BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Australian Tunnelling Society - ECPv6.18.4//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Australian Tunnelling Society
X-ORIGINAL-URL:https://australiantunnellingsociety.com.au
X-WR-CALDESC:Events for Australian Tunnelling Society
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:Australia/Sydney
BEGIN:STANDARD
TZOFFSETFROM:+1100
TZOFFSETTO:+1000
TZNAME:AEST
DTSTART:20250405T160000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1000
TZOFFSETTO:+1100
TZNAME:AEDT
DTSTART:20251004T160000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1100
TZOFFSETTO:+1000
TZNAME:AEST
DTSTART:20260404T160000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1000
TZOFFSETTO:+1100
TZNAME:AEDT
DTSTART:20261003T160000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1100
TZOFFSETTO:+1000
TZNAME:AEST
DTSTART:20270403T160000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1000
TZOFFSETTO:+1100
TZNAME:AEDT
DTSTART:20271002T160000
END:DAYLIGHT
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=Australia/Sydney:20261119T173000
DTEND;TZID=Australia/Sydney:20261119T200000
DTSTAMP:20261022T045333Z
CREATED:20261022T044927Z
LAST-MODIFIED:20261022T045333Z
UID:391060-1795109400-1795118400@australiantunnellingsociety.com.au
SUMMARY:Client’s Perspective on Bids with Tim Parker
DESCRIPTION:Event Overview\nThe Australian Tunnelling Society Young Members invites you to join Tim Parker\, Chief Executive Officer of the High Speed Rail Authority\, for an engaging discussion exploring the client’s perspective on bids\, as well as the development and delivery of major infrastructure projects. \nDrawing on more than 30 years of experience across Australia and Asia\, including involvement in some of the region’s most significant and complex megaprojects\, Tim will open the evening with a presentation titled Client’s Perspective on Bids. This will be followed by a moderated discussion and audience Q&A\, offering attendees the opportunity to hear his experiences\, perspectives and lessons from a career at the forefront of major transport and infrastructure delivery. \nFor professionals working across transport and infrastructure\, this is a rare opportunity to hear directly from one of Australia’s most experienced infrastructure leaders and gain first-hand insights into bids from the client’s perspective\, alongside broader considerations in developing and delivering major infrastructure projects. \nPlaces are strictly limited to 80 attendees\, with 40 places reserved for young members (35 years of age or under). Early registration is strongly encouraged to avoid disappointment. \nThis is a free\, in-person-only event\, and registration is essential. \n  \nEvent Program\n\n5:30 PM AEDT: Registration opens\n6:00 PM AEDT: Presentation commences\n6:30 PM AEDT: Moderated discussion and audience Q&A\n7:15 PM AEDT: Networking\n8:00 PM AEDT: Event concludes\n\n  \nAbout the Speaker\n \nTim Parker \nChief Executive Officer\, High Speed Rail Authority \nTim Parker is the Chief Executive Officer of the Australian Government’s High Speed Rail Authority responsible for leading the development of a national high speed rail network in Australia. \nWith more than 30 years of experience in mega projects in Asia and Australia\, Tim brings to the role extensive leadership and project experience in developing and delivering complex infrastructure projects. \nTim was previously Head of Delivery for Australia’s biggest public transport project\, Sydney Metro\, from 2018 to 2024. In this role he provided leadership\, strategy and governance across a portfolio of innovative automated metro rail projects\, covering front-end development\, delivery management\, contract negotiation and contract management with a total value of more than AU$50 billion. \nHis other notable mega project experience includes Hong Kong International Airport\, Epping to Chatswood Rail Link\, Sydney’s new convention centre at Darling Harbour and Sydney’s NorthConnex road tunnel. \n  \nEvent Moderator\n \nKeith Bannerman \nDirector Tunnels\, SYSTRA ANZ\, ATS NSW Chapter Chairperson
URL:https://australiantunnellingsociety.com.au/ats-event/atsym-beyond-the-blueprint-clients-perspective-on-bids-with-tim-parker/
LOCATION:Aecom Office\, Level 21\, 420 George Street\, Sydney\, NSW\, 2000\, Australia
CATEGORIES:New South Wales
ATTACH;FMTTYPE=image/png:https://australiantunnellingsociety.com.au/wp-content/uploads/2026/10/Leadership_Evening_Sessions_Banner_16x9_Tim-P-scaled.png
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Australia/Sydney:20261126T173000
DTEND;TZID=Australia/Sydney:20261126T200000
DTSTAMP:20261112T011638Z
CREATED:20261112T011035Z
LAST-MODIFIED:20261112T011638Z
UID:401554-1795714200-1795723200@australiantunnellingsociety.com.au
SUMMARY:ATS NSW AGM: Auckland City Rail Link - design and delivery insights
