BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Australian Tunnelling Society - ECPv6.15.20//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Australian Tunnelling Society
X-ORIGINAL-URL:https://australiantunnellingsociety.com.au
X-WR-CALDESC:Events for Australian Tunnelling Society
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:Australia/Brisbane
BEGIN:STANDARD
TZOFFSETFROM:+1000
TZOFFSETTO:+1000
TZNAME:AEST
DTSTART:20210101T000000
END:STANDARD
END:VTIMEZONE
BEGIN:VTIMEZONE
TZID:Australia/Sydney
BEGIN:STANDARD
TZOFFSETFROM:+1100
TZOFFSETTO:+1000
TZNAME:AEST
DTSTART:20210403T160000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1000
TZOFFSETTO:+1100
TZNAME:AEDT
DTSTART:20211002T160000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1100
TZOFFSETTO:+1000
TZNAME:AEST
DTSTART:20220402T160000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1000
TZOFFSETTO:+1100
TZNAME:AEDT
DTSTART:20221001T160000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1100
TZOFFSETTO:+1000
TZNAME:AEST
DTSTART:20230401T160000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1000
TZOFFSETTO:+1100
TZNAME:AEDT
DTSTART:20230930T160000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1100
TZOFFSETTO:+1000
TZNAME:AEST
DTSTART:20240406T160000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1000
TZOFFSETTO:+1100
TZNAME:AEDT
DTSTART:20241005T160000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1100
TZOFFSETTO:+1000
TZNAME:AEST
DTSTART:20250405T160000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1000
TZOFFSETTO:+1100
TZNAME:AEDT
DTSTART:20251004T160000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1100
TZOFFSETTO:+1000
TZNAME:AEST
DTSTART:20260404T160000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1000
TZOFFSETTO:+1100
TZNAME:AEDT
DTSTART:20261003T160000
END:DAYLIGHT
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=Australia/Brisbane:20260319T173000
DTEND;TZID=Australia/Brisbane:20260319T190000
DTSTAMP:20260430T021038
CREATED:20260209T041003Z
LAST-MODIFIED:20260219T023028Z
UID:238696-1773941400-1773946800@australiantunnellingsociety.com.au
SUMMARY:Umbrella canopy tubes in tunnel construction
DESCRIPTION:Overview\nThis event explores umbrella canopy tubes as a pre-support solution for tunnelling in unfavourable ground conditions. Fundamental understanding of the structural mechanics of canopy supports will be developed through the investigation of overburden loading on tunnel boundaries\, failure mechanisms of umbrella canopy tubes and ground material\, and monitoring systems for tunnels.   This theory will be applied to determine analytical solutions for simply loaded umbrella canopy tubes. From these findings\, the performance of umbrella canopy tubes on a Project will be investigated to validate the analytical solutions and provide context to theory.  Who should attend? This event is ideal for civil and geotechnical engineers\, tunnelling specialists\, and professionals involved in underground construction and infrastructure projects. It will also benefit those working in design\, analysis\, and monitoring of tunnel support systems\, as well as anyone seeking to deepen their understanding of ground behaviour and structural mechanics in challenging conditions. \nProgram timeline\n5.30 PM AEST – Registration and catering \n6.00 PM AEST – Event begins \n7.00 PM AEST – Event concludes \nLearning outcomes\nIn this presentation you will learn: \n\nUnderstand load distribution from overburden ground pressures onto umbrella canopy tubes.\nIdentify failure mechanisms and determining success of umbrella canopy tubes.\nDetermine effective application of monitoring systems in tunnels.\n\nAbout the speaker\n\n\n\nKate Burger\nGraduate Geotechnical Engineer\, AECOM\nKate attended the University of Queensland and works at AECOM as a Graduate Geotechnical Engineer. Kate is the winner of the ATS Tunnelling Student Award 2025.\n\n\n\n\n\n\n\n\n\nArun Sarathchandran\nPrincipal Geotechnical Engineer\, AECOM\nArun attended Delft University of Technology and works at AECOM as a Principal Geotechnical Engineer.
URL:https://australiantunnellingsociety.com.au/ats-event/umbrella-canopy-tubes-in-tunnel-construction/
LOCATION:Engineers Australia QLD\, Level 9\, 340 Adelaide St\, Brisbane\, QLD\, 4000\, Australia
CATEGORIES:Queensland
ATTACH;FMTTYPE=image/jpeg:https://australiantunnellingsociety.com.au/wp-content/uploads/2026/02/Screenshot-2026-02-09-150701.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Australia/Brisbane:20260205T170000
DTEND;TZID=Australia/Brisbane:20260205T200000
DTSTAMP:20260430T021038
CREATED:20260113T024046Z
LAST-MODIFIED:20260204T235045Z
UID:226187-1770310800-1770321600@australiantunnellingsociety.com.au
SUMMARY:Kidston Hydro Tailrace breakthrough: inside-out method
DESCRIPTION:Overview\nNote\, this event is both online and in person.  \nThe in person registration link is: Kidston Hydro Tailrace breakthrough: inside-out method | Engineers Australia \nClick this link at 5.30 AEST to join online: ATS Technical Presentation: Kidston Hydro Tailrace breakthrough: inside-out method | Meeting-Join | Microsoft Teams \nJoin us for an insightful technical presentation showcasing a compelling case study on the excavation of Tailrace 1 at the Kidston Pumped Storage Hydro project. This innovative approach involved excavating from the inside out\, without prior access to the external portal face. The presentation will detail the unique methodologies employed\, including the implementation of ground support systems and specialized techniques for achieving a bespoke breakthrough. Gain valuable insights into how the final breakthrough blast was carefully executed and supported to ensure structural stability upon completion. \nProgram timeline\n5.00 pm AEST – Registration and catering opens \n5.30 pm AEST – Presentation commences \n7.30 pm AEST – Presentation concludes \n8.00 pm AEST – Event concludes \nLearning outcomes\n\nInnovative excavation approach: methodology of excavating from the inside out without prior access to the external portal face\nGround support design and implementation: design principles and techniques to ensure stability during breakthrough works\nSpecialized techniques for bespoke breakthrough: unique strategies for controlled and safe breakthrough in challenging conditions\nFinal breakthrough blast execution: planning and execution to maintain structural integrity\nRisk management and safety considerations: measures to mitigate risks and ensure safety during excavation and blasting operations\nLessons learned from the Kidston Pumped Storage Hydro Project: key takeaways for similar tunnelling and underground engineering projects\n\nAbout the speakers\n\n\n\nAmit Narsey\nTunnelling Engineer\, GHD\n\n\nAmit is a tunnelling engineer with over 14 years’ experience in the design and delivery of underground and geotechnical infrastructure in the hydropower\, water and transport sectors. His key areas of technical competency are in the structural and geotechnical design of ground support for tunnels\, caverns\, shafts and retaining structures. Amit undertakes and leads teams to deliver engineering services\, and as a chartered professional is passionate about providing practical solutions to clients across various project stages including design\, construction\, operation\, and maintenance.\n\n\n\n\n\n\nKaylah Macintosh\nTunnel Manager\, JHG\n\nKaylah is a Tunnel Manager with over 10 years experience in Tunnelling. Kaylah has extensive experience in Drill & Blast\, Drill and Blast Engineering and Vibration modelling. Kaylah is a Mechanical engineer with a Master of Geophysics and is currently completing her second Master of Space Engineering at ADFA UNSW.
URL:https://australiantunnellingsociety.com.au/ats-event/kidston-hydro-tailrace-breakthrough-inside-out-method/
LOCATION:GHD Brisbane Office\, Level 9/145 Ann St\, Brisbane City\, Queensland\, 4000\, Australia
CATEGORIES:Hybrid,Online,Queensland
ATTACH;FMTTYPE=image/png:https://australiantunnellingsociety.com.au/wp-content/uploads/2026/01/Kidston-event-scaled-e1770166961617.png
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Australia/Brisbane:20251106T173000
DTEND;TZID=Australia/Brisbane:20251106T200000
DTSTAMP:20260430T021038
CREATED:20251015T012149Z
LAST-MODIFIED:20251015T012149Z
UID:157697-1762450200-1762459200@australiantunnellingsociety.com.au
SUMMARY:New Diaphragm Wall Construction Method for Micro Sites and Underground Applications
DESCRIPTION:Overview\nThis presentation focuses on the development of Diaphragm Wall (D-walls) construction methods used in ground engineering applications\, either from the surface or out of tunnels. \nIt focuses on the latest D-wall developments allowing for miniaturizes equipment\, the size of a shipping container\, to construct D-walls underground out of 4m diameter tunnel. This State-of-the-Art method demonstrates the potential to get huge space below existing infrastructure or buildings\, without demolition and rebuilding\, for applications like mass battery banks\, Hydrogen storage\, transport infrastructure\, roads\, ultra safe nuclear power plants or underground water reservoirs etc. Or on the surface for minimally invasive micro construction sites. \nAlso focusing on a case study of a surface excavation with D-walls to 37 m deep in San Paulo\, Brazil without the use of ground anchors or bracing. \nDiaphragm walls have become a standard specialist foundation engineering technique. A series of individual rectangular panels produce a continuous wall. During the excavation\, the open trench is stabilized and supported by a thixotropic slurry. \nDiaphragm walls can provide cost – effective solutions for diverse construction projects\, e.g. in restricted site conditions\, projects with great depth or in challenging soil conditions. \nAbout the speakers\n\n \n\nManfred Stiglmayr \nBusiness Development\, BAUER Maschinen\, Germany \n\n\n\nManfred is a Mechanical engineer and have diverse work experience having worked with a Jaguar/FORD dealer group as GM\, MD of CLAAS (agricultural machines)\, as MD of Komatsu construction machines in Austria\, for 10 years with CATERPILLAR Global Mining as Director in Europe/ Asia\, as CEO of Bobcat construction machines in central Europe\, for over 6 years with BAUER Maschinen. \nHe served as Global active as sales director for Water\, Energy & Mining until 2024 and now serving as global Business development for BAUER Maschinen to introduce BAUER more comprehensively into the foundation world. \n\n\n\n \n\nJames Morris \nGeneral Manager BAUER Equipment\, Australia \n\n\n\nHaving a diverse industry background with over 25 Years in national management roles at Volvo\, Hino (Toyota’s truck brand)\, Linde forklifts\, Snap-on Tools\, and now Bauer Equipment\, James helps foundation engineering companies in construction\, mining and civil engineering deliver technologically advanced foundations\, subsurface walls\, and access to high value ore bodies. \nBefore these management roles\, James’s career started in aviation with the RAAF\, becoming a Licensed Maintenance Engineer\, where he developed extensive hands-on understanding of mechanical\, pneumatic\, hydraulic\, and electrical systems and their application across diverse equipment. His role is now in delivering new and innovative foundation engineering equipment\, for pile drilling\, driving and excavation work\, diaphragm cut-off walls and ground improvements\, also for the exploration\, mining\, and extraction of natural resources. \n\n\n\nThis event is co-hosted with the Australian Geomechanics Society
URL:https://australiantunnellingsociety.com.au/ats-event/new-diaphragm-wall-construction-method-for-micro-sites-and-underground-applications/
LOCATION:WSP Australia\, Level 13/900 Ann Street\, Fortitude Valley\, QLD\, 4006
CATEGORIES:Queensland
ATTACH;FMTTYPE=image/jpeg:https://australiantunnellingsociety.com.au/wp-content/uploads/2025/07/31-July-scaled.jpeg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Australia/Sydney:20251016T180000
DTEND;TZID=Australia/Sydney:20251016T190000
DTSTAMP:20260430T021038
CREATED:20250813T050133Z
LAST-MODIFIED:20251008T014539Z
UID:127616-1760637600-1760641200@australiantunnellingsociety.com.au
SUMMARY:TBM excavation through a bench at Albert St\, Cross River Rail
DESCRIPTION:REGISTRATION OPEN NOW!\nNote: this is a hybrid event available online and in person in Brisbane \nEvent overview & who should attend\nExcavating directly above operating TBM is one of the most complex challenges in tunnelling\, demanding precision\, coordination\, and innovative thinking. At Albert Street on Cross River Rail\, this meant adapting excavation methods\, rethinking ground support\, and carefully controlling bench blasting to protect the TBM below. \nIn this presentation\, Robert Elliot\, Ben Swinn\, and Dan Keating will walk through the real-world process of safely benching over opertaing TBM\, from revising support systems to designing blasts. You’ll see how engineering decisions were made under tight constraints\, supported by monitoring and risk management. \nWhether you work in tunnelling\, geotechnical design\, or construction management\, this session offers a behind-the-scenes look at a high-stakes excavation\, lessons learned\, and strategies you can apply to similar complex interfaces in your own projects. \nLearning outcome\nBy the end of this session\, attendees will: \n\nUnderstand the rationale and risks associated with excavating directly above operating TBM\, and how the methodology was adapted to address them.\nLearn how ground support requirements evolved due to the change in excavation strategy\, including practical implications for structural stability and safety.\nGain insights into the design and execution of controlled bench blasting near active tunnelling operations.\nBe able to apply lessons learned from the Albert Street case to future tunnelling interfaces\, especially in constrained urban environments with complex construction sequencing.\n\nSpeakers\n \nRob Elliott is a Senior Consultant from Systra\, currently working client side on the Northern Water Desalination Project in South Australia as a Constructability Advisor and has over 10 years of post-graduate experience in major infrastructure projects\, both in Australia and internationally. A key highlight of his career is his 5-year tenure on Brisbane’s Cross River Rail project\, where he served as a Project Engineer. His experience also includes time on a major road tunnel project beneath the Suez Canal in Egypt. \n \nBen Swinn is a Senior Consultant from Systra currently seconded onto the Cross River Rail project as a Senior Project Engineer. Ben’s engineering background consists of tunnelling\, trenchless and civil aspects including delivering recent major rail projects such as Carmichael Rail Network\, Sydney Metro\, Sydney Light Rail and Cross River Rail. \n \nDan Keating is a Senior Consultant from Systra\, currently seconded onto Gold Coast Light Rail Stage 3 and has over 15 years of experience. Dan’s experience consists of tunnelling and heavy infrastructure works. His career has taken him overseas with exposure to projects such as Heathrow expansion upgrade\, Thames Tideway Tunnel\, underground coal and hardrock mining operations\, Cross River Rail\, Northconnex and most recently Gold Coast Light Rail Stage 3.
