BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Australian Tunnelling Society - ECPv6.16.2//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Australian Tunnelling Society
X-ORIGINAL-URL:https://australiantunnellingsociety.com.au
X-WR-CALDESC:Events for Australian Tunnelling Society
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:Australia/Sydney
BEGIN:STANDARD
TZOFFSETFROM:+1100
TZOFFSETTO:+1000
TZNAME:AEST
DTSTART:20180331T160000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1000
TZOFFSETTO:+1100
TZNAME:AEDT
DTSTART:20181006T160000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1100
TZOFFSETTO:+1000
TZNAME:AEST
DTSTART:20190406T160000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1000
TZOFFSETTO:+1100
TZNAME:AEDT
DTSTART:20191005T160000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1100
TZOFFSETTO:+1000
TZNAME:AEST
DTSTART:20200404T160000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1000
TZOFFSETTO:+1100
TZNAME:AEDT
DTSTART:20201003T160000
END:DAYLIGHT
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=Australia/Sydney:20190828T173000
DTEND;TZID=Australia/Sydney:20190828T193000
DTSTAMP:20260522T033252
CREATED:20190214T050157Z
LAST-MODIFIED:20190714T083440Z
UID:14062-1567013400-1567020600@australiantunnellingsociety.com.au
SUMMARY:ATS VIC - Water Ingress in Long TBM Tunnels: Its Mitigation and Control
DESCRIPTION:Overview\nThe 15km headrace tunnel for the Uma Oya Multipurpose Development project in Sri Lanka was excavated by double shield TBM and intersected large quantities of water. The study of this project with regards to better understanding the effects of the tunnel on the hydro-geology of the area\, identifying relevant in-tunnel investigation techniques\, and developing better pre-excavation and post excavation grouting systems is relevant to other long hard rock TBM projects. \nThe presentation will address why we need to limit the water ingress into tunnels under construction with regards to the potential effect on the environment with dewatering of surface and near surface aquifers\, the effect on the construction and its schedule\, and the methods available for prediction and control of ground water during tunnel excavation. The paper will also present examples from other projects around the world\, including past completed projects\, projects under construction and future planned projects\, detailing how such hazards have been or will be treated. \nSpeaker\nDavid Lees \nDavid Lees has over 35 years’ experience in the design and construction of underground works\, both in mining and civil tunnelling\, with particular expertise in grouting and ground treatment. He has worked in over 14 countries around the world as both consultant and contractor. From August 2015 to August 2018 David was Chief Site Supervisor on a 15km TBM tunnel in Sri Lanka. The project had enormous problems with water ingress – up to 1000l/s from the face – causing heavy delays to the project and widespread social and environmental problems. David joined the project halfway through and took the opportunity whilst on the project to prepare a thesis for a PhD through the local university of Peradeniya. The presentation is based on his PhD thesis. \nNOTE: This event starts with networking at 5:30PM followed by the presentation at 6:00PM-7:30PM.
URL:https://australiantunnellingsociety.com.au/ats-event/https-www-engineersaustralia-org-au-event-2019-06-water-ingress-long-tbm-tunnels-its-mitigation-and-control/
LOCATION:Engineers Australia\, Vic Division\, Lvl 31\, 600 Bourke Street\, Melbourne\, Victoria\, 3000\, Australia
CATEGORIES:Victoria
ATTACH;FMTTYPE=image/jpeg:https://australiantunnellingsociety.com.au/wp-content/uploads/2019/07/water-ingress.jpg
END:VEVENT
END:VCALENDAR