BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Australian Tunnelling Society - ECPv6.16.2//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-ORIGINAL-URL:https://australiantunnellingsociety.com.au
X-WR-CALDESC:Events for Australian Tunnelling Society
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:Australia/Melbourne
BEGIN:STANDARD
TZOFFSETFROM:+1100
TZOFFSETTO:+1000
TZNAME:AEST
DTSTART:20200404T160000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1000
TZOFFSETTO:+1100
TZNAME:AEDT
DTSTART:20201003T160000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1100
TZOFFSETTO:+1000
TZNAME:AEST
DTSTART:20210403T160000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1000
TZOFFSETTO:+1100
TZNAME:AEDT
DTSTART:20211002T160000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1100
TZOFFSETTO:+1000
TZNAME:AEST
DTSTART:20220402T160000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1000
TZOFFSETTO:+1100
TZNAME:AEDT
DTSTART:20221001T160000
END:DAYLIGHT
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=Australia/Melbourne:20210428T173000
DTEND;TZID=Australia/Melbourne:20210428T183000
DTSTAMP:20260521T153312
CREATED:20210407T054700Z
LAST-MODIFIED:20210414T105627Z
UID:15781-1619631000-1619634600@australiantunnellingsociety.com.au
SUMMARY:ATS WEBINAR - The Kitanomine Tunnel: A SEM Case Study
DESCRIPTION:Join the Australian Tunnelling Society Victoria Division for a presentation by Kensuke Date on the challenges faced in using the Water-tight Sequential Excavation Method (SEM) for Tunnel Construction with Difficult Ground Conditions in the construction of the Kitanomine Tunnel. \nThe Kitanomine Tunnel is a 2928 m long tunnel in Furano City\, as part of the Asahikawa-Tokachi Road running N-S in central Hokkaido\, Japan. The sequential excavation method (SEM) was used for the watertight tunnel construction.  However\, the geology of the Kitanomine Tunnel mainly comprised of mudstone\, welded tuff and alluvial fan deposits\, causing additional challenges for construction. The area was also rich in water resources and the alluvial fan deposits were found to be predominantly throughout the tunnel alignment with an identified active fault crossing the alignment. Effective grouting around the tunnel to mitigate the environmental impact was also a remarkable feature of the project. \nThe presentation by Kensuke will address the following: \n\nGeological challenges that were faced in implementing the tunnelling plan\nTunnel excavation and support strategies implemented\, including the use of tanked sections\nGrouting techniques which were developed for water tightness in rock\nImplementation of Field Testing to prove the effectiveness of the ground improvement\nGroundwater recovery after the tunnel excavation\n\nKeynote Speaker\nKensuke Date\nDeputy General Manager\,Kajima Technical Research \n \nKensuke Date has 25+ years of experience in Tunnelling and geotechnical engineering. He graduated from the University of Tokyo and then has worked for Kajima Corporation\, one of the largest construction companies in Japan. He has published a lot of peer-reviewed papers on tunnelling in journals and international conferences. He has served as a tunnelling specialist and design manager in challenging projects\, including the Kitanomine tunnel passing through an artesian aquifer with watertight tunnel support. \nKensuke is currently working at Kajima Technical Research Institute in Singapore as Deputy General Manager.
URL:https://australiantunnellingsociety.com.au/ats-event/ats-webinar-the-kitanomine-tunnel-a-sem-case-study/
CATEGORIES:Online,Victoria,Webinar
ATTACH;FMTTYPE=image/jpeg:https://australiantunnellingsociety.com.au/wp-content/uploads/2021/04/iStock-182060009.jpeg
END:VEVENT
END:VCALENDAR