URL:https://australiantunnellingsociety.com.au/ats-event/tbm-excavation-through-a-bench-at-albert-st-cross-river-rail/
LOCATION:EA Brisbane Office\, Level 9\, 340 Adelaide St (EA Office)\, Brisbane\, Queensland\, 4000\, Australia
CATEGORIES:Hybrid,Online,Queensland
ATTACH;FMTTYPE=image/jpeg:https://australiantunnellingsociety.com.au/wp-content/uploads/2025/08/Iconic-Photo-1.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Australia/Brisbane:20250915T060000
DTEND;TZID=Australia/Brisbane:20250915T190000
DTSTAMP:20260430T021038
CREATED:20250903T010819Z
LAST-MODIFIED:20250903T011038Z
UID:137732-1757916000-1757962800@australiantunnellingsociety.com.au
SUMMARY:Tunnel settlement and subsidence monitoring
DESCRIPTION:Overview:\nThis presentation will give a greater insight into the world leading GNSS innovative solution from Worldsensing\, which have already been deployed in many mine and infrastructure applications including in Australia and globally. Examples will be provided for settlement monitoring during and after tunnel construction and the instrumentation. Worldsensing are innovators and technology leaders in various aspects of monitoring and more recently launched the world’s first robust\, cost efficient wireless Autonomous GNSS solution as part of our G7 family of Loadsening devices\, which are expanding the capabilities of autonomous remote monitoring particularly in harsh environments globally. \nLearning outcomes:\nIn this presentation you will learn: \n\nInsight into GNSS innovative solution\nSettlement monitoring applications\nInstrumentation for settlement monitoring\n\nProgram timeline:\nIn-Person:\n5:30pm: Registrations open\n6:00pm: Presentation commences\n7:00pm: Presentation concludes\, networking continues\n7:30pm: Event concludes \nOnline:\n6:00pm: Presentation commences\n7:00pm: Presentation concludes \nSpeakers:\n \nMichal Dabrowski\nGlobal Head of GNSS and Geospatial\, Worldsensing\n\nMichal Australian-trained and experienced spatial and monitoring specialist\, having worked as an Surveying and civil engineer focus. With over 11 years\, Having worked extensively across remote parts of Australia on major projects\, including the Dampier to Bunbury Natural Gas Pipeline (DBNGP)\, as well as large-scale mining and infrastructure operations such as the Perth Airport expansion\, the Melbourne Oil and Gas Refinery in Corio\, and the Sky Rail project. Michal is currently supporting the introduction of our newest innovation – the Worldsensing GNSS Meter .This technology offers precise\, automated displacement monitoring that can seamlessly complement other instrumentation\, enhancing both the efficiency and scope of monitoring programs.\n\n\n\n\nNeil Cunnington\nChannel Account Manager – Australasia\, Worldsensing\n\n\nNeil originally worked as an Aircraft Engineer after moving from Europe to Australia 14 years ago – Specialising on Aircraft flight training Simulators incorporating a range of Engineering applications such as Electrical / mechanical / monitoring / Avionic and Aircraft systems and subsequently 9 + years ago transitioned into Monitoring Sector working as Application engineer for environmental & instrumentation Monitoring for Campbell Scientific Australia. In more recent years working across predominantly Queensland and nationally role in the civil /Mining sector with geotechnical / Tailings applications using Geosynthetics\, and structural integrity applications\, for both General Civil and mining engineering projects. Neil now heads the Oceania Region over the last 2 years Worldsensing\, back to his roots in the Monitoring Sector using proven leading technology.
URL:https://australiantunnellingsociety.com.au/ats-event/tunnel-settlement-and-subsidence-monitoring/
LOCATION:Online and in person at: Level 9\, 340 Adelaide Street\, Brisbane
CATEGORIES:Hybrid,Online,Queensland
ATTACH;FMTTYPE=image/jpeg:https://australiantunnellingsociety.com.au/wp-content/uploads/2025/09/Screenshot-2025-09-03-110223.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Australia/Brisbane:20250911T153000
DTEND;TZID=Australia/Brisbane:20250911T200000
DTSTAMP:20260430T021038
CREATED:20250702T045331Z
LAST-MODIFIED:20250702T045354Z
UID:105075-1757604600-1757620800@australiantunnellingsociety.com.au
SUMMARY:2025 ATS QLD Indoor Charity Golf Day
DESCRIPTION:Event description\n\nCome along and swing for a great cause! 🏌️‍♂️ \nThis new format event combines the excitement of modern golf simulation with the satisfaction of supporting vital medical research. Whether you’re a golf enthusiast or complete beginner\, join us for an afternoon of fun\, networking\, and giving back to the community. \nNOTE THIS IS A GOLFING SIMULATION EVENT \nEVENT DETAILS \n📅 Date: Thursday 11th September 2025 \n⏰ Time: 3:30pm arrival for 4:00pm shotgun start \n📍 Venue: XGolf Southbank – 275 Grey St\, South Brisbane QLD 4101 \n🏌️ Format: 3 Ball Ambrose – 9 Holes (all done in maximum 4 hours) \n\n✨ ABSOLUTELY NO GOLFING ABILITY REQUIRED! \n🤝 A relaxed\, fun afternoon of networking \n💡 Raising much needed funds to support life-saving medical research \n🎮 Experience cutting-edge indoor golf simulation technology \n\n💳 REGISTRATION & PRICING \n\n\n\n\nIndividual Player\n$90\n\n\nTeam of 3\n$250\n\n\nSpectator only\n$50\n\n\n\n\nBooking fees apply. \n🎯 All funds raised will be donated to the RBWH Foundation for medical research \n\n🤝 SPONSORSHIP OPPORTUNITIES AVAILABLE! \nContact us to learn about our sponsorship packages and help make this event even more impactful! tbrown1@systra.com or frank.cerone@masterbuilders.com \n19Th Hole Sponsorship – $2\,000 – Major Sponsor – a bar package to assist with subsidising drink costs on the afternoon.  Includes golf registration for team of 3. Sure to be highly sought after. \nSimulator Bay Sponsor (like a hole sponsor) – $1\,000 – brand the simulator booth for the event. Includes golf registration for team of 3. \nPrize Hole Sponsorships – $500 \n–          Nearest the pin (x 2) \n–          Longest Drive
URL:https://australiantunnellingsociety.com.au/ats-event/2025-ats-qld-indoor-charity-golf-day/
LOCATION:XGolf Southbank\, 275 Grey St\, South Brisbane\, Queensland\, 4101
CATEGORIES:Queensland
ATTACH;FMTTYPE=image/jpeg:https://australiantunnellingsociety.com.au/wp-content/uploads/2025/07/QLD-golf-day.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Australia/Brisbane:20250821T170000
DTEND;TZID=Australia/Brisbane:20250821T190000
DTSTAMP:20260430T021038
CREATED:20250807T024535Z
LAST-MODIFIED:20250808T060628Z
UID:125068-1755795600-1755802800@australiantunnellingsociety.com.au
SUMMARY:Incident sensing and fire safety in Heysen Tunnels
DESCRIPTION:Join Matt and Conrad as they address questions from the ATS Systems\, Operations\, and Maintenance Group\, focusing on the surety of Fixed Fire-Fighting System (FFFS) activation in the Heysen Tunnels.\nGiven that the Heysen Tunnels Safety Upgrade and Refurbishment Project was brownfield exercise with unique challenges\, South Australia’s DIT recognised that a bespoke engineering approach was required rather than recycling a prior tunnel design. \nThis presentation will offer insights into their philosophical approach for brownfield tunnel refurbishment\, specifically detailing the innovative design of the flame-sensing camera supervision and explaining the absence of (traditional) linear heat detectors in the Heysen Tunnels. \nWhile the misting system installation was a significant undertaking in the Heysen Tunnels\, that topic was comprehensively covered in the previous ATS seminar in Adelaide back in February 2025 and will not be treated in detail here.  This presentation focuses on topics distinct from the paper planned for the Australasian Tunnelling Conference 2025 (ATC2025) in Perth this November. \nThe Presenters\nMatthew Taylor \n \nAs a Chartered Electrical Engineer\, Matthew has over 35 years of experience within the electrical\, mechanical\, control and communications systems engineering fields within underground transport infrastructure project delivery environment within the UK\, Australia and New Zealand. \nA recognised innovator in the design\, installation\, testing\, commissioning and the ongoing operation and maintenance of the technology that drives modern transportation systems\, Matthew has played pivotal roles in the delivery of several of Australia’s largest projects since his migration from the UK in July 1997. \nConrad Stacey \n \nDr Conrad Stacey is a Director of leading underground ventilation and fire safety consultants Stacey Agnew.  Conrad’s credits include seminal reports on livestock shipping heat stress risk\, and co-authorship of a paper on the gravitational energy drivers for the geodynamo.  He has worked on hypersonic upper atmospheric flight and river and flood plain hydraulics.  A common thread through Conrad’s work in varied areas is a core focus on the fundamental physics and the engineering thought involved\, all within the big picture of the community interest.  He will talk about the fire engineering basis for decisions during tunnel refurbishments. \nChair Diane Mather \nDiane Mather is Senior Design Manager at Queensland Hydro\, with over 25 years of experience on major projects\, including Clem7 (NSBT)\, Airport Link\, City Rail Link\, WestConnex M5 East\, West Gate\, Sydney Metro\, Melbourne Metro\, Brisbane Cross River Rail\, Inland Rail\, and now Borumba Pumped Hydro. \nIn 2021\, Diane was honoured as the inaugural winner of the Women in Tunnelling Outstanding Achievement Award by the Australian Tunnelling Society.  Diane is a dedicated role model\, mentor\, and advocate for attracting and retaining women in engineering. \nThe eVENT Space\nThe seminar will be onsite at the eVENT Space in Stacey Agnew’s offices\, and online.  Catering for those networking onsite after the eVENT will be by Yim Thai restaurant Middle Park\, which is why registration includes dietary requirements.
