BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Australian Tunnelling Society - ECPv6.16.4.1//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-ORIGINAL-URL:https://australiantunnellingsociety.com.au
X-WR-CALDESC:Events for Australian Tunnelling Society
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:Australia/Sydney
BEGIN:STANDARD
TZOFFSETFROM:+1100
TZOFFSETTO:+1000
TZNAME:AEST
DTSTART:20210403T160000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1000
TZOFFSETTO:+1100
TZNAME:AEDT
DTSTART:20211002T160000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1100
TZOFFSETTO:+1000
TZNAME:AEST
DTSTART:20220402T160000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1000
TZOFFSETTO:+1100
TZNAME:AEDT
DTSTART:20221001T160000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1100
TZOFFSETTO:+1000
TZNAME:AEST
DTSTART:20230401T160000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1000
TZOFFSETTO:+1100
TZNAME:AEDT
DTSTART:20230930T160000
END:DAYLIGHT
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=Australia/Sydney:20220324T180000
DTEND;TZID=Australia/Sydney:20220324T180000
DTSTAMP:20220130T215722Z
CREATED:20211207T041624Z
LAST-MODIFIED:20220130T215722Z
UID:16618-1648144800-1648144800@australiantunnellingsociety.com.au
SUMMARY:Management and maintenance of challenging tunnel sewer cleans
DESCRIPTION:In-person (Brisbane) and online \nWhilst the glamourous rail and road tunnels are visible and exciting to the public in the modern era with ample space to perform maintenance activities\, the forgotten world of utility tunnels are just as important in keeping our societies operating since the first millennium BCE. \nUtility tunnels are smaller than their larger transport cousins\, and with the added issue of noxious gas environments makes maintaining these tunnels inherently more difficult. Veolia undertakes routine maintenance activities on drainage networks including sewer tunnels. It is important to share the challenges faced with the management\, and maintenance of these tunnels after construction is completed. \nSpeaker\nLee Gnezdiloff  \nLee is currently a Project Manager for Veolia Network Services delivering challenging and complex maintenance projects within SEQ. With more than 20 years’ experience in the water and construction industry and as an RPEQ since 2007 he has been the engineer responsible for conveyance network designs from concept through to IFC drawing packages. \nAs a project manager\, Lee has managed teams to deliver network pipelines and pumping infrastructure\, and supporting infrastructure including civil buildings and structures\, dams (raw and tailings)\, creek diversions\, roads both flexible and rigid\, and bridges and culverts across various locations in Queensland. Lee has worked for various private and public clients\, specialising as a superintendent’s representative under the contract for conveyance networks and civil infrastructure construction projects for the past 10 years. \nEvent overview\nArrival and registration: 5.30pm – 6.00 pm AEST\nWebinar / presentation: 6.00pm – 7.00 pm AEST\nNetworking: 7.00pm – 7.30pm AEST
URL:https://australiantunnellingsociety.com.au/ats-event/management-and-maintenance-of-challenging-tunnel-sewer-cleans/
LOCATION:Brisbane
CATEGORIES:Queensland,Webinar
ATTACH;FMTTYPE=image/jpeg:https://australiantunnellingsociety.com.au/wp-content/uploads/2021/12/Feb-event-EA.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Australia/Sydney:20220331T173000
DTEND;TZID=Australia/Sydney:20220331T190000
DTSTAMP:20220321T035035Z
CREATED:20220317T052749Z
LAST-MODIFIED:20220321T035035Z
UID:16855-1648747800-1648753200@australiantunnellingsociety.com.au
SUMMARY:Tunnel systems: three decades of Australian tunnel systems operation stall and axial fan parallel operation
DESCRIPTION:This event will be held online and in-person (Sydney\, Melbourne\, Brisbane). \nPresentation outline\nThis is the first technical session of the ATS Tunnel Systems Group. This technical session will be in three parts. \nPART 1\nThree Decades of Australian Tunnel Systems Operation Bob Allen\, General Manager Sydney Harbour Tunnel. Bob’s 30 years operating then managing SHT means that he has had a hand in almost the complete lifecycle of a tunnel\, missing only tunnel decommissioning. His insights on maintenance\, systems upgrading\, and process improvement are built over three major systems upgrade cycles\, understanding the approaches\, what is important and what works well. Through those 30 years\, societal approaches to safety have also moved on\, and SHT has been a leader in the change in tunnel operations\, driven in no small part by Bob. \nBob will lead us through some of the changes that have been made to SHT in tunnel systems\, operations\, and operational safety\, drawing lessons where applicable for road tunnels more generally. \nPART 2 \nLee Brown will discuss Stall & Axial Fan Parallel Operation. Lee has been to be involved with the majority of major Australian and New Zealand Road and Metro Tunnel infrastructure projects. Directly involved with the design and supply of Jet & Axial Fans\, Fire Dampers and Sound Attenuation. \nPART 3 \nThe technical session will Finish with an Update from Conrad Stacey on the AS4825 work of ATS the update of the Tunnel Fire Design Standard \nLocation\nThis event will be held in multiple locations: \n\nSydney: Aurecon Office\, Level 5\, 116 Military Road\, Neutral Bay\, NSW\nArrival and registration 5.00pm AEDT\nBrisbane: Stacey Agnew Office\, Unit 4\, 35 Limestone Street\, Darra\, QLD\nArrival and registration 4.00pm AEST\nMelbourne: Engineers Australia\, Level 31\, 600 Bourke Street\, Melbourne VIC\nArrival and registration 5.00pm AEDT\n\nImportant note: CPD records cannot be automatically recorded for this event and will need to be recorded by participants. \nSpeakers\nBob Allen\nGeneral Manager Sydney Harbour Tunnel\nBob started as a tunnel controller three months prior to the opening of Sydney Harbour Tunnel in August 1992\, becoming Operations Manager in August 1993. At the end of the concession period in August 2022\, Bob will finish up with the Sydney Harbour Tunnel Company\, having spent the last 23 years as its General Manager. Bob’s leadership within the tunnel community was instrumental in starting the Australian Tunnel Operators Group and in formalising training and qualification of tunnel operators. Bob’s initiatives on tunnel operations and safety come up in many conversations in the tunnel community\, with his philosophies and knowledge on tunnel operation and safety recognised internationally. \nLee Brown\nTunnel & Metro – Business Manager\nInvolved with ventilation for nearly 25 years\, with companies Fan Systems UK\, Witt & Sohn Germany\, Fantech Australia and more recently as Director of TROX Australia. Since moving to Australia\, Lee has been to be involved with the majority of major Australian and New Zealand Road and Metro Tunnel infrastructure projects. He is directly involved with the design and supply of Jet & Axial Fans\, Fire Dampers and Sound Attenuation\, with his first project being the Auckland Waterview Tunnel supplying the complete ventilation solution of Jet Fans\, Axial Fans\, Fire Dampers\, Sound Attenuation and transition ducts. \nConrad Stacey\nDirector Stacey Agnew\nConrad is the director of Stacey Agnew experienced in Tunnel Fire life safety and ventilation. Conrad is leading the ATS AS4825 working group
URL:https://australiantunnellingsociety.com.au/ats-event/tunnel-systems-three-decades-of-australian-tunnel-systems-operation-stall-and-axial-fan-parallel-operation/
CATEGORIES:New South Wales,Online,Queensland,Victoria
ATTACH;FMTTYPE=image/jpeg:https://australiantunnellingsociety.com.au/wp-content/uploads/2022/03/Tunnel-systems.jpg
END:VEVENT
END:VCALENDAR