model-fro-abstract.png
END:VEVENT
END:VCALENDAR