URL:https://australiantunnellingsociety.com.au/ats-event/incident-sensing-and-fire-safety-in-heysen-tunnels/
LOCATION:eVENT Space\, 4/35 Limestone St\, Darra\, Queensland\, 4076\, Australia
CATEGORIES:Hybrid,Online,Queensland
ATTACH;FMTTYPE=image/jpeg:https://australiantunnellingsociety.com.au/wp-content/uploads/2025/08/Heysen-tunnel-scaled.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Australia/Brisbane:20250605T163000
DTEND;TZID=Australia/Brisbane:20250605T193000
DTSTAMP:20260430T021038
CREATED:20250526T040317Z
LAST-MODIFIED:20250526T040602Z
UID:77123-1749141000-1749151800@australiantunnellingsociety.com.au
SUMMARY:Join us in Brisbane to celebrate the Sydney Harbour Tunnel ITA Iconic Project Award
DESCRIPTION:Join the ATS in Brisbane to celebrate the occasion of the Sydney Harbour Tunnel project being awarded the International Tunnelling Association’s (ITA) Top 50 iconic tunnel projects of the last 50 years. \nMembers will be able to watch the presentations live from Sydney. \nThis special event will entail presentations\, memories and panel discussions from the people who brought this iconic project to life. Stories will be shared about the bold planning\, the complex design challenges overcome\, photographic memories\, and the advanced construction methods used to deliver this landmark project. Attendees will discover the operational and maintenance challenges encountered so far\, and gain insights into the custodianship that lies ahead over the next 30 years. Finally\, the ITA President Arnold Dix will offer closing remarks and present the award. \nTimings \n4.30 pm to 7.30 pm \nProgram \n\n4.30 pm AEST: Registrations\, welcome and housekeeping\n4.45 pm AEST Welcome by Arcadis\n5.00 pm AEST: Login into Sydney presentations\n7.15 pm AEST: Presentation ends\, followed by networking\n8.00 pm AEST: Event ends\n\nThis event will likely include: \n\nWelcome from ATS NSW Chair Phil Clark\nProject introduction- Dara McDonnell – Arup\, representing the next wave of engineers who understand the project\nPlanning panel – A discussion on the initial planning of the project by Bruce Judd\, Rob Parks and Ted Nye\nMeet the designers panel – with speakers including Ted Nye\, Patrick Wong\, Lewis Gomes\, Doug Tomic\, Peter Wheen.\nMeet the photographer – Margaret Rush (project photographer) will share some memories\nDelivery Panel – with speakers including Andrew Marsonet\, Bruce Judd\, Bob Nowotny and Tony Shepherd\nOperation presentation from Bob Allen\nSHT resilience with Arnold Dix\nAward presentation to Camilla Drover\n\nTo register please email andrew.atsqld@gmail.com  \nPlease note that places are strictly limited at 40 \nIf you’re unable to attend in person and would like to view the live stream online at a place of your convenience\, please register here: Celebrating the iconic Sydney Harbour Tunnel | Engineers Australia \n 
URL:https://australiantunnellingsociety.com.au/ats-event/77123/
LOCATION:Arcadis Australia Pacific\, Level 35\, 111 Eagle Street\, Brisbane\, QLD\, 4000
CATEGORIES:Queensland
ATTACH;FMTTYPE=image/jpeg:https://australiantunnellingsociety.com.au/wp-content/uploads/2025/05/Screenshot-2025-05-26-140124.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Australia/Brisbane:20250313T173000
DTEND;TZID=Australia/Brisbane:20250313T193000
DTSTAMP:20260430T021038
CREATED:20250210T005507Z
LAST-MODIFIED:20250303T012818Z
UID:20294-1741887000-1741894200@australiantunnellingsociety.com.au
SUMMARY:Accelerating action: advancing diversity and women in tunnelling
DESCRIPTION:Overview\nWe invite you to join us for an engaging event dedicated to celebrating and recognizing the significant contributions of women in tunnelling. This session will provide an opportunity to explore strategies for fostering gender equality and promoting diversity and inclusivity across the industry. The event will commence with a trivia challenge\, designed to highlight the achievements of pioneering women engineers while encouraging collaboration and thought-provoking discussions among participants. Following the trivia\, attendees will have the opportunity to network over refreshments and participate in a podcast recording session. This session will serve as a platform for sharing perspectives\, experiences\, and actionable ideas to drive progress toward a more inclusive and equitable industry. This event is open to professionals\, students\, and advocates for diversity who are committed to accelerating meaningful change. We look forward to your participation as we celebrate progress and work together toward a more inclusive future. \nLearning outcomes\n\nDevelop\, explore\, and implement strategies to accelerate progress toward gender equality and inclusivity in the engineering industry.\nHow to build a meaningful connections network with like-minded individuals\, fostering collaboration and mutual support within the industry.\nUnderstand how collaboration and inclusivity are essential to solving the puzzle of progress and creating a unified\, impactful community.\n\nProgram\n5.30pm AEST: Guest arrival \n6.00pm AEST: Introductions and trivia \n6.45pm AEST: Networking and podcast interviews \n7.30pm AEST: Event concludes \nAbout the hosts\nLaura Miranda and Sohan Roopra co-founded “You Don’t Look Like an Engineer\,” a podcast aimed at challenging the stereotypes about what an engineer looks like\, the show sparks meaningful conversations about inclusion\, finding your passion in your career\, leadership\, and self-improvement. \nWith a mission to drive change through storytelling\, their podcast reshapes perspectives and opens doors for a more inclusive future in engineering and beyond. \nYou don’t look like an Engineer | LinkedIn \n\n\n\nLaura Sofia Miranda Pantoja\nCo-Founder\, You Don’t Look Like an Engineer\n\n\nLaura Miranda is a marketing assistant with more than seven years of experience in the engineering industry. Laura co-founded You Don’t Look Like an Engineer\, a podcast dedicated to amplifying diverse voices and promoting equity. Beyond the podcast\, Laura volunteers as the marketing manager for the Australian Latin American Young Professionals\, blending creativity with community impact. \nKnown for building authentic connections\, Laura thrives on creating welcoming\, inclusive workplaces filled with inspiration. \n\n\n\n\n\n\n\nSohan Roopra\nCo-Founder\, You Don’t Look Like an Engineer\n\n\nSohan Roopra is a water resources engineer with six years of experience. Sohan is passionate about breaking barriers and making STEM more inclusive. As co-founder of You Don’t Look Like an Engineer\, Sohan shares raw and inspiring stories that challenge stereotypes and highlight the brilliance of underrepresented voices. \nWhen not podcasting or tackling engineering challenges\, Sohan enjoys exploring self-improvement\, soaking up nature\, and spending quality time with loved ones. \nEvent sponsors\n          
URL:https://australiantunnellingsociety.com.au/ats-event/accelerating-action-advancing-diversity-and-women-in-tunnelling/
LOCATION:Engineers Australia QLD\, Level 9\, 340 Adelaide St\, Brisbane\, QLD\, 4000\, Australia
CATEGORIES:Queensland
ATTACH;FMTTYPE=image/jpeg:https://australiantunnellingsociety.com.au/wp-content/uploads/2025/02/54182252514_176f366bcc_c.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Australia/Brisbane:20241129T080000
DTEND;TZID=Australia/Brisbane:20241129T133000
DTSTAMP:20260430T021038
CREATED:20240802T014933Z
LAST-MODIFIED:20241118T033940Z
UID:19461-1732867200-1732887000@australiantunnellingsociety.com.au
SUMMARY:Mount Coot-tha Quarry site visit and workshop
DESCRIPTION:Join us for the ATS’s annual Mount Coot-tha Quarry Day\, one of the most anticipated events on our calendar. Learn about new technologies\, make connections with exhibitors and participants and see cutting edge demonstrations at this fantastic and inspiring event. Quarry Day will feature: \nQuarry demonstrations:  \nExhibitor Displays: Active displays will be carried out by the exhibitors and guides will be provided with logistic support provided by the BCC quarry operators. \nThe demonstrations will include:      \n\nShotcrete demonstration (The Rix Group)\nDrilling and grouting (The Rix Group)\nFire Systems (Stacey Agnew)\nDrone work in construction (UPG / UQ)\nGrout injection equipment (Desoi)\n\nTicket Inclusions:       \n\nCoffee\nLight Lunch\n\nEvent Program: \n\n8.30AM AEST: Event commences – Induction Demonstrations at Quarry\n1:30PM AEST: Lunch at Botanic Gardens Cafe\n\nPPE Required: \nHard Hat\, Steel Cap Boots\, Long trousers and shirt\, Glasses \n\n\n\n\n\n\n\n\n\n\n\n\n\n\nPricing: \n\nGeneral Admission $50\n2024 ATS Short Course Attendees $40 (Please use the exclusive discount code from your registration email)\n\n\n\n\n\n\n\n\n\n\n\n\n\nOptional extras \n2024 ATS Short Course (27th – 29th November ) – REGISTRATIONS OPEN NOW \nSt Barbara’s Day dinner (28th November) – REGISTRATIONS OPEN NOW
URL:https://australiantunnellingsociety.com.au/ats-event/mount-coot-tha-quarry-site-visit-and-workshop/
LOCATION:QLD
CATEGORIES:Queensland
ATTACH;FMTTYPE=image/jpeg:https://australiantunnellingsociety.com.au/wp-content/uploads/2024/08/26820220329_8b728a254d_c.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Australia/Brisbane:20241128T180000
DTEND;TZID=Australia/Brisbane:20241128T220000
DTSTAMP:20260430T021038
CREATED:20240529T023123Z
LAST-MODIFIED:20241106T014045Z
UID:19212-1732816800-1732831200@australiantunnellingsociety.com.au
SUMMARY:ATS QLD - St Barbara's Day Dinner
DESCRIPTION:Join us for the ATS QLD Chapter’s St Barbara’s Day end-of-year celebration and get together. \nThis informal networking-focused event – one of the most highly regarding events on the tunnelling calendar – will involve welcome drinks\, followed by a meal\, speeches by the committee and sponsors\, and the lucky door prize draw. \nThe QLD committee looks forward to catching up with you on the night. \nCosting \n$50 per person \nOur generous event sponsors:
URL:https://australiantunnellingsociety.com.au/ats-event/ats-qld-st-barbaras-day-dinner/
LOCATION:Rose and Crown\, 271 Grey Street\, South Brisbane\, Australia
CATEGORIES:Queensland
ATTACH;FMTTYPE=image/png:https://australiantunnellingsociety.com.au/wp-content/uploads/2024/05/QLD-Barbara-day-post.png
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20241127
DTEND;VALUE=DATE:20241130
DTSTAMP:20260430T021038
CREATED:20240326T033425Z
LAST-MODIFIED:20241112T030021Z
UID:19018-1732665600-1732924799@australiantunnellingsociety.com.au
SUMMARY:ATS Short Course 2024
DESCRIPTION:The ATS Short Course 2024 is a multi-day event\, designed to provide an introduction to the world of tunnels. Event content will closely align with the latest edition of the ATS Tunnel Design Guideline and is a must for tunnelling professionals. Register Now! \nRun every two years since 2007\, the event provides an established platform that delivers a practical introduction to tunnelling to both younger practitioners and those interested in moving into the Australian tunnelling industry. It gives these up-and-coming tunnellers an opportunity to: \n\nLearn new skills and knowledge\,\nDevelop and refresh existing skills and knowledge\,\nGain a competitive edge\,\nInvest in their future\, and\nLearn from and network with industry leaders.\n\nThe course is delivered by experienced professionals from Australian tunnelling who have specialist knowledge in their discipline field. These course presenters are eager to share their knowledge and encourage delegates to develop their understanding and confidence so they can apply the ATS Design Guide across all stages of a tunnelling project. The syllabus is designed to cover relevant topics and ‘must learn’ topics useful to every young and seasoned professional\, including design principles\, construction fundamentals\, sustainability\, fire life safety and project case studies. \n \n  \nRegistration costings \n\nATS/EA Members $850\nNon-Members $1100\nYoung Members $550\nStudent $250\n\nOptional extras \nIn addition to attending the cutting-edge two-day short course\, delegates are encouraged to attend: \n\nSt Barbara’s Day dinner (28th November) – REGISTRATIONS OPEN NOW\nQuarry Day at Mount Coot-Tha (29th November) – REGISTRATIONS OPEN NOW\n\nThese complementary events provide for both fantastic onsite demonstrations and a great networking event to meet the speakers and industry colleagues respectively. \n* Note that both the Quarry Day and St Barbara’s Day dinner require separate bookings\, but priority will be given to Short Course delegates. \n \n  \nOur generous Short Course Sponsors \n \nSPONSOR WEBSITE LINKS \n\nMC \nAurecon\nBarchip inc.\nBekaert\nDelve Underground\nHerrenknecht\nPINI\nSMEC\nSystra Bamser
