BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Australian Tunnelling Society - ECPv6.18.4//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Australian Tunnelling Society
X-ORIGINAL-URL:https://australiantunnellingsociety.com.au
X-WR-CALDESC:Events for Australian Tunnelling Society
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:Australia/Sydney
BEGIN:STANDARD
TZOFFSETFROM:+1100
TZOFFSETTO:+1000
TZNAME:AEST
DTSTART:20250405T160000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1000
TZOFFSETTO:+1100
TZNAME:AEDT
DTSTART:20251004T160000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1100
TZOFFSETTO:+1000
TZNAME:AEST
DTSTART:20260404T160000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1000
TZOFFSETTO:+1100
TZNAME:AEDT
DTSTART:20261003T160000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1100
TZOFFSETTO:+1000
TZNAME:AEST
DTSTART:20270403T160000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1000
TZOFFSETTO:+1100
TZNAME:AEDT
DTSTART:20271002T160000
END:DAYLIGHT
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=Australia/Sydney:20261110T173000
DTEND;TZID=Australia/Sydney:20261110T200000
DTSTAMP:20261030T031706Z
CREATED:20261030T021950Z
LAST-MODIFIED:20261030T031706Z
UID:399768-1794331800-1794340800@australiantunnellingsociety.com.au
SUMMARY:Precast lining in mined spur tunnels on Sydney Metro West: WTP
DESCRIPTION:Overview\nThe Gamuda Laing O’Rourke consortium on the Western Tunnelling Package of Sydney Metro West adopted an innovative precast lining solution for two spur tunnels connecting the dive structure to the underground junction caverns at Clyde. The selection was influenced by the tunnel length\, tight alignment curves and the desire to achieve lining performance consistent with the mainline tunnels. \nThe mined horseshoe-shaped tunnels\, constructed with rock bolts and shotcrete primary support\, presented unique challenges for the design and installation of the permanent lining. To address these challenges\, a bespoke precast lining system and dedicated Lining Erection Machine (LEM) were developed in collaboration with Herrenknecht. \nThis presentation will examine the engineering rationale behind the design\, the development of the lining system\, construction methodology and lessons learned during project delivery. Attendees will gain practical insights into innovative tunnelling solutions\, underground construction challenges and the implementation of large-scale infrastructure projects. \nThis event is produced by the Australian Tunnelling Society. \nWho should attend?\nSuited to all engineers with an interest in tunnelling from graduates to principals. Students are also encouraged to attend. \nLearning Outcomes\nIn this presentation\, you will learn: \n\nHow precast lining systems can be applied in mined tunnel environments\nThe key design considerations\, constraints and risks associated with permanent tunnel linings\nHow specialised construction equipment\, including the Lining Erection Machine\, supported project delivery\nPractical lessons learned from planning\, construction and implementation on a major rail infrastructure project\n\nProgram\nIn-person: \n5.30 pm AEDT – Registrations open \n6.00 pm AEDT – Presentation commences \n7.00 pm AEDT – Presentation concludes \n7.05 pm AEDT – Networking and drinks \n8.00 pm AEDT- Event concludes \nOnline: \n6.00 pm AEDT – Presentation commences \n7.00 pm AEDT – Presentation concludes \n8.00 pm AEDT- Event concludes \nAbout the speakers\n\n\n\nJeremy Nethercott MIEAust CPEng NER APEC Engineer IntPE(Aus)\nGamuda Australia\n\nJeremy Nethercott is an experienced Project Manager with nearly 20 years’ experience in the delivery of major tunnelling\, civil\, and rail infrastructure projects across Australia and Europe. Most recently\, Jeremy successfully delivered the mined tunnels and associated works for Gamuda on the Sydney Metro Western Tunnelling Package\, with overall responsibility for safety\, program\, cost\, quality and environmental performance. His expertise encompasses complex underground construction\, major civil structures\, innovative