BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Australian Tunnelling Society - ECPv6.16.5//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Australian Tunnelling Society
X-ORIGINAL-URL:https://australiantunnellingsociety.com.au
X-WR-CALDESC:Events for Australian Tunnelling Society
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:Australia/Melbourne
BEGIN:STANDARD
TZOFFSETFROM:+1100
TZOFFSETTO:+1000
TZNAME:AEST
DTSTART:20230401T160000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1000
TZOFFSETTO:+1100
TZNAME:AEDT
DTSTART:20230930T160000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1100
TZOFFSETTO:+1000
TZNAME:AEST
DTSTART:20240406T160000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1000
TZOFFSETTO:+1100
TZNAME:AEDT
DTSTART:20241005T160000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1100
TZOFFSETTO:+1000
TZNAME:AEST
DTSTART:20250405T160000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1000
TZOFFSETTO:+1100
TZNAME:AEDT
DTSTART:20251004T160000
END:DAYLIGHT
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=Australia/Melbourne:20241002T173000
DTEND;TZID=Australia/Melbourne:20241002T190000
DTSTAMP:20240912T041735Z
CREATED:20240829T023634Z
LAST-MODIFIED:20240912T041735Z
UID:19549-1727890200-1727895600@australiantunnellingsociety.com.au
SUMMARY:Hobsons Bay main Yarra crossing duplication project
DESCRIPTION:The Hobsons Bay Main Sewer (HBMS)\, constructed in the 1960s\, transfers approximately 30 per cent of Melbourne’s wastewater to the Western Treatment Plan at Werribee. \nThe sewer alignment has a single sewer crossing under the Yarra River\, which has deteriorated to a point where it requires rehabilitation and/or replacement. The Hobson Bay main Yarra crossing duplications project is the construction of a new sewer alongside the current HBMS to ensure there are no disruptions to the critical sewer network and will allow for the future uninterrupted rehabilitation of the existing crossing. \nThis presentation covers the design and construction of the new sewer; tunnelling and excavating shafts in difficult ground conditions\, constructing shafts over the critical live sewers\, completing the live connections and bringing the new sewer successfully into service. \nATS Platinum Sponsor John Holland. \nProgram\nOnline: \n\n6.00 pm AEST: Presentation and Q&A\n\nIn-person: \n\n5.30 pm AEST: Guest arrival\, registration\, networking\n6.00 pm AEST: Presentation and Q&A\n7.00 pm: Event ends\n\nAbout the speaker\n\n\n\nNick Cox\nConstruction Manager\, John Holland\nBiography\nNick is a Construction Manager at John Holland. During his 16 years as a civil engineer with John Holland\, Nick has specialised in major road\, rail and water infrastructure tunnelling projects in Victoria\, NSW and Queensland. \nHis expertise includes TBMs\, pipejacking\, mined tunnelling\, ground treatment and shaft sinking in both hard and soft ground. Nick has been at the forefront of implementing key project innovations such as the use of glass-reinforced plastic linings and manholes and the development of mechanical flumes for live sewer diversion works.
URL:https://australiantunnellingsociety.com.au/ats-event/hobsons-bay-main-yarra-crossing-duplication-project/
LOCATION:Melbourne Engineers Australia office\, Level 6\, 181 William Street\, Melbourne\, VIC\, Australia
CATEGORIES:Online,Victoria
ATTACH;FMTTYPE=image/jpeg:https://australiantunnellingsociety.com.au/wp-content/uploads/2024/08/Hobsons.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20241003
DTEND;VALUE=DATE:20241005
DTSTAMP:20240913T030723Z
CREATED:20240419T020906Z
LAST-MODIFIED:20240913T030723Z
UID:19097-1727913600-1728086399@australiantunnellingsociety.com.au
SUMMARY:ATS-SOM Workshop
DESCRIPTION:Let’s focus on tunnel Systems! \nJoin suppliers and peers in a two-day event at the Victorian Tunnelling Centre (VTC) in Melbourne\, packed with visits\, presentations and hands on demonstrations of tunnel systems products. Express your interest in attending now. Free of charge to ATS members! \nAbout the workshop \nThe ATS-SOM Workshop\, held in collaboration with the Victorian Tunnelling Centre\, will focus specifically on tunnel systems. This engaging two-day event will feature presentations\, site visits\, and ample networking opportunities. \nKeynote presentations will be given by Ayman Eltouny and Surbhi Maheshwari from MTM\, discussing the MURL Fire Protection Upgrade Project; and Mr Michael Kost and Dr Yeasmin Khandakar from Transurban\, who will explore the use of Artificial Intelligence in managing operating road tunnel assets. \nWorkshop participants will gain exclusive behind-the-scenes access to prominent Victorian underground spaces\, including the West Gate Tunnel Project and Melbourne Central Station. \nParticipants will have the chance to engage with the latest innovations\, pose questions\, and gain hands-on experience with some of the featured products on display and explore the interactive VTC facilities. \nParticipation includes lunches and dinner on Thursday 3rd October. \nDate & time \n\nWorkshop: Thursday – Friday\, 3-4 October 2024 – 9:00am-4:30pm\nWest Gate Tunnel site visit: Monday 7 October – 9:00am-12:00am\nSocial and networking dinner: Thursday 3 Oct – 6:30pm-9:00pm\n\nCost \n\nFree to ATS Members (Join ATS here)\n\nExpress your interest in attending now! \nDue to the limited number of attendees allowed at the VTC and tunnel sites; the anticipated popularity of this event; and our desire to allocate places fairly among companies\, we are asking potential participants to register their expression of interest to attend the workshop. Submitting your interest does not guarantee a place at the workshop or the site visits. \nOnce you have registered\, you will receive a Microsoft Teams calendar invite. This invitation is provisional and should be considered pending until the registration process is complete. Successful applicants will receive a separate confirmation email after the review has taken place. \nNOTE: Expressions of interest close: Sunday\, 15 September 2024 – 6:00pm \nSponsors \nThis event would not be possible without the generous support of our sponsors below. There are a few sponsorship positions available\, so please check out our Sponsorship Prospectus to learn more and see how you can help. \n \nAbout ATS-SOM \nThe ATS Tunnel Systems\, Operation and Maintenance group (ATS- SOM) is a dedicated national subgroup of the ATS\, comprising representatives from various chapters who share an interest in tunnel systems\, as well as the operation and upkeep of tunnels. \nSince its inception in 2021\, ATS-SOM now boasts a diverse committee of consultants\, vendors\, and constructors from the infrastructure\, water\, and resources sectors. The group has successfully organised numerous events and technical sessions.