URL:https://australiantunnellingsociety.com.au/ats-event/ats-short-course-2024/
LOCATION:Engineers Australia QLD\, Level 9\, 340 Adelaide St\, Brisbane\, QLD\, 4000\, Australia
CATEGORIES:Queensland
ATTACH;FMTTYPE=image/png:https://australiantunnellingsociety.com.au/wp-content/uploads/2024/03/Social-tile-no-words.png
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Australia/Brisbane:20241126T173000
DTEND;TZID=Australia/Brisbane:20241126T190000
DTSTAMP:20260430T021038
CREATED:20240909T043528Z
LAST-MODIFIED:20241108T032035Z
UID:19572-1732642200-1732647600@australiantunnellingsociety.com.au
SUMMARY:Ground freezing below a river estuary
DESCRIPTION:Overview \nA new 1.48km road tunnel has been excavated beneath the Świna straits in northwest Poland using a 13.46m slurry TBM. To overcome the challenges posed by low overburden and complex geology\, artificial ground freezing was implemented to enable safe excavation for the emergency egress structures required for motorway operations. This presentation will focus on the design and execution of the ground freezing process\, including analysis of construction phase monitoring data and key lessons learned from this challenging project. \nLearning outcomes \nAttendees will learn about ground freezing under river estuaries. \nTimings \n17:30 – 18:00 – Registration \n18:00 – 18:50 – Presentation \n18:50 – 19:00 – Questions \nIf attending online\, please log in at 17:55. \nSpeaker \n \nAnastasios Konstantinou \nDesigner\, Systra \nAnastasios (Tassos) is a seasoned geotechnical engineering specialising in underground infrastructure design. With a strong background in TBMs\, NATM\, cut and cover structures\, deep excavation as well as soil and rock slope stability\, Tassos brings a comprehensive skill set to his role. Originally from Greece\, Anastasios joined the SYSTRA team in 2018 and is currently the design package lead for the TBM Tunnel Segmental Lining design on the Suburban Rail Loop East\, Work Package C based in Melbourne.
URL:https://australiantunnellingsociety.com.au/ats-event/ground-freezing-below-a-river-estuary-save-the-date/
LOCATION:EA Brisbane Office\, Level 9\, 340 Adelaide St (EA Office)\, Brisbane\, Queensland\, 4000\, Australia
CATEGORIES:Online,Queensland
ATTACH;FMTTYPE=image/png:https://australiantunnellingsociety.com.au/wp-content/uploads/2024/09/Freezing.png
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Australia/Brisbane:20241107T170000
DTEND;TZID=Australia/Brisbane:20241107T180000
DTSTAMP:20260430T021038
CREATED:20240813T015744Z
LAST-MODIFIED:20240819T020450Z
UID:19512-1730998800-1731002400@australiantunnellingsociety.com.au
SUMMARY:ATS technical session: Design of large underground caverns for pumped hydro projects
DESCRIPTION:Overview \nThis webinar will be focused on the design of large underground caverns\, a crucial topic with the current development of multiple Pumped Hydro schemes. The main speaker will be Mousa Hazrati Aghchai\, who has a PhD in rock mechanics and a solid background in geotechnics/rock mechanics in Tunnelling\, Hydropower\, and Dam engineering with 20 years of experience. \nLearning outcomes  \nIn this presentation you will learn: \n\nKey aspects of large underground caverns design for pumped hydro projects.\nMain risks to consider when designing this kind of high-complexity structures.\nCase studies of real projects.\n\nAbout the speaker \n \nMousa Hazrati Aghchai\nTechnical Director Tunnels & Underground Space\, GHD \nMousa has a degree in Rock Mechanics\, and a Masters and PhD both in Rock Mechanics as well. He has been in GHD for 2 years. Mousa has 20 years of experience in the design of surface and underground excavations applied in Civil Engineering such as Tunnel engineering including Roadway\, Railway and water conveyance tunnels both in conventional (drill and blast) and mechanized methods\, Dam engineering\, Hydropower projects\, and Pump storage power plants. As a special expertise\, he has designed several large caverns and deep shafts. Having a solid technical background\, he has extensive experience in empirical\, analytical\, and numerical methods in Tunnel engineering. He has also experience in solving challenges during design\, construction\, and operation periods. Mousa has been involved in design and execution of several national and international projects.
URL:https://australiantunnellingsociety.com.au/ats-event/ats-technical-session-design-of-large-underground-caverns-for-pumped-hydro-projects/
LOCATION:Online and in person at: Level 9\, 340 Adelaide Street\, Brisbane
CATEGORIES:Online,Queensland
ATTACH;FMTTYPE=image/jpeg:https://australiantunnellingsociety.com.au/wp-content/uploads/2024/08/Pumped-hydro-.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Australia/Brisbane:20241017T173000
DTEND;TZID=Australia/Brisbane:20241017T190000
DTSTAMP:20260430T021038
CREATED:20241009T022629Z
LAST-MODIFIED:20241017T004457Z
UID:19742-1729186200-1729191600@australiantunnellingsociety.com.au
SUMMARY:Geological challenges of Brisbane’s Cross River Rail Project
DESCRIPTION:Event overview \nThe Cross River Rail project is a new 10.2 km rail line in Brisbane comprising 5.9 km of twin running tunnels and four new underground stations at Boggo Road\, Woolloongabba\, Albert Street and Roma Street. This presentation describes the wide range of ground conditions encountered\, and how they required the consideration of geotechnical variability and uncertainty during design\, and verification of conditions during construction. It describes the approaches adopted during design and construction to manage some of the more challenging ground conditions \nTimings \n17.30 Networking/refreshments \n18.00 Presentation \n18.45 Q&A \n19.00 Close \nLearning Outcomes \nIn this presentation you will: \n\nGain an understanding of the ground conditions encountered on the Cross River Rail project in the Brisbane CBD\nLearn how the wide range of ground conditions were considered in the design and validated during construction\nGain insight on how some of the more challenging ground conditions were dealt with in design and construction.\n\nSpeaker \n \nRalph Cammack\nPrincipal\, PSM \nRalph Cammack is a Principal Engineering Geologist with PSM. He has over 20 years of consulting experience including geotechnical investigations\, modelling\, analysis\, design and construction phase support for a wide range of mining\, tunnelling and civil infrastructure projects in Australia and internationally. Ralph was a Design Manager for PSM on the CRR project and was involved in the Construction Phase Support for the tunnelling and surface works.
URL:https://australiantunnellingsociety.com.au/ats-event/geological-challenges-of-brisbanes-cross-river-rail-project/
LOCATION:Jacobs Office\, Level 7\, 32 Cordelia Street\, South Brisbane\, QLD\, 4101\, Australia
CATEGORIES:Hybrid,Queensland
ATTACH;FMTTYPE=image/jpeg:https://australiantunnellingsociety.com.au/wp-content/uploads/2024/10/Cross-river-rail.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Australia/Brisbane:20241011T130000
DTEND;TZID=Australia/Brisbane:20241011T170000
DTSTAMP:20260430T021038
CREATED:20240930T043224Z
LAST-MODIFIED:20240930T052405Z
UID:19715-1728651600-1728666000@australiantunnellingsociety.com.au
SUMMARY:Workshop - Achieving\, demonstrating and accepting appropriate fire safety in Australian tunnels
DESCRIPTION:Join us for this half-day workshop in Brisbane.\nWorkshop summary \nThe ATS has established a diverse\, representative Working Group to progress an updated revision of Australia’s tunnel fire safety standard AS4825.  It is proposed to be titled “Fire in Tunnels”\, covering fire safety and asset resilience.  The governance around how an appropriate level of fire safety is demonstrated and accepted for a tunnel is an extremely important topic to be covered by such a standard.  Australia has unique legal and political requirements\, and Australian fire engineering practice has a diverse set of approaches\, there is a need to ‘ventilate’ and share views on the approaches applied\, and learn what we can from other jurisdictions. \nThis workshop will provide a forum for working group members\, industry stakeholders and fire engineering practitioners to engage on the issue.  It is not primarily a training session\, although it will certainly be informative\, and worth attending for that purpose alone. It will be a wide-ranging discussion / debate\, presenting and challenging ideas\, with an outcome of consensus as to how\, out of the options\, a standard should give guidance on this matter for the Australian context.  A position paper will be produced\, that will also inform the drafting of the new standard. \nThe panellists\, who bring leading experience in tunnel fire engineering in Australia and internationally\, will each make short presentations\, curated with the goal of eliciting technical discussions\, and suggestions topics for inclusion or exclusion for the updated draft standard. \nOverseas panellists will join online.  Australian participants are strongly encouraged to attend in person. \nModerator: Nigel Casey \nNigel is a careful\, accurate thinker\, whose career has seen him ponder the issues on fire risk acceptance in major underground road and rail projects\, from a government perspective.  He has been active on the Austroads Tunnel Taskforce\, and in raising and prosecuting risk-related development projects. \nRapporteur: Diane Mather \nDiane is the driving force of AS4825 revision\, taking on the task of capturing the outcomes. \nPanelists: \n\nBernhard Kohl\, foremost practitioner in tunnel safety and risk analysis\, based in Austria but practicing globally\, including on the Australasian DG method with Conrad Stacey.\nMichael Beecroft\, leading the contributions to AS4825 from fire brigades (AFAC)\, a fire safety engineer working for the Queensland Fire Department\, with experience working in private industry and consulting.\nCraig Hiscock\, a tunnel fire safety and tunnel systems technical director with design delivery and design review experience.\nAmer Magrabi\, Society of Fire Safety Representative and former AS 4825:2011 committee member.\nDavid Radcliffe\, Rail industry ‘wise elder’ and Strategic Adviser to Suburban Rail Loop\, representing owners and operators.\nIngo Riess\, a leading Zurich-based tunnel ventilation and safety consultant\, with experience in Australia and many other countries.\nConrad Stacey\, Chair of the AS4825 Working Group\, well known in the underground ventilation and fire engineering industry internationally.\nArnold Dix\, Australia’s celebrity tunneller\, barrister and International Tunnelling Association President\, keeping us on a sound legal basis.\n\nParticipants: \nYou (we very much hope)\, particularly if you want to contribute. \nDetails: \nDate:  11 October 2024 \nTime: 1 pm to 5 pm\, with breaks\, followed by refreshments and erudite discussion till late. \nCost: Free in person (also free on-line\, but you don’t get any post-event refreshments or erudite discussion that way). \nLocation: eVENT Space\, 4/35 Limestone St\, Darra\, Queensland\, 4076.  On-street parking is available.  eVENT Space is a 10 to 15 minute walk from the Darra train station\, which has direct services from the city and indirect services from Brisbane airport\, with transfer at one city station.  Pickup and drop-off at the station will also be arranged for anyone requesting it. \nThe session is supported by the Australian Tunnelling Society and by the Society of Fire Safety. It is sponsored by Stacey Agnew through their eVENT Space. \nRegistration: \nTo register your interest to attend please click here. To make other enquiries\, email event@staceyagnew.com.