DESCRIPTION:Overview\nIn June 2026\, Link Alliance and City Rail Link Limited achieved practical completion of the City Rail Link (CRL) project\, handing over the completed infrastructure to Auckland Transport and KiwiRail for operations. The CRL was officially opened on 11 September 2026\, with passenger services commencing on 13 September 2026. \nThe City Rail Link is New Zealand’s largest transport infrastructure project and has transformed Auckland’s rail network by converting Britomart (Waitematā Station) from a terminus into a through-station\, significantly improving network capacity\, connectivity\, and travel times. \nThe project includes: \n\nTwin 3.45 km rail tunnels constructed up to 42 m below ground between Waitematā and Maungawhau Stations.\n Two new underground stations: Te Waihorotiu Station in midtown Auckland and Karanga-a-Hape Station\, with entrances at Mercury Lane and Beresford Square.\nRedevelopment of Waitematā Station into a two-way through station.\nRedevelopment of Maungawhau Station\, including the new CRL connection and a modern station building.\nWider rail network upgrades\, including improvements at The Strand\, Ōtāhuhu\, Henderson\, and Newmarket.\nProvision for longer nine-car electric trains.\nCreation of enhanced public spaces and improved urban amenity throughout the city centre.\nAll the railway and station systems\, testing and commissioning.\n\nJoin us for an insightful presentation covering both the design and construction of this landmark underground rail project.  Industry experts from AECOM and Vinci Construction Grands Projets will share the key technical challenges\, innovations\, lessons learned\, and success stories that contributed to the delivery of one of New Zealand’s most significant tunnelling and infrastructure projects. \nThis session will conclude with a Q&A discussion\, providing attendees with the opportunity to engage directly with project leaders involved in the design and construction of the CRL. \nIn addition to the technical presentation\, this event will include the Australian Tunnelling Society (ATS) NSW Chapter Annual General Meeting\, where members will reflect on the chapter’s activities throughout 2026 and discuss priorities and plans for 2027. \nThis event is produced by Australian Tunneling Society. \nWho should attend?\nThis is suited to engineers interested in the design of tunnels and delivery of major underground infrastructure projects. \nLearning outcomes\nIn this presentation\, you will learn: \n\nHow key geotechnical\, structural and construction challenges were identified and addressed during delivery of the City Rail Link.\nHow multidisciplinary design and construction teams integrated technical requirements across a complex underground rail project.\nHow tunnelling and construction methodologies were applied to minimise impacts within a dense urban environment.\nHow lessons learned from the City Rail Link can inform future tunnelling and underground infrastructure projects.\n\nProgram\nIn-person: \n5.30 pm AEDT – Welcome \n6.00 pm AEDT – ATS NSW Annual General Meeting Presentation \n6.10 pm AEDT – Technical Presentation \n7.00 pm AEDT – Q&A \n7.15 pm AEDT – Networking \n8.00 pm AEDT- Event concludes \nSpeakers\n\n\n\nFrancois Dudouit\nProject Director\, Vinci Construction Grands Projets\n\nFrancois is a Project Director with VINCI Construction Grands Projets\, bringing more than 40 years of international construction experience\, primarily in the delivery of major underground rail infrastructure projects. His career spans major projects in France (Villejust Tunnels)\, Denmark (Storebælt Fixed Link)\, Hong Kong\, the Netherlands (Betuweroute)\, Sweden\, and New Zealand. Between 2003 and 2018\, Francois held senior leadership roles on complex tunnelling projects. He was initially responsible for construction delivery on the Hallandsås Tunnel Project in Sweden\, before leading the SCL1103 and SCL1122 contracts for the Shatin to Central Link\, a major extension of Hong Kong’s MTR network. Then he served as Project Director for the Link Alliance\, delivering the turnkey Auckland’s City Rail Link.\n\n\n\n\n\n\n\n\n\nGeoff Charlesworth\nIndustry Director – Ground Engineering & Tunnelling\, AECOM Australia\n\nGeoff has over forty years of experience in mining and civil engineering in Australasia\, Africa\, Europe\, Asia\, North America and the Middle East. He is AECOM’s ANZ Technical Practice Leader for Tunnels\, and has successfully completed leadership and design roles for schemes involving metro-rail\, high-speed rail\, highway\, water conveyance\, cable tunnels\, pumped storage\, mining infrastructure\, bridges and building works. \n  \n\n\n\n\n\n\nArun Sarathchandran\nPrincipal Technical Engineer – Ground Engineering & Tunnelling\, AECOM Australia\n\nArun is a Geotechnical and Tunnel Engineer with over 16 years of experience in tunnel design\, numerical modelling\, geotechnical analysis\, and construction support. He has worked on major tunnelling and infrastructure projects in Sydney and internationally\, specialising in tunnel support design and underground works. He is an expert user of Plaxis and Rocscience packages to develop tunnel support design solutions. \n\nSponsor
URL:https://australiantunnellingsociety.com.au/ats-event/ats-nsw-agm-auckland-city-rail-link-design-and-delivery-insights/
LOCATION:Mezzanine Floor\, 44 Market Street\, Sydney\, 2000
CATEGORIES:New South Wales
ATTACH;FMTTYPE=image/png:https://australiantunnellingsociety.com.au/wp-content/uploads/2026/11/Screenshot-2026-03-31-141031-e1794445772138.png
END:VEVENT
END:VCALENDAR