tunnelling methodologies\, multidisciplinary coordination\, stakeholder management and the delivery of projects within highly constrained environments. Jeremy has also held key roles across other major projects including Sydney Metro\, WestConnex\, M6 Motorway and Fehmarnbelt Fixed Link. \n\n\n\n\n\n\nAmmar Miryazee MIEAust CPEng (Civil & Geotech) NER APAC\nGHD\n\nAmmar Mirzayee is a Technical Director and Chartered Professional Engineer with 16 years of experience in geotechnical and structural engineering\, specialising in mined and TBM tunnels\, underground structures\, tunnel linings and construction-phase services. He currently serves as Design Discipline Lead and Tunnels Construction Phase Services Area Lead for the Sydney Metro West Western Tunnelling Package. Ammar has contributed to major transport infrastructure projects in Australia and internationally\, with particular expertise in rock mechanics\, reinforced concrete design\, ground-structure interaction and advanced numerical modelling. \n\n\n\n\nSponsors\nHuge thanks to our event sponsors:
URL:https://australiantunnellingsociety.com.au/ats-event/precast-lining-in-mined-spur-tunnels-on-sydney-metro-west-wtp/
LOCATION:Mezzanine Floor\, 44 Market Street\, Sydney\, 2000
CATEGORIES:Hybrid,New South Wales,Online,Webinar
ATTACH;FMTTYPE=image/png:https://australiantunnellingsociety.com.au/wp-content/uploads/2026/10/Screenshot-2026-10-30-131812-e1793326763594.png
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Australia/Sydney:20261119T173000
DTEND;TZID=Australia/Sydney:20261119T200000
DTSTAMP:20261022T045333Z
CREATED:20261022T044927Z
LAST-MODIFIED:20261022T045333Z
UID:391060-1795109400-1795118400@australiantunnellingsociety.com.au
SUMMARY:Client’s Perspective on Bids with Tim Parker
DESCRIPTION:Event Overview\nThe Australian Tunnelling Society Young Members invites you to join Tim Parker\, Chief Executive Officer of the High Speed Rail Authority\, for an engaging discussion exploring the client’s perspective on bids\, as well as the development and delivery of major infrastructure projects. \nDrawing on more than 30 years of experience across Australia and Asia\, including involvement in some of the region’s most significant and complex megaprojects\, Tim will open the evening with a presentation titled Client’s Perspective on Bids. This will be followed by a moderated discussion and audience Q&A\, offering attendees the opportunity to hear his experiences\, perspectives and lessons from a career at the forefront of major transport and infrastructure delivery. \nFor professionals working across transport and infrastructure\, this is a rare opportunity to hear directly from one of Australia’s most experienced infrastructure leaders and gain first-hand insights into bids from the client’s perspective\, alongside broader considerations in developing and delivering major infrastructure projects. \nPlaces are strictly limited to 80 attendees\, with 40 places reserved for young members (35 years of age or under). Early registration is strongly encouraged to avoid disappointment. \nThis is a free\, in-person-only event\, and registration is essential. \n  \nEvent Program\n\n5:30 PM AEDT: Registration opens\n6:00 PM AEDT: Presentation commences\n6:30 PM AEDT: Moderated discussion and audience Q&A\n7:15 PM AEDT: Networking\n8:00 PM AEDT: Event concludes\n\n  \nAbout the Speaker\n \nTim Parker \nChief Executive Officer\, High Speed Rail Authority \nTim Parker is the Chief Executive Officer of the Australian Government’s High Speed Rail Authority responsible for leading the development of a national high speed rail network in Australia. \nWith more than 30 years of experience in mega projects in Asia and Australia\, Tim brings to the role extensive leadership and project experience in developing and delivering complex infrastructure projects. \nTim was previously Head of Delivery for Australia’s biggest public transport project\, Sydney Metro\, from 2018 to 2024. In this role he provided leadership\, strategy and governance across a portfolio of innovative automated metro rail projects\, covering front-end development\, delivery management\, contract negotiation and contract management with a total value of more than AU$50 billion. \nHis other notable mega project experience includes Hong Kong International Airport\, Epping to Chatswood Rail Link\, Sydney’s new convention centre at Darling Harbour and Sydney’s NorthConnex road tunnel. \n  \nEvent Moderator\n \nKeith Bannerman \nDirector Tunnels\, SYSTRA ANZ\, ATS NSW Chapter Chairperson