URL:https://australiantunnellingsociety.com.au/ats-event/workshop-achieving-demonstrating-and-accepting-appropriate-fire-safety-in-australian-tunnels/
LOCATION:eVENT Space\, 4/35 Limestone St\, Darra\, Queensland\, 4076\, Australia
CATEGORIES:Queensland,Webinar
ATTACH;FMTTYPE=image/jpeg:https://australiantunnellingsociety.com.au/wp-content/uploads/2024/09/Fire-event-scaled.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Australia/Brisbane:20240815T180000
DTEND;TZID=Australia/Brisbane:20240815T190000
DTSTAMP:20260430T021038
CREATED:20240805T022141Z
LAST-MODIFIED:20260209T013813Z
UID:19469-1723744800-1723748400@australiantunnellingsociety.com.au
SUMMARY:DAARWIN-GEMINI A novel tool to predict advance rate of a TBM in real-time
DESCRIPTION:Overview\nSAALG Geomechanics\, in collaboration with ACCIONA\, has developed DAARWIN-GEMINI\, a software system designed to optimize the performance of tunnel boring machines (TBMs) using machine learning-based techniques. The system key features include an advanced architecture for querying and processing data from the TBM database\, big data analysis and visualization in a web browser\, a ground-machine interaction model to predict the TBM advance rate and operation anomalies detection via machine learning algorithms to enhance the efficiency and reliability of tunnel excavation operations. The system has been validated in the Mularroya (Spain) hydraulic tunnel (small diameter shield TBM) in fractured rock mass with faulted and sheared zones\, and implemented in a larger diameter tunnel with EPB in Sao Paulo (Brazil) in weathered granite materials. In both cases\, the ground-machine excavation model was trained with excavation data from each tunnel and the model was deployed to provide real-time predictions of the penetration rate during the TBM operation. \nThis is an in-person and online event. \nLearning outcomes\nIn this presentation you will learn: \n\nHow machine learning is being applied within the tunnelling industry to improve productivity and reduce risk.\nA statistical approach to a ground-machine interaction model to predict the penetration rate of a TBM from performance parameters and geotechnical parameters.\nArchitecture and workflow of a system capable of providing predictions of the penetration rate at ring level and perform geotechnical back-analysis to assess spatial variability of ground parameters.\nLessons learned from the implementation of the system in two case studies\, a small diameter hydraulic tunnel in Spain and a metro tunnel in Brazil.\n\nEvent program\n\n5:30 pm AEST:  In-Person event registration opens\n6:00 pm AEST:  Event commences (online event starts here)\n7:00 pm AEST:  Event concludes\n\nAbout the speaker\n \nIgnasi Aliguer \nCTO and Co-Founder\, SAALG Geomechanics \nIgnasi Aliguer is Chief Technology Officer and Co-Founder at SAALG Geomechanics\, a software company and engineering firm focused on advanced digital tools for geotechnical engineering problems. Ignasi worked as a Research Engineer at Tech. University of Catalonia\, focusing on hydraulic fracture numerical simulations working with a major oil company. He also served as a Visiting Research Scholar at the University of Colorado at Boulder. He then joined Petrabytes\, a software company providing data solutions and visualization tools for the oilfield industry. Ignasi then co founded SAALG\, where he leads the team in charge of developing DAARWIN.
URL:https://australiantunnellingsociety.com.au/ats-event/daarwin-gemini-a-novel-tool-to-predict-advance-rate-of-a-tbm-in-real-time/
LOCATION:Online and in person at: Level 9\, 340 Adelaide Street\, Brisbane
CATEGORIES:Online,Queensland
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Australia/Brisbane:20240627T173000
DTEND;TZID=Australia/Brisbane:20240627T200000
DTSTAMP:20260430T021038
CREATED:20240531T040507Z
LAST-MODIFIED:20240611T000226Z
UID:19226-1719509400-1719518400@australiantunnellingsociety.com.au
SUMMARY:Bridging the Gap: Addressing Gender Pay Disparities in Engineering - REGISTER NOW!
DESCRIPTION:REGISTER NOW! \nPanellists consisting of industry leaders\, academia experts\, and engineering professionals will have an open discussion on the current state of the gender pay gap\, the policies driving change\, and the initiatives aimed at closing the gap in the engineering sector. \nThe forum aims to foster dialogues on multiple perspectives from existing policies to recent legislative developments\, to gender equality criteria in tender processes. With engaging discussion\, the forum aims to benefit a broad audience on understanding where we are at approaching a more equitable and inclusive future for all professionals in the field. \nBy joining this event\, you will:  \n\nUnderstand current landscape of the issue and policies designed to address it\nGain insights into practical initiatives and strategies for closing the gender pay within tender and procurement processes\nIdentify actionable steps that can be implemented within one’s own organisation\nBe equipped with the latest statistics\, transparency tools\, and benchmarking standards to monitor and report disparities.\n\nSpeakers \n \nKaren Whelan \nAssociate Dean\, Learning & Teaching | Faculty of Engineering | Queensland University of Technology \nKaren is a materials engineer and engineering educator with over 25 years of experience in the higher education sector. Her research is on gender diversity and inclusion in engineering education and engineering practice. As Associate Dean\, Learning and Teaching she has strategic oversight of course and curriculum development and teaching quality\, in the QUT Faculty of Engineering\, which offers undergraduate and postgraduate degrees in nine engineering disciplines\, as well as in architecture and the built environment. In 2023 and 2024 QUT introduced an innovative and contemporary set of new degree programs including integrated vertical degrees\, giving students the opportunity to study for a Bachelor of Engineering (Honours) and a Masters degree in one of the following areas: Robotics and AI\, Advanced Manufacturing\, Sustainable Infrastructure\, and Renewable Energy. Karen is Chair of the Engineers Australia Women in Engineering Queensland Committee\, and a member of the EA National Committee for Women in Engineering. She also leads a Diversity and Inclusion Special Interest Group in the Australasian Association for Engineering Education. \n \nDr Melinda Laundon \nSenior Research Fellow from the Australian Cobotics Centre and Centre for Decent Work and Industry\, Queensland University of Technology \nDr Melinda Laundon is a Senior Research Fellow from the Australian Cobotics Centre and Centre for Decent Work and Industry\, Queensland University of Technology. Melinda has a longstanding interest in gender equity at work and has researched fair pay\, pay transparency\, and flexible work. Her recent and current research projects include reward and recognition in the Australian finance sector\, the impact of emerging technologies on workers and organisations\, and university teaching and learning. Melinda’s career prior to academia was in the Australian Public Service. \n \nMaria Koutsimpisis \nProject Controls Manager – Southern Program Alliance (Level Crossing Removal Project) – Acciona AU & NZ \nMaria has had over 20 years’ experience in complex\, capital-intensive multinationals\, leading large cross-functional teams on multi-year\, billion-dollar projects. She is the Project Controls Manager at Southern Program Alliance and Regional Project Controls Manager for ACCIONA and prior to this had a successful international executive automotive career with General Motors. She has an MBA from the Melbourne Business School and BEng(Mech) Hons/ BSc(Mathematics) from the University of Melbourne. She is an EngExec and Fellow with Engineers Australia and is Chartered in Leadership & Management and Project Management. She is the Chair of the National Committee for Women in Engineering\, a Non Executive Director with ANCAP and an Advisory Board Member with Power of Engineering. \n \nCathy Sanders \nHR manager\, Acciona \nCathy has been in civil construction for last 7 years\, having started her career in education and training over 20 years ago. As a secondary teacher by trade\, her passion for learning pathways quickly evolved into career pathways within human resources. Cathy is an advocate for the opportunities transferrable skills can bring into the construction industry\, especially for women\, and she demonstrates that both within her role with Acciona and through volunteering on the NAWIC Education and Mentoring Committee. \n 
URL:https://australiantunnellingsociety.com.au/ats-event/bridging-the-gap-addressing-gender-pay-disparities-in-engineering-save-the-date/
LOCATION:Online and in person at: Level 9\, 340 Adelaide Street\, Brisbane
CATEGORIES:Hybrid,Online,Queensland
ATTACH;FMTTYPE=image/jpeg:https://australiantunnellingsociety.com.au/wp-content/uploads/2024/05/Women-in-tunnelling-breakfast-scaled.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Australia/Brisbane:20240613T170000
DTEND;TZID=Australia/Brisbane:20240613T183000
DTSTAMP:20260430T021038
CREATED:20240611T004612Z
LAST-MODIFIED:20240611T005403Z
UID:19280-1718298000-1718303400@australiantunnellingsociety.com.au
SUMMARY:High pressure water mist in tunnels - SHORT NOTICE EVENT - REGISTER NOW!
