BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Australian Tunnelling Society - ECPv6.15.20//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-ORIGINAL-URL:https://australiantunnellingsociety.com.au
X-WR-CALDESC:Events for Australian Tunnelling Society
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:Australia/Melbourne
BEGIN:STANDARD
TZOFFSETFROM:+1100
TZOFFSETTO:+1000
TZNAME:AEST
DTSTART:20240406T160000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1000
TZOFFSETTO:+1100
TZNAME:AEDT
DTSTART:20241005T160000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1100
TZOFFSETTO:+1000
TZNAME:AEST
DTSTART:20250405T160000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1000
TZOFFSETTO:+1100
TZNAME:AEDT
DTSTART:20251004T160000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1100
TZOFFSETTO:+1000
TZNAME:AEST
DTSTART:20260404T160000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1000
TZOFFSETTO:+1100
TZNAME:AEDT
DTSTART:20261003T160000
END:DAYLIGHT
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=Australia/Melbourne:20251001T173000
DTEND;TZID=Australia/Melbourne:20251001T193000
DTSTAMP:20260415T074321
CREATED:20250910T030525Z
LAST-MODIFIED:20250910T030525Z
UID:141506-1759339800-1759347000@australiantunnellingsociety.com.au
SUMMARY:Kidston Pumped Storage Hydro project
DESCRIPTION:Overview\nThe Kidston Pumped Hydro project represents an innovative approach to renewable energy storage through the transformation of abandoned mining infrastructure. Located northwest of Townsville in Queensland\, Australia\, this pioneering 250MW facility developed by Genex Power demonstrates how former gold mine pits can be repurposed as upper and lower water reservoirs for pumped storage hydropower. \nThe project showcases significant tunnelling and underground construction expertise\, featuring 235-metre deep shafts and extensive tunnel networks that form the critical waterways connecting the reservoirs. At the heart of the facility lies an underground powerhouse cavern housing two reversible pump turbines\, representing sophisticated underground engineering in challenging geological conditions. The scope encompasses a six-kilometre dam at the upper storage level and requires the pumping of over 25 billion litres of water from the lower storage to enable safe completion of underground construction works. A 187-kilometre transmission line connects the facility to the national grid via a substation near Townsville. \nThe project demonstrates comprehensive engineering integration across multiple disciplines\, including detailed design of both dam and underground infrastructure\, powerhouse engineering\, and construction supervision of tunnelling operations. Notably\, the project employed collaborative BIM modelling with all stakeholders to optimise the entire scheme design and construction coordination. \nAs Australia transitions toward renewable energy\, pumped hydro storage addresses the critical challenge of energy storage and grid stability. The Kidston project serves as a prototype for numerous large-scale pumped hydro developments planned across Australia and New Zealand\, with projects totaling over 4GW in the development pipeline. This presentation will explore the tunnelling challenges\, underground construction methodologies\, and innovative engineering solutions that make the repurposing of mining infrastructure a viable model for sustainable energy storage development. \nLearning outcomes\nIn this event\, you will learn: \n\nkey components of pumped storage hydropower projects\,\nground support design for large underground caverns\,\nconstruction outcomes and realisation of design.\n\nAbout the speaker\nAmit Narsey\nTechnical Director – Tunnels\, GHD\n\nAmit is a tunnelling engineer with over 13 years’ experience in the design and delivery of underground and geotechnical infrastructure in the rail\, road\, hydropower and water sectors. HIs key areas of technical competency are in the structural and geotechnical design of temporary and permanent ground support for tunnels\, caverns\, shafts and retaining structures. Amit undertakes and leads teams to deliver engineering services\, and as a chartered professional he is passionate about providing practical solutions to clients using my collaborative approach\, strong communication skills and experience working across various project stages including design\, construction\, operation\, and maintenance. Amit has worked on projects located in Australia\, New Zealand\, the USA and Qatar.
URL:https://australiantunnellingsociety.com.au/ats-event/kidston-pumped-storage-hydro-project/
LOCATION:Level 26 181 William Street\, Melbourne\, Victoria\, 3000
CATEGORIES:Victoria
ATTACH;FMTTYPE=image/jpeg:https://australiantunnellingsociety.com.au/wp-content/uploads/2025/09/Kidston.jpg
END:VEVENT
END:VCALENDAR