URL:https://australiantunnellingsociety.com.au/ats-event/atsym-beyond-the-blueprint-clients-perspective-on-bids-with-tim-parker/
LOCATION:Aecom Office\, Level 21\, 420 George Street\, Sydney\, NSW\, 2000\, Australia
CATEGORIES:New South Wales
ATTACH;FMTTYPE=image/png:https://australiantunnellingsociety.com.au/wp-content/uploads/2026/10/Leadership_Evening_Sessions_Banner_16x9_Tim-P-scaled.png
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Australia/Sydney:20261126T173000
DTEND;TZID=Australia/Sydney:20261126T200000
DTSTAMP:20261112T011638Z
CREATED:20261112T011035Z
LAST-MODIFIED:20261112T011638Z
UID:401554-1795714200-1795723200@australiantunnellingsociety.com.au
SUMMARY:ATS NSW AGM: Auckland City Rail Link - design and delivery insights
DESCRIPTION:Overview\nIn June 2026\, Link Alliance and City Rail Link Limited achieved practical completion of the City Rail Link (CRL) project\, handing over the completed infrastructure to Auckland Transport and KiwiRail for operations. The CRL was officially opened on 11 September 2026\, with passenger services commencing on 13 September 2026. \nThe City Rail Link is New Zealand’s largest transport infrastructure project and has transformed Auckland’s rail network by converting Britomart (Waitematā Station) from a terminus into a through-station\, significantly improving network capacity\, connectivity\, and travel times. \nThe project includes: \n\nTwin 3.45 km rail tunnels constructed up to 42 m below ground between Waitematā and Maungawhau Stations.\n Two new underground stations: Te Waihorotiu Station in midtown Auckland and Karanga-a-Hape Station\, with entrances at Mercury Lane and Beresford Square.\nRedevelopment of Waitematā Station into a two-way through station.\nRedevelopment of Maungawhau Station\, including the new CRL connection and a modern station building.\nWider rail network upgrades\, including improvements at The Strand\, Ōtāhuhu\, Henderson\, and Newmarket.\nProvision for longer nine-car electric trains.\nCreation of enhanced public spaces and improved urban amenity throughout the city centre.\nAll the railway and station systems\, testing and commissioning.\n\nJoin us for an insightful presentation covering both the design and construction of this landmark underground rail project.  Industry experts from AECOM and Vinci Construction Grands Projets will share the key technical challenges\, innovations\, lessons learned\, and success stories that contributed to the delivery of one of New Zealand’s most significant tunnelling and infrastructure projects. \nThis session will conclude with a Q&A discussion\, providing attendees with the opportunity to engage directly with project leaders involved in the design and construction of the CRL. \nIn addition to the technical presentation\, this event will include the Australian Tunnelling Society (ATS) NSW Chapter Annual General Meeting\, where members will reflect on the chapter’s activities throughout 2026 and discuss priorities and plans for 2027. \nThis event is produced by Australian Tunneling Society. \nWho should attend?\nThis is suited to engineers interested in the design of tunnels and delivery of major underground infrastructure projects. \nLearning outcomes\nIn this presentation\, you will learn: \n\nHow key geotechnical\, structural and construction challenges were identified and addressed during delivery of the City Rail Link.\nHow multidisciplinary design and construction teams integrated technical requirements across a complex underground rail project.\nHow tunnelling and construction methodologies were applied to minimise impacts within a dense urban environment.