DESCRIPTION:Overview \nGain insights from recent full-scale tunnel fire tests showcasing the performance of water mist systems in real-world scenarios.  Explore case studies of successful installations of water mist systems in tunnels\, such as the refurbishment project of the Hugh Carey Tunnel (formerly Brooklyn Battery Tunnel) in New York City and the deployment in the Ismailia Tunnel beneath the Suez Canal in Egypt.  Uncover key findings from the SUVEREN research project\, including comprehensive fire tests involving batteries. Learn about the project’s contributions to advancing tunnel safety through innovative technologies. Join us for a deep dive into the latest advancements in tunnel safety and the critical role of water mist systems. \nLearning outcomes \nBy attending this event\, you will: \n\nUnderstand the criteria for determining when a water mist system is suitable for integration into both new and existing tunnel projects\, considering factors such as tunnel design\, location\, and potential fire risks.\nIdentify circumstances where a water mist system may not be the optimal choice for a tunnel project\, recognizing limitations and constraints that may impact its effectiveness or feasibility.\nEvaluate the potential ofwater mist systems to compensate for existing deficits in tunnel safety measures\, exploring their capacity to mitigate fire hazards and enhance overall safety standards.\nAnalyse the firefighting performance of water mist systems in tunnels through examination of testing results\, gaining insights into their efficacy in controlling and suppressing tunnel fires.\nGain knowledge of the technical layout parameters of water mist systems\, including design considerations\, installation requirements\, and operational functionalities\, to facilitate informed decision-making and effective implementation in tunnel projects.\n\nEvent program  \nIn-person:  \n\n5:00 pm AEST – Registration and refreshments\n5:30 pm AEST – Event begins\n6:30 pm AEST – Event concludes\n\nOnline: \n\n5:30 pm AEST – Event begins\n6:30 pm AEST – Event concludes\n\nAbout the speaker \n \nArmin Feltmann \nBusiness Manager for Tunnel System\, FOGTEC Fire Protection
URL:https://australiantunnellingsociety.com.au/ats-event/high-pressure-water-mist-in-tunnels/
LOCATION:Online and in person at: Level 9\, 340 Adelaide Street\, Brisbane
CATEGORIES:Hybrid,Queensland
ATTACH;FMTTYPE=image/jpeg:https://australiantunnellingsociety.com.au/wp-content/uploads/2024/06/Mist-in-tunnels.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Australia/Brisbane:20240611T143000
DTEND;TZID=Australia/Brisbane:20240611T160000
DTSTAMP:20260430T021038
CREATED:20240513T015355Z
LAST-MODIFIED:20240513T030555Z
UID:19168-1718116200-1718121600@australiantunnellingsociety.com.au
SUMMARY:Site visit - Roma Street station fitout and commissioning
DESCRIPTION:The ATS invites all members\, non-members\, young engineers and students to join us for the site visit at the Cross River Rail Roma Street station.  \nYou will have the opportunity to see all the mechanical and electrical equipment (electrical rooms\, fan rooms\, fire control centres\, etc) that support operating the underground station and have to be accommodated in underground spaces at Roma Street station. The project is transitioning to the commissioning phase while construction goes into completion mode. \nDon’t miss this opportunity to see all the ancillary equipment that is typically not visible to the public and learn from the people responsible for the day-to-day work. \nThis event will be held in person and capped to a maximum of 30 people. \nPPE required for the site visit: high-vis long sleeve shirt\, pants\, safety boots\, safety gloves and safety glasses. Hard hats and cap lamps will be provided. \nThank you to CBGU D&C JV and Cross River Rail Delivery Authority for facilitating this event. \nPlease note: This is a registration to enter the draw for the site visit. Due to the limited number of attendees permitted\, registration does not guarantee a place on the site visit itself. Once registered for the draw you will receive a calendar invitation for the site visit\, this is a Teams default and should be treated as pending until the draw has taken place. A separate confirmation email will be sent to successful applicants after the draw has taken place. \nSpeakers \n \nChris Baker \nDesign Manager\, UGL Pty Limited \n \nBrad Sandford \nDelivery Manager for Tunnels at Cross River Rail Delivery Authority \n 
URL:https://australiantunnellingsociety.com.au/ats-event/site-visit-roma-street-station-fitout-and-commissioning/
LOCATION:Roma Street Station\, 171 Roma Street\, Brisbane\, Queensland\, 4000\, Australia
CATEGORIES:Queensland
ATTACH;FMTTYPE=image/jpeg:https://australiantunnellingsociety.com.au/wp-content/uploads/2024/05/Roma-st-fitout.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Australia/Brisbane:20240430T100000
DTEND;TZID=Australia/Brisbane:20240430T120000
DTSTAMP:20260430T021038
CREATED:20240318T010720Z
LAST-MODIFIED:20240318T010846Z
UID:18969-1714471200-1714478400@australiantunnellingsociety.com.au
SUMMARY:Site visit – Transurban road tunnel control room – Brisbane
DESCRIPTION:Join the ATS and Transurban in an immersive exploration into the nerve centre of tunnel systems with a site visit to a road tunnel control room in Brisbane. \nOverview \nTransurban control rooms are the pulsating brain behind the seamless operation of tunnels. These control rooms stand as the guardians of safety\, efficiency\, and operations in the bustling underground arteries of transportation networks. This visit to the Road Tunnel Control Room offers a unique opportunity for new engineers and experts alike to delve deep into the intricate workings of these vital facilities. Serving as the centre of monitoring\, management\, and response\, control rooms play a pivotal role in ensuring the smooth flow of traffic and maintaining the utmost safety standards within tunnels. \nLearning outcomes \n\nIntroduction to Control Room Operations: experienced operators will provide insights into the primary functions and responsibilities of control room teams.\nEquipment Review: Witness firsthand the technology and equipment that empower control room operators to uphold efficiency and safety standards.\nInsights from Industry Experts: Benefit from the expertise of professionals as they share insights from years of experience in tunnel management and control room operations.\n\n  \nLocation \nAPL Office and Control Room\nNote: Street parking is available near the office. Press intercom at gate at front for access to site.  \n \nTiming \nArrive for 10am \nNote: PPE will not be required for this site visit.  
URL:https://australiantunnellingsociety.com.au/ats-event/site-visit-transurban-road-tunnel-control-room-brisbane/
LOCATION:APL Office and Control Room\, 1 Clarence Road\, Kedron\, Brisbane
CATEGORIES:Queensland
ATTACH;FMTTYPE=image/jpeg:https://australiantunnellingsociety.com.au/wp-content/uploads/2024/03/QLD-clarence-control-room.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Australia/Brisbane:20231207T190000
DTEND;TZID=Australia/Brisbane:20231207T200000
DTSTAMP:20260430T021038
CREATED:20231128T014750Z
LAST-MODIFIED:20231128T014750Z
UID:18578-1701975600-1701979200@australiantunnellingsociety.com.au
SUMMARY:Considerations for designers and constructors to deliver practical operation and maintenance outcomes
DESCRIPTION:Overview \nGain insight into tunnel maintenance as the presentation contrasts key considerations for designers/constructors with maintenance regimes over tunnel operational service life. \nFocusing on the interface between tunnel systems is key to meeting design life requirements and ensuring a maintainable fit-for-service underground space. \nThe presentation will look at case studies both locally and internationally\, as well as provide insight into what systems are in place for tunnel maintenance after a project is handed over to the operator. \nLearning outcomes \nYou will gain insights on the general complexities with writing O&M manuals for civil aspects. This includes consideration for durability\, access\, frequency\, interpretation of design intent\, defining what is reasonable for maintenance and determining whether it can be reasonably completed. \n\nTunnel linings\, seepage and anchors.\nCable trays and infrastructure.\nVent stations.\nCut and cover areas.\nDrainage systems (groundwater and stormwater).\n\nAbout the speaker \nKaylah MacIntosh\, Technical Services Manager\, John Holland \n \nBased in Brisbane\, Kayla Macintosh is a Mechanical Engineer with a Masters in Geophysics working for John Holland as a Technical Services Manager. Kaylah is an experienced underground space engineer with design\, construction and maintenance experience in tunnelling & infrastructure spanning over 10 years. Kaylah has previously held roles in operational road tunnel capital works delivery\, which she leverages to drive improved Operation and Maintenance outcomes through smart tunnel system design solutions on in-flight projects. 
URL:https://australiantunnellingsociety.com.au/ats-event/considerations-for-designers-and-constructors-to-deliver-practical-operation-and-maintenance-outcomes/
LOCATION:Online and in person at: Level 9\, 340 Adelaide Street\, Brisbane
CATEGORIES:Queensland,Webinar
ATTACH;FMTTYPE=image/jpeg:https://australiantunnellingsociety.com.au/wp-content/uploads/2023/11/Capture.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Australia/Brisbane:20231201T180000
DTEND;TZID=Australia/Brisbane:20231201T220000
DTSTAMP:20260430T021038
CREATED:20231101T044200Z
LAST-MODIFIED:20231101T233450Z
UID:18518-1701453600-1701468000@australiantunnellingsociety.com.au
SUMMARY:ATS QLD - St Barbara's Day dinner - 1 December
DESCRIPTION:Overview \nJoin the Queensland Chapter of the ATS for our annual end-of-year celebration and get together. \nThis informal networking-focused event will provide the opportunity for tunnelling professionals and friends to celebrate St Barbara’s Day. \nWe are also delighted to announce that we will also be presenting the award to the winner of the David Sugden Young Members Writing competition. \nThe event is one of the most highly regarded events in the tunnelling calendar. \nThe night will involve welcome drinks\, followed by a meal\, speeches by the committee and sponsors\, and the lucky door prize draw. \nThe QLD committee looks forward to catching up with you on the night. \nEvent program \n\n6.00 pm AEST: Registrations open and event commences\n6:30 pm AEST: QLD Chair 2023 Address and sponsor acknowledgement\n6:45 pm AEST: Dinner is served\n8.00 pm AEST: Drinks and networking\n10.00 pm AEST: Event concludes
URL:https://australiantunnellingsociety.com.au/ats-event/ats-qld-st-barbara-day-dinner-1-december/
LOCATION:The Charming Squire\, 3/133 Grey Street\, Brisbane\, Queensland\, 4101\, Australia
CATEGORIES:Queensland
ATTACH;FMTTYPE=image/png:https://australiantunnellingsociety.com.au/wp-content/uploads/2023/11/QLD-Barbara-day-post.png
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Australia/Brisbane:20230928T180000
DTEND;TZID=Australia/Brisbane:20230928T200000
DTSTAMP:20260430T021038
CREATED:20230921T064258Z
LAST-MODIFIED:20230921T070533Z
UID:18423-1695924000-1695931200@australiantunnellingsociety.com.au
SUMMARY:Tunnel systems: planning assets today for the future
DESCRIPTION:Overview \nIn this session\, we will explore examples of tunnels that have undergone significant refurbishment\, upgrade\, or change to their systems\, both locally and internationally. \nWe will examine some of the lessons learned and challenges overcome. Our objective is to look at how these lessons might be applied to tunnel systems today to better support our changing needs. Additionally\, we will examine the trends that might inform how we best plan for the future state\, including human factors\, developments in technology\, and how we can better shape the reliability and serviceability of these systems as they go through these changes. \nFurther information \nAustralia has experienced a revolution in underground transport infrastructure over the past three decades as the population of our cities has grown. Some of our major transport tunnels are now approaching lifecycle milestones\, and in particular\, some tunnel systems are approaching the end of their economic life. Many tunnels have already undergone retrofits of new system technologies and repurposing to different transport functions\, such as the conversion of rail to metro. These changes require significant modifications to the existing tunnel systems\, which might not have been foreseen at the time of construction. The need to make significant changes to tunnel systems for upgrades or repurposing is not a new concept. \nIn countries with more established underground infrastructure\, this reality has been experienced multiple times. There are also notable examples of tunnels for more specialized purposes that have undergone radical changes to support new functions. Looking back\, we can see that there are needs for these tunnel systems today that would have been hard to imagine at the time of their construction. Changes to the climate\, resources\, the way we work and how we use and transmit information are all factors that have contributed to this. Considering the current rate of change\, it may be even more difficult to imagine what we will expect of these systems in 30 years’ time. \nEvent program \nIn person: \n\n5:30 pm AEST: Registration and arrival\n6:00 pm AEST: Event commences\n7:00 pm AEST: Presentation concludes and Networking\n8:00 pm AEST: Event concludes\n\nOnline: \n\n6:00 pm AEST: Event commences\n8:00 pm AEST: Event concludes\n\nAbout the speaker \n \nTom Starling\nPrincipal Mechanical Engineer\, Worley \nTom is a mechanical engineer with 17 years’ of experience\, half of that in major transport infrastructure projects\, working in a variety of roles\, from technical advice in financing and partnerships\, through to testing and commissioning. Being involved at the earliest and latest stages of tunnel system design and construction\, Tom has experience in blue sky planning for possible future usage scenarios\, and has also developed solutions to enable and execute the upgrade\, retrofit and repurpose of existing tunnel systems. The balance of his experience is in a range of sectors; buildings\, water\, defence and resources\, both surface and underground\, which face similar and different challenges to transport tunnel infrastructure. \n  \nMC \n \nTeresa Sandum\nSenior Fire Safety Engineer \nTeresa is a Senior Fire Safety Engineer with 7 years of experience on a range of infrastructure and building projects in Victoria\, New South Wales\, Queensland and New Zealand. Teresa is currently part of the Tunnel System Fire and Life Safety team at WSP and currently working Melbourne Metro Tunnel Project\, North-East Link (NEL) and Southern Program Alliance (SPA) for Level Crossing Removal. \nTeresa have extensive experiences in CFD simulations using Fire Dynamics Simulation for station building\, airports\, and shopping centres. She also specialises in dynamic egress modelling using advanced crowd-based simulation software\, MassMotion for Melbourne Metro and the new Adelaide Street Tunnel for Brisbane Metro. She also provided fire and life safety strategy and evacuation strategy on the existing MURL works as part of the breakthrough interface between the new State Library Station (Melbourne Metro) and Melbourne Central Station (MURL).
