BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Australian Tunnelling Society - ECPv6.15.18//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Australian Tunnelling Society
X-ORIGINAL-URL:https://australiantunnellingsociety.com.au
X-WR-CALDESC:Events for Australian Tunnelling Society
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:Australia/Sydney
BEGIN:STANDARD
TZOFFSETFROM:+1100
TZOFFSETTO:+1000
TZNAME:AEST
DTSTART:20230401T160000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1000
TZOFFSETTO:+1100
TZNAME:AEDT
DTSTART:20230930T160000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1100
TZOFFSETTO:+1000
TZNAME:AEST
DTSTART:20240406T160000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1000
TZOFFSETTO:+1100
TZNAME:AEDT
DTSTART:20241005T160000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1100
TZOFFSETTO:+1000
TZNAME:AEST
DTSTART:20250405T160000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1000
TZOFFSETTO:+1100
TZNAME:AEDT
DTSTART:20251004T160000
END:DAYLIGHT
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=Australia/Sydney:20240801T180000
DTEND;TZID=Australia/Sydney:20240801T200000
DTSTAMP:20260410T002144
CREATED:20240723T040732Z
LAST-MODIFIED:20240724T044457Z
UID:19402-1722535200-1722542400@australiantunnellingsociety.com.au
SUMMARY:Rozelle Interchange Project - Presentation and Q&A
DESCRIPTION:Overcoming the complex geometry and geology during design and construction of the Rozelle Interchange tunnel network\nTHURSDAY 1 AUGUST – REGISTRATION LINK NOW AVAILABLE!\nRozelle Interchange was the final stage (Stage 3b) of the WestConnex project. As stated in the project title\, ‘Interchange’\, this project linked the M4 East and M4-M8 Link projects with the future Western Harbour Tunnel project. To achieve these connections and minimise surface impacts\, complex road and underground ventilation alignments were needed. This presentation covers design and construction challenges to overcome the complex road alignment (including 50 tunnel over tunnel crossovers) and equally complex geology. \nTimings\n5:30 – 6:00 – Networking and snacks \n6:00 – 7:00 – Presentation and Q&A \n7:00 – 8:00 – Networking \nLearning outcomes\n\nUnderstand the Rozelle Interchange Tunnel.\nLearn how complex geology coupled with complex road geometry\, including 4 levels of tunnels was safely constructed.\n\nSpeakers\n \nBeatriz Estrada\nPrincipal\, PSM \nBeatriz is a Principal Engineering Geologist at PSM. She has worked as part of the design and construction teams of numerous tunnel projects. She has been the technical lead for the development of the geotechnical models for multiple tunnel projects in Sydney including Rozelle Interchange\, Sydney Metro City and Southwest and Western Harbour Tunnel\, Southern Tunnel Works. \n  \n \nMark Trim\nPrincipal Tunnel Engineer\, Delve Underground \nMark is the Underground and Tunnels Practice Lead for Delve Underground’s Australian and New Zealand Region. He has 26 years of experience working as a design engineer and design manager specializing in permanent and temporary underground structures. He has in-depth knowledge of empirical and numerical modelling methods and has designed tunnels using SEM\, tunnel boring machines and cut-and-cover excavation techniques.
URL:https://australiantunnellingsociety.com.au/ats-event/rozelle-interchange-project-save-the-date/
LOCATION:EA Sydney Office\, Mezzanine Level\, 44 Market Street\, Sydney\, New South Wales\, 2000\, Australia
CATEGORIES:New South Wales,Online
ATTACH;FMTTYPE=image/jpeg:https://australiantunnellingsociety.com.au/wp-content/uploads/2024/07/cccdf2657f6d4231a104d3e19907faeb.jpg
END:VEVENT
END:VCALENDAR