\nHow lessons learned from the City Rail Link can inform future tunnelling and underground infrastructure projects.\n\nProgram\nIn-person: \n5.30 pm AEDT – Welcome \n6.00 pm AEDT – ATS NSW Annual General Meeting Presentation \n6.10 pm AEDT – Technical Presentation \n7.00 pm AEDT – Q&A \n7.15 pm AEDT – Networking \n8.00 pm AEDT- Event concludes \nSpeakers\n\n\n\nFrancois Dudouit\nProject Director\, Vinci Construction Grands Projets\n\nFrancois is a Project Director with VINCI Construction Grands Projets\, bringing more than 40 years of international construction experience\, primarily in the delivery of major underground rail infrastructure projects. His career spans major projects in France (Villejust Tunnels)\, Denmark (Storebælt Fixed Link)\, Hong Kong\, the Netherlands (Betuweroute)\, Sweden\, and New Zealand. Between 2003 and 2018\, Francois held senior leadership roles on complex tunnelling projects. He was initially responsible for construction delivery on the Hallandsås Tunnel Project in Sweden\, before leading the SCL1103 and SCL1122 contracts for the Shatin to Central Link\, a major extension of Hong Kong’s MTR network. Then he served as Project Director for the Link Alliance\, delivering the turnkey Auckland’s City Rail Link.\n\n\n\n\n\n\n\n\n\nGeoff Charlesworth\nIndustry Director – Ground Engineering & Tunnelling\, AECOM Australia\n\nGeoff has over forty years of experience in mining and civil engineering in Australasia\, Africa\, Europe\, Asia\, North America and the Middle East. He is AECOM’s ANZ Technical Practice Leader for Tunnels\, and has successfully completed leadership and design roles for schemes involving metro-rail\, high-speed rail\, highway\, water conveyance\, cable tunnels\, pumped storage\, mining infrastructure\, bridges and building works. \n  \n\n\n\n\n\n\nArun Sarathchandran\nPrincipal Technical Engineer – Ground Engineering & Tunnelling\, AECOM Australia\n\nArun is a Geotechnical and Tunnel Engineer with over 16 years of experience in tunnel design\, numerical modelling\, geotechnical analysis\, and construction support. He has worked on major tunnelling and infrastructure projects in Sydney and internationally\, specialising in tunnel support design and underground works. He is an expert user of Plaxis and Rocscience packages to develop tunnel support design solutions. \n\nSponsor
URL:https://australiantunnellingsociety.com.au/ats-event/ats-nsw-agm-auckland-city-rail-link-design-and-delivery-insights/
LOCATION:Mezzanine Floor\, 44 Market Street\, Sydney\, 2000
CATEGORIES:New South Wales
ATTACH;FMTTYPE=image/png:https://australiantunnellingsociety.com.au/wp-content/uploads/2026/11/Screenshot-2026-03-31-141031-e1794445772138.png
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Australia/Sydney:20261202T173000
DTEND;TZID=Australia/Sydney:20261202T200000
DTSTAMP:20261116T053613Z
CREATED:20261023T032925Z
LAST-MODIFIED:20261116T053613Z
UID:393839-1796232600-1796241600@australiantunnellingsociety.com.au
SUMMARY:Engineering Judgment in Practice: Defining and Delivering “Good Enough”
DESCRIPTION:The ATS Mentor Alliance’s next Learning and Development Forum will be hosting a panel discussion with senior leaders from major projects in Sydney over the last decade to explore the topic of “good enough” – how to deliver a solution to achieve project objectives\, without chasing perfection. \nEvent overview \nThrough real experiences across the various stages of a project’s lifecycle\, the panellists will share practical lessons on balancing cost\, time\, and quality\, managing client expectations\, refining scope\, and focusing effort where it adds the most value. \nAttendees will gain insights into one the most important skills for engineers at any stage of their career – how to apply engineering judgment. We will explore how different stakeholders\, from clients and designers to independent certifiers and contractors\, approach decision-making and define project success. The discussion will highlight how contract models\, project constraints\, and risk management influence outcomes. \nMost importantly\, participants will hear firsthand examples of how effective