URL:https://australiantunnellingsociety.com.au/ats-event/tunnel-systems-planning-assets-today-for-the-future/
LOCATION:Online and in person at: Level 9\, 340 Adelaide Street\, Brisbane
CATEGORIES:Online,Queensland
ATTACH;FMTTYPE=image/jpeg:https://australiantunnellingsociety.com.au/wp-content/uploads/2023/09/Tunnel-systems-planning-assets-event.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20230831
DTEND;VALUE=DATE:20230901
DTSTAMP:20260430T021038
CREATED:20230413T035004Z
LAST-MODIFIED:20230810T111814Z
UID:17874-1693440000-1693526399@australiantunnellingsociety.com.au
SUMMARY:Mt Coot-tha Quarry Site Visit - Register Now!
DESCRIPTION:REGISTER NOW – Limited Places \nFollowing the success of the Mt Coot-tha Quarry site visit in 2020\, ATS Queensland is again excited to invite members to Quarry Day 2023 on 31 August 2023 proudly supported and sponsored by our prime sponsor DESOI. \nThe day is aimed at graduate and early career professionals and will cover a range of equipment and technical demonstrations. These will feature: \nRock fissure and crack injection – DESOI \nShotcrete pumping and application – JEMNA \nLithium battery exposed to high temperature – STACEY AGNEW \nUse of drones in a construction setting – UNIVERSITY OF QUEENSLAND \nRock drilling – OPTIONX \nRock drilling – VERMEER \nMASTER BUILDERS SOLUTIONS + BLUEY TECHNOLOGIES ANZ \nProducts – BluCem HS200 RMX\, BluCem HS200\, MasterSeal 345 \nBluCem HS200 RMX\, is a ready mix product which arrives pre-mixed in concrete agitators on site to form an ultra-flow cementitious grout. BluCem RMX HS200 is a pumpable\, high strength product suitable for civil engineering applications. BluCem RMX HS200 incorporates advanced additives to form a cementitious grout which is free of alluminate and metallic expansion agents or methocel based additives providing a product suitable for 100 year design life applications. \nBluCem HS200\, is a one component powder product which requires only the addition of water to form an ultra flow cementitious grout. BluCem HS200 is a pumpable\, high strength product suitable for civil engineering applications. BluCem HS200 incorporates advanced additives to form a cementitious grout which is free of alluminate and metallic expansion agents or methocel based additives providing a product suitable for 100 year design life applications. \nA coffee van in the morning available in the quarry (kindly supported by the exhibitors). \nNote: All delegates will be required to wear long pants\, closed toe safety boots and a long sleeve shirt. Reasonable fitness and mobility is required as the tour involves walking through a working quarry. \n  \nSchedule \nThe day will be split into two parts: \nSession 1 – Commence 0800 Induction. \nIn the quarry with a chance to meet the supplier and see hands on demonstrations; \nLunch – Mt Coo-tha Cafe; and \nSession 2 – Presentations from the demonstrators and suppliers covering the morning’s activities with the opportunity for Q&A. \nFinish 1530 \nNote that demonstrations and presentations are subject to change on the day. \n\n Prime Sponsor \n \nIS YOUR PARTNER FOR INJECTION TECHNOLOGY
URL:https://australiantunnellingsociety.com.au/ats-event/mt-coot-tha-quarry-site-visit/
LOCATION:Mt Coot-tha Quarry site visit\, Brisbane\, QLD
CATEGORIES:Queensland
ATTACH;FMTTYPE=image/jpeg:https://australiantunnellingsociety.com.au/wp-content/uploads/2023/04/Mt-Coot-tha-Quarry_2.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Australia/Brisbane:20230824T173000
DTEND;TZID=Australia/Brisbane:20230824T193000
DTSTAMP:20260430T021038
CREATED:20230417T225105Z
LAST-MODIFIED:20230725T102700Z
UID:17892-1692898200-1692905400@australiantunnellingsociety.com.au
SUMMARY:ATS QLD - Discrete fracture network approach for underground support design optimisation
DESCRIPTION:Ground support design for underground rock engineering projects often adopts empirical methods\, which were mostly developed in 1960s and 1970s. While these methods have provided a useful tool to aid design\, they have typically been based on a limited database of project experience and so their results need to be interpreted in the context of local experience and engineering judgement. Discrete Fracture Network (DFN) model allows inclusion of site-specific discontinuities data to be stochastically quantified and explicitly adopted as design input. Combined with 3D Distinct Element Method\, this approach offers a more quantifiable\, verifiable and reproduceable method to assess rock mass quality & behaviour in underground excavation projects. \nThis presentation demonstrates benefits gained from this integrated approach in ground support design for large span rock caverns using a case study. The use of DFN and explicit modelling has allowed ground support to be optimised based on site-specific and more realistic anticipated ground conditions. Ivan is the David Sugden Award winner for 2022 and will present his award-winning paper in person entitled: Discrete Fracture Network Approach in Ground Support Design Optimisation for Large Span Cavern in Jointed Rock Mass. The David Sugden Award was initiated by the ATS in 2004 to encourage young engineers to develop the art of technical writing. The competition is open to all ATS members and university students under 35 years of age. \nLearning Outcomes\nIvan is the David Sugden Award winner for 2022. He will present his award-winning paper in person. This presentation\, so-called’ David Sugden Award Road Show’ is one of the annual events organised by ATS. Key takeaways will include: \n\ninterpretation of discontinuities in rock mass using DFN application of the advanced analytical method to understand rock mass behaviour\nactual large cavern design case.\n\nEvent Program\n\n5.30pm: Welcome and light refreshments\n6.00pm: Presentation commencement\n7.00pm: Networking and drinks\n7.30pm: Event concludes\n\nTicket Inclusions\n\nLight refreshments\nCanapes\nNon-alcoholic beverages\nAlcoholic beverages\n\nAbout the speaker\n \nIvan Haryono\, MIEAust CPEng NER\nSenior Associate Geotechnical Engineer\, WSP \nIvan Haryono is Chartered and Registered Professional Geotechnical Engineer with over 12 years of experience on large scale tunnelling and deep excavation projects in Hong Kong\, Canada\, Australia\, Singapore\, and the Netherlands in different project stages; from tender & detailed design\, construction phase services\, forensic analysis and claims\, and independent review. He has worked on various Drill & Blast tunnels\, TBM tunnels\, deep shafts in both soft ground and rocks; for metro railway & stations\, highways\, wastewater treatment plants\, and mines. He is experienced in advanced numerical analysis for soil or rock mechanics and ground-structure interaction problems\, including finite element\, finite difference\, & distinct element methods\, and discrete fracture network modelling.
URL:https://australiantunnellingsociety.com.au/ats-event/discrete-fracture-network-approach-for-underground-support-design-optimisation-2/
LOCATION:Engineers Australia QLD\, Level 9\, 340 Adelaide St\, Brisbane\, QLD\, 4000\, Australia
CATEGORIES:Queensland
ATTACH;FMTTYPE=image/jpeg:https://australiantunnellingsociety.com.au/wp-content/uploads/2022/10/EA_141022046-9.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Australia/Sydney:20230420T180000
DTEND;TZID=Australia/Sydney:20230420T190000
DTSTAMP:20260430T021038
CREATED:20230313T045324Z
LAST-MODIFIED:20230320T005459Z
UID:17672-1682013600-1682017200@australiantunnellingsociety.com.au
SUMMARY:Brisbane Metro Adelaide Street tunnel
DESCRIPTION:Overview\nThe Adelaide Street tunnel is a critical piece of the Brisbane Metro project that provides additional capacity to Brisbane’s public transport system but requires the construction of a new road only 3.5m below the existing roadway. \nThis presentation will describe the need for the tunnel and the constraints of complex geology\, buried services\, traffic loading\, adjacent heritage structures\, and a demanding construction program with very little support site area. The presentation will describe how these challenging constraints have been met\, including the design and construction of a relatively large span soft ground tunnel\, which involves over 20km of canopy tubes and 19kms of fiberglass face nails installed in a complex construction sequence to minimise surface movements and provide sufficient space for the final bidirectional tunnel. The presentation will also include a brief update of construction progress. \nIn this presentation\, you will learn: \n\nwhat drives shallow tunnelling over cut and cover\n\n\nhow typical urban constraints can be overcome to successfully design and execute a shallow soft ground tunnel.\n\nEvent program\nIn-person:  \n\n5:30pm AEST: Arrival and registrations open.\n\n\n6:00pm AEST: Presentation commences.\n\n\n7:00pm AEST: Presentation concludes.\n\n\n7:00pm AEST: Networking commences.\n\nOnline:  \n\n6:00pm AEST: Presentation commences.\n\n\n7:00pm AEST: Presentation concludes.\n\nWho should attend?\nTunnelling engineers and those interested in this space. \nAbout the speakers\nHenry Unwin FIEAust CPEng\nPrincipal Project Manager at Brisbane City Council \nAfter graduating from Portsmouth Polytechnic in 1984\, he started work with Taylor Woodrow Construction working on projects in the industrial\, commercial\, wastewater\, and nuclear projects across the UK\, and the renovation and extension of the Hunghom Rail Terminus in Kowloon (with 100\,000 passengers per day commuting through the construction works). Henry migrated to Australia in 2008 and worked as Engineering Manager on a number of major infrastructure projects including Brisbane Airport Domestic Terminal Expansion; Sydney Metro; Darwin\, Gladstone and Broome LNG projects; Surat Basin Rail and a major 100Ml/d Water Treatment Plant. Henry is currently Principal Project Manager Infrastructure Design & Assurance on Council’s Brisbane Metro project. \nRussell Connors\nSenior Project Engineer\, Acciona \nRussell Connors is a Senior Project Engineer who has worked on several technically challenging and complex tunnelling projects across Australia and Singapore. Russell’s experience includes Earth Pressure Balance and Slurry Shield Tunnel Boring Machines operating in dense urban environments. Russell is currently involved with the planning and execution of the Adelaide Street Tunnel through the heart of Brisbane CBD\, a soft ground mined tunnel with extremely low ground cover close to heritage listed and sensitive structures. Originating from Melbourne\, Australia\, Russell graduated from RMIT University with a Bachelor of Civil Engineering and Infrastructure. Russell has also received several awards from Australian and Singaporean tunnelling societies recognising his technical expertise. \nSilvia Ferrero MIEAust CPEng NER\nGeotechnical Engineer at Arup \nSilvia is a geotechnical engineer in Arup with over 20 years’ experience in the design and delivery of small to large scale projects\, from concept design to detailed design. Silvia completed her engineering studies in Italy\, and then moved to the UK where she worked as junior engineer for 4 years\, before joining Arup in the Milan office and then moving to Brisbane in 2011. Silvia’s experience is mostly focused on design and review of geotechnical aspects within multidisciplinary projects\, including infrastructure and building projects. For Brisbane Metro\, Silvia led the geotechnical and structures team\, developing the geotechnical interpretation of the ground conditions and geotechnical design.