URL:https://australiantunnellingsociety.com.au/ats-event/ats-som-workshop/
LOCATION:Victorian Tunnelling Centre\, 41 Drummond St\, Chadstone\, Victoria\, 3148\, Australia
CATEGORIES:Victoria
ATTACH;FMTTYPE=image/png:https://australiantunnellingsociety.com.au/wp-content/uploads/2024/04/VTC-1.png
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Australia/Melbourne:20241022T173000
DTEND;TZID=Australia/Melbourne:20241022T190000
DTSTAMP:20240930T052641Z
CREATED:20240913T022033Z
LAST-MODIFIED:20240930T052641Z
UID:19645-1729618200-1729623600@australiantunnellingsociety.com.au
SUMMARY:North East Link SEM Ventilation Tunnel and Adit Construction
DESCRIPTION:Overview \nThe construction of the North East Link (NEL) tunnels is well underway! The largest transport infrastructure project in Victorian history consists of 6.5 km tunnels from Watsonia to Bulleen\, and it will complete Melbourne’s orbital freeway network. The presentation will provide an overview of the recently constructed ventilation tunnel and adits using Sequential Excavation Method (SEM). The key topics include primary support types and selection criteria\, construction sequence and methodology\, observational ground behaviour and support optimisation on site. This presentation offers an exclusive look into the mega project\, detailing the entire timeline from design to construction. It provides a unique opportunity to showcase the comparison between tunnel design considerations and field observations\, with the intention to bridge the gap between theory and practice. \nLearning outcomes \nThis presentation you will learn: \n• Regional geology and how the project classifies the rock mass for tunnel support selection. \n• The roles and responsibilities of the CPS team in the field and how they provide advice on “as required” support installation. \n• An overview of the detailed design process and how the North East Link team are bridging the gap between design and construction through design and constructability optimisations. \nTimings \nOnline: \n6:00pm AEDT: Presentation and Q&A \n7:00pm AEDT: Webinar ends \nIn-person: \n5:30pm AEDT: Guest arrival\, registration\, networking \n6:00pm AEDT: Presentation and Q&A \n7:00pm AEDT: Event ends \n  \nSpeakers \n \nBrooke Carnes \nSenior Project engineer\, DELVE Underground \nBrooke is a Senior Project engineer at Delve Underground with 10 years of experience in tunnelling on a wide range of transportation and water projects\, both in Australia and internationally. She has design experience in metro rail\, road tunnel and large-scale underground structures. Brooke was the SEM mainline tunnel Package Lead on the North East Link Program Detailed Design Phase and is now working as a Field Professional providing Construction Phase Services to SPARK for the construction of the SEM scope on this project. \n \nHeather Hughes-Adams \nProfessional geotechnical engineer\, DELVE Underground \nHeather Hughes-Adams is a professional geotechnical engineer with 6 years of experience in the industry. She joined Delve Underground in Vancouver in 2021\, where she has used her background in site investigation and trenchless construction engineering to support her work in trenchless technology\, including the design and construction of horizontal directional installations and pipe rammed crossings. Since joining the Melbourne office last year\, Heather has begun working on large scale transportation tunnels\, starting with the North-East Link project where she works full time on Construction Phase Services.
URL:https://australiantunnellingsociety.com.au/ats-event/north-east-link-sem-ventilation-tunnel-and-adit-construction/
LOCATION:Delve Underground\, Level 15 / 385 Bourke Street\, Melbourne\, Victoria\, 3000\, Australia
CATEGORIES:Online,Victoria
ATTACH;FMTTYPE=image/jpeg:https://australiantunnellingsociety.com.au/wp-content/uploads/2024/09/Vent-Tunnel-1-scaled.jpg
END:VEVENT
END:VCALENDAR