communication can prevent issues\, align expectations\, and create opportunities for better project outcomes. The key takeaway is simple: communicate early and often. Success comes from understanding constraints\, having the right conversations at the right time\, and working collaboratively to deliver what the client needs\, no more and no less. \nWho should come? \nThe L&D Forum will be open to all ATS and NZTS members. This will be a hybrid event\, in person in Sydney and online for everyone else. \nSpeakers \n \nPhil Clark \nPrincipal Asset Engineer at Transurban \nPhil Clark is a professional engineer with more than 30 years multinational experience as a geotechnical consultant\, technical advisor for a major mining company and a tunnelling subject matter expert and former technical director for Transport for New South Wales. Whilst working as a consultant with PSM\, Phil worked on many of Sydney’s major tunnelling projects\, including the Eastern Distributor\, Cross City Tunnel\, Epping to Chatswood Rail Link and Lane Cove Tunnel. This background provides a unique skill set that delivers practical and innovative design solutions and balanced advice for major civil infrastructure. \n \nJohn Milner \nIndependent Certifier Construction Manager at Bureau Veritas \nOver 45 years experience mining\, heavy construction and verification in roles such as Senior Construction Manager\, Independent Certifier’s Representative\, General Mine Manager and Mining Engineer. John has experience in all forms of tunnelling including all types of TBM’s\, road headers\, drill and blast\, shaft sinking\, canopy tubes\, soft ground\, micro tunnelling and all facets of opencut and underground coal mining. \n \nTom Roper \nEngineering Manager at Acciona \nDr. Thomas Roper CPEng MIEAust is an Engineering Manager at Acciona with 15 years of experience spanning underground mining\, design\, and mega-infrastructure delivery. Holding a PhD from the University of Queensland focused on the Observational Method and decision economics in tunnelling\, Tom brings a balanced perspective across academia\, contracting\, and design. \n \nPatricia Kaziro \nDirector and Founder at Kaziro Group \nPatricia Kaziro is the Founder and Director of Global Learning Solutions at Kaziro Group. Based in Australia with global reach\, Kaziro Group helps organisations build workforce capability through innovative learning solutions across the healthcare\, engineering\, defence and sports industries. Patricia’s expertise in leadership development\, career transition\, organisational change and learning design is informed by a multinational career as an executive coach\, educator and keynote speaker.
URL:https://australiantunnellingsociety.com.au/ats-event/engineering-judgment-in-practice-defining-and-delivering-good-enough/
LOCATION:Webinar and IN PERSON at SMEC in Sydney\, Level 7\, 40 Mount Street\, North Sydney\, NSW\, 2060\, Australia
CATEGORIES:New South Wales,Online
ATTACH;FMTTYPE=image/png:https://australiantunnellingsociety.com.au/wp-content/uploads/2025/12/LD-5-e1792726139122.png
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Australia/Sydney:20261204T180000
DTEND;TZID=Australia/Sydney:20261204T213000
DTSTAMP:20261016T032036Z
CREATED:20261016T031925Z
LAST-MODIFIED:20261016T032036Z
UID:388110-1796407200-1796419800@australiantunnellingsociety.com.au
SUMMARY:ATS NSW - Join the Feast of St Barbara
DESCRIPTION:Join ATS NSW for their Feast of St Barbara end of year social event! \nA social get together from 6pm. All ATS members welcome. Celebrate St Barbara’s day and catch up with your peers. \nThe event will be held at the Greenwood Plaza Rooftop in North Sydney. \nIf you’re interested in attending\, please email david.clague@bekaert.com 
URL:https://australiantunnellingsociety.com.au/ats-event/ats-nsw-join-the-feast-of-st-barbara/
LOCATION:The Greenwood Plaza Rooftop\, 36 Blue Street\, North Sydney\, NSW\, 2060
CATEGORIES:New South Wales
ATTACH;FMTTYPE=image/jpeg:https://australiantunnellingsociety.com.au/wp-content/uploads/2026/10/20241129_085705-scaled-e1791776011478.jpg
END:VEVENT
END:VCALENDAR