URL:https://australiantunnellingsociety.com.au/ats-event/brisbane-metro-adelaide-street-tunnel/
LOCATION:Hybrid – online and in person at Little Shoe\, 1st Floor\, Yagan Square\, Perth
CATEGORIES:Online,Queensland
ATTACH;FMTTYPE=image/jpeg:https://australiantunnellingsociety.com.au/wp-content/uploads/2023/03/Adelaide-Street-Tunnel-Portal-27-FEB-2023--scaled.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Australia/Sydney:20221201T190000
DTEND;TZID=Australia/Sydney:20221201T220000
DTSTAMP:20260430T021038
CREATED:20221009T225408Z
LAST-MODIFIED:20221116T051126Z
UID:17210-1669921200-1669932000@australiantunnellingsociety.com.au
SUMMARY:ATS QLD - St Barbara Day dinner 2022
DESCRIPTION:This event will be held in Australian Standard Time (AEST). This means minus one hour from AEDT time shown on this listing.  \nThis is the yearly celebration and get together for the Queensland Chapter of the ATS\, with a selected charity and raffle being held on the night. We will\, per usual\, seek sponsors for the night. \nThis networking-focused event will recognise the achievements of tunnelling projects and their engineers around the country and will promote the industry. The event is one of the most highly regarded events in the tunnelling calendar. The night will involve welcome drinks\, followed by a Christmas meal\, speeches by the committee and sponsors\, and the lucky door prize draw. \nThe evening will raise funds for Retina Australia by donating a portion of the ticket price to the charity. Retina Australia funds world-leading research into treatments and cures for blindness caused by inherited retinal disease and cares for people and families through peer-to-peer support services. Through education and advocacy Retina Australia works tirelessly to empower around 15\,000 Australians who are living with blindness or vision impairment. \nEvent program\n6.00 pm AEST: Registrations open and event commences \n6:30 pm AEST: Presidents 2022 Address and sponsor acknowledgement \n6:45 pm AEST: Dinner is served \n8.00 pm AEST: Drinks and networking \n10.00 pm AEST: Event concludes \nSponsors
URL:https://australiantunnellingsociety.com.au/ats-event/ats-st-barbara-day-dinner-2022/
LOCATION:The Charming Squire\, 3/133 Grey Street\, Brisbane\, Queensland\, 4101\, Australia
CATEGORIES:Queensland
ATTACH;FMTTYPE=image/webp:https://australiantunnellingsociety.com.au/wp-content/uploads/2022/10/iStock-1183586464.webp
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Australia/Brisbane:20221006T090000
DTEND;TZID=Australia/Brisbane:20221006T160000
DTSTAMP:20260430T021038
CREATED:20210216T062933Z
LAST-MODIFIED:20221005T230741Z
UID:15633-1665046800-1665072000@australiantunnellingsociety.com.au
SUMMARY:ATS QLD - One Day Workshop Showcase of Queensland Tunnel Projects
DESCRIPTION:The Queensland Branch of the Australian Tunnelling Society invites members and guests to join us for a one-day workshop showcase of tunnel projects in Queensland. This event will showcase a diverse collection of Queensland tunnelling projects: \n\nSmall to large scale\nRoad\, rail\, and utilities\nRange of technical solutions and commercial arrangements\n\nSpeakers\nArran McGhie\nKidston Pumped Storage Hydro Project—North Queensland \nPresentation: Arran will give us a detailed overview of this exciting green project being developed by Genex Power Limited\, focusing on the project’s configuration and construction. \nArran has more than 20 years experience in project delivery of large underground mine development and urban infrastructure projects\, in Australia and overseas including Malaysia\, Indonesia\, Singapore and Hong Kong.  Arran acquired a Bachelor of Engineering (Mining) from the University of Queensland in 1994 and Graduate Diploma of Applied Finance and Investment from the Australian Securities Institute in 1998. \n  \nPatrick Kidd\nPrincipal Engineering Manager\, ARTC on Inland Rail \nEngineering Manager\, Gowrie to Kagaru section of Inland Rail \nPresentation: Patrick will discuss the Gowrie to Kagaru Public Private Partnership with a focus on the three tunnels. \nAt its core\, Inland Rail is a 1\,700km rail line\, which will provide a fast freight backbone between Brisbane and Melbourne\, and connect into the east-west Trans-Australia line and many other regional lines in the country. \nPatrick is a Principal Engineering Manager at ARTC on Inland Rail and the Engineering Manager on the Gowrie to Kagaru section of Inland Rail. Patrick has over 28 years of experience in professional consulting and project and design management. Patrick has broad experience in the management of geotechnical\, geological and civil engineering throughout the entire project life cycle. He is focused on providing innovative\, cost-effective\, safe\, maintainable\, resilient infrastructure for his clients. He also is highly experienced in technical design review\, construction supervision and asset management. Patrick is a chartered professional engineer in civil and geotechnical engineering in Australia and the UK\, RPEQ and a Fellow with Engineers Australia. Patrick has been fortunate to have worked on many large-scale multidisciplinary projects for a wide variety of infrastructure in several countries and environments. \n  \nUlrike Pelz\nPresentation: Urlike will present the design of the precast tunnel segments for the running tunnels and other associated tunnel design works. \nUlrike is a Chartered Engineer and RPEQ\, currently working for GHD as Senior Technical Director\, Tunnels & Major Projects. Over the last 27 years\, Ulrike has gathered substantial experience working on major infrastructure tunnelling projects in Europe\, Asia and Australia. Her experience covers all aspects of project delivery including design\, design management and construction management. She has been fortunate to work with diverse teams in different cultures and is focussed on building good relationships with all parties to work together to achieve optimal solutions and project outcomes. \n  \n\nTai Luong\nCross River Rail—Brisbane \nPresentation: Currently the largest infrastructure project in Queensland\, Tai is the Stations and Development Delivery Manager for Tunnels and will present an overview of the planning and construction of the Woolloongabba station as well as the delivery of the 5.9km twin tunnels from Boggo Road to Normanby. \nPrior to joining the Cross River Rail Delivery Authority in 2018\, Tai has gained more than 25 years of experience in the design and construction of major infrastructure projects\, both locally and internationally. \n  \nRoger Ness-Wilson\nKings Engineering \nPresentation: Roger discusses Kings Engineering approach to their work — quality\, timely and cost effective roadheader rebuilds to support major tunnelling projects. \nRoger is the Operations Manager at Kings Engineering\, a leading NSW Engineering business that works in tunnelling and infrastructure\, along with other sectors. He has more than 20 years of experience in mining\, transport and major infrastructure projects. \n  \nHarry Asche\nBrisbane Rail Tunnels and S1 Sewer \nPresentation: 2022 marks thirty years since the construction of the Brisbane Rail Tunnels commenced\, and twenty years since the construction of the S1 Sewer was completed. The presentation will describe some of the tunnelling details of both projects. The Brisbane Rail Tunnels were the first major tunnels in Brisbane for many years\, the first use of roadheader technology in Brisbane\, and they kick-started the tunnelling work which has followed. The S1 tunnel was one of the projects which followed and was the longest TBM drive in Brisbane until CRR. The S1 project overcame some significant challenges in its construction. The presentation will also reflect on improvements to technology since. \nHarry Asche is the President of the ATS and the Design Director – Tunnels at Aurecon. He was closely involved in\, and learned so much from\, both projects. \n  \nAndrew Scarr\, Thierry Candito\, Felipe Villafrade\, Stephen Harding\nBreakfast Creek Trunk Sewer Augmentation Project – Brisbane \nPresentation: The Breakfast Creek Trunk Sewer has a sagged section where it passes under the Inner-City Bypass (ICB) and Airport Link on-ramp. This sagged section of sewer has an unclearable blockage and is at risk of collapse. The section consists a 98-year-old unreinforced concrete pipe\, which due to poor ground conditions\, has experienced a vertical settlement in the alignment. Urban Utilities proposes to construct a 1050 metre long OD2150 sewer main between Perry Park\, Bowen Hills and Lutwyche Road\, Windsor using micro-tunnelling trenchless technology. \nAndrew has more than 20 years’ experience in the water and wastewater industry as a seasoned Senior Project Manager who has progress to Construction Manager in recent years.  His intimate knowledge of trenchless techniques\, and his extensive experience with water and waste water infrastructure construction from the front end to hands-on management of procedures and process improvement has allowed him to successfully deliver increasingly complex utility infrastructure projects including construction of gravity and pressure sewer mains\, various civil structures (including deep shafts and concrete caissons) throughout Australia. As Construction Manager\, Andrew provides ongoing and consistent guidance to his construction teams to ensure the success of multiple projects. Andrew has strong technical capability covering many areas of civil construction including but not limited to conventional open trench excavation\, trenchless tunnelling methods such as micro-tunnelling\, deep shaft excavation\, construction of concrete structures and caissons as well as detailed mechanical and electrical work for water and wastewater infrastructure. \nThierry has more than 20 years’ experience in the tunnelling industry leading technically complex engineering projects. His expertise of mechanised excavation using tunnel boring machine and his experience of tunnel construction has allowed him to successfully deliver technically challenging projects. Starting his career as a Plant Engineering in Hong Kong on the KCRC Lok Ma Chau rail line in 2002\, he has since contributed to high profile tunnel projects within Australia and New Zealand. These includes the Brisbane Clem 7 project\, the Brisbane Legacy Way project\, the Perth Forrestfield Airport Link project\, the Auckland Waterview Connection project and more recently the Brisbane Cross River Rail project as the Underground Tunnel Plant Manager. Thierry’s passion for tunnelling and project management has now led him to the next stage of his career in project managing tunnel construction from the design phase through to construction and delivery. \nFelipe is Fulton Hogan Utilities’ Project Manager for the Breakfast Creek Trunk Sewer augmentation project; Felipe has 14 years of experience delivering projects in Australia and over the last 2 years he has been working under the Urban Utilities Wastewater Metropolitan and Metropolitan Treatment Plants programs. \nStephen is Urban Utilities’ Project Manager for the Breakfast Creek Trunk Sewer Augmentation Project who has over 20 years’ experience as a Project Manager with 10 years at Urban Utilities delivering wastewater projects with a number of trenchless projects successfully completed throughout Brisbane. \n  \nColin Ginger General Manager Precast Concrete Group\nPresentation: Case study on the manufacture of 21\,000 tunnel segments for the Gold Coast Desalination Tunnels. The presentation will cover the process from shop drawings\, building moulds\, concrete mix design\, casting\, curing\, gasket fit\, storage\, delivery and installation. \nSponsor
URL:https://australiantunnellingsociety.com.au/ats-event/ats-qld-one-day-workshop-showcase-of-queensland-tunnel-projects/
LOCATION:QLD
CATEGORIES:Queensland
ATTACH;FMTTYPE=image/jpeg:https://australiantunnellingsociety.com.au/wp-content/uploads/2021/02/CP-CPT0-2017-08-22-PB01-scaled-e1626051515331.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Australia/Sydney:20220615T170000
DTEND;TZID=Australia/Sydney:20220615T200000
DTSTAMP:20260430T021038
CREATED:20220606T021059Z
LAST-MODIFIED:20220606T021059Z
UID:17009-1655312400-1655323200@australiantunnellingsociety.com.au
SUMMARY:BrisBIM Gathering – June 2022
DESCRIPTION:Dear ATS members \nThe BrisBIM group is hosting a live event in Brisbane about infrastructure and assessment management. \n  \n\nCatch up for some beers and talk about BIM. Get some new insights from leading BIM presenters. \n\n\nAbout this event\n\n\n\nArrive from 5:00pm \n5:30pm – Event Start – Introductions & Announcements \n5:40pm – Sponsor Address \n5:45pm – BIM Advances in Transport and Main Roads – (Bryan A McSweeney\, TMR) \n6:05pm – Inland Rail: Project Delivery and the Tyranny of Distance– (Matthew Freeburn\, ARTC) \n6:25pm – Capturing of in-tunnel condition data in Transurban Queensland– (Evan Lo\, Transurban) \n6:45pm – Q & A with the speakers \n7:00pm – Presentation Completion\, networking\, beers and food. \n8:00pm – Event Close \nAs usual this is a free event! \nSponsored by
URL:https://australiantunnellingsociety.com.au/ats-event/brisbim-gathering-june-2022/
LOCATION:QUT Kindler Theatre\, 2 George Street\, Gardens Point Campus\, Brisbane\, QLD\, 4000\, Australia
CATEGORIES:Queensland
ATTACH;FMTTYPE=image/webp:https://australiantunnellingsociety.com.au/wp-content/uploads/2022/06/https___cdn.evbuc_.com_images_295014999_187445531738_1_original.webp
END:VEVENT
